There are many potential measures of performance for evaluating the success of a construction project. All address performance in three key areas: scope, schedule and budget. In a performance measurement framework where senior management wishes to minimise the numberof performance measures it employs, while ensuring maximal coverage or visibility into the programme, having a tool that captures each of the three areas would be ideal. Project managers have used Earned Value Management (EVM) for over 40 years to track actual schedule progress and actual costs against project plans. Earned Value Management has traditionally been applied to individual projects on which the manager is accountable for both schedule and cost variances. This paper proposes methods to apply EVM principles to allow: (1) analysis of portfolios of construction projects; (2) incorporation of the analysis into an innovative pay‐for‐performance human resources practice; and (3) use of regression analysis to develop baseline earned value curves. These extensions fit the needs of many government managers, who oversee a range of projects by multiple contractors, and whose cost risk is primarily due to schedule slips and change orders. Earned Value Management is described in the context of project oversight, and a dashboard system of performance measures is proposed for quickly assessing individual projects and portfolios. A method of generating standardised planned value curves is then specified, based on data from previous and ongoing projects. The paper concludes by showing how the US General Services Administration’s Public Buildings Service is using these methods to analyse and oversee its portfolio of new construction and major repair and alteration projects.
Article navigation
1 March 2005
Case Report|
March 01 2005
Assessing the performance of construction projects: Implementing earned value management at the General Services Administration Available to Purchase
Carlos M. Alvarado;
Carlos M. Alvarado
Associate, Booz Allen Hamilton, Inc., 8283 Greensboro Dr., McLean, VA 22102, USA; Tel: +1 703 902 5675; E‐mail: alvarado_carlos@bah.com; Website: www.boozallen.com
Search for other works by this author on:
Robert P. Silverman;
Robert P. Silverman
Senior Associate at Booz Allen Hamilton
Search for other works by this author on:
David S. Wilson
David S. Wilson
an Associate at Booz Allen Hamilton
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1741-0983
Print ISSN: 1472-5967
© Emerald Group Publishing Limited
2004
Journal of Facilities Management (2005) 3 (1): 92–105.
Citation
Alvarado CM, Silverman RP, Wilson DS (2005), "Assessing the performance of construction projects: Implementing earned value management at the General Services Administration". Journal of Facilities Management, Vol. 3 No. 1 pp. 92–105, doi: https://doi.org/10.1108/14725960510808419
Download citation file:
Suggested Reading
Integrated cost, quality, risk and schedule control through earned value management (EVM)
Journal of Engineering, Design and Technology (December,2018)
Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia
Construction Innovation: Information Process Management (July,2019)
The development of a model to support synchronous change
Measuring Business Excellence (September,2005)
Project outcomes and outputs: making the intangible tangible
Measuring Business Excellence (December,2005)
Measuring performance within the supply chain of a large scale project
Supply Chain Management: An International Journal (January,2007)
Related Chapters
Performance measures for highway structures
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
How are they doing? The Application of Data Envelopment Analysis to Develop a Strategic Performance Appraisal on Individual Level
A Focused Issue on Building New Competences in Dynamic Environments
What Matters with PMS? Critical Check Points in the Success of PMS
Performance Measurement and Management Control: Contemporary Issues
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
