A road tunnel 13·5 m in diameter and 800 m long has recently been constructed, through chalk, as part of the Ramsgate Harbour Approach Road Scheme. For the first time in the United Kingdom tunnelling has involved primary support being provided by a system of prevaults followed by the installation of an unreinforced concrete lining. This paper describes how an iterative grouting solution was evolved in response to unstable ground conditions during the early phases of tunnelling. As the tunnel drive progressed, and greater knowledge of the engineering behaviour of the chalk was gained, decisions were made to carry out trial injections using the tube-àmanchette and lance methods. These were installed from the surface in areas where it was perceived that future problems might occur. A comparison is drawn between the efficiency and relevance of the two systems in the ground conditions encountered on site.
Article navigation
July 2002
Research Article|
July 01 2002
A comparison between tube-à-manchette and lance grouting to assist tunnel excavation through chalk
T. G. Newman;
T. G. Newman
Geotechnical Engineer
Thames Water Utilities Ltd
Middlesex, UK
Search for other works by this author on:
J. L. Ingle
J. L. Ingle
Principal
JIA Associates
Hertfordshire, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
November 30 2001
Accepted:
March 26 2002
Online ISSN: 1751-8563
Print ISSN: 1353-2618
© 2002 Thomas Telford Ltd
2002
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2002) 155 (3): 175–186.
Article history
Received:
November 30 2001
Accepted:
March 26 2002
Citation
Newman TG, Ingle JL (2002), "A comparison between tube-à-manchette and lance grouting to assist tunnel excavation through chalk". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 155 No. 3 pp. 175–186, doi: https://doi.org/10.1680/geng.2002.155.3.175
Download citation file:
New and popular articles
Suggested Reading
Use of bacterial ureolysis for improved gelation of silica sol in rock grouting
Geotechnique Letters (November,2013)
Laboratory investigation of shaft grouting
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (February,2015)
Iron- and calcium-based biogrouts for porous soils
Proceedings of the Institution of Civil Engineers - Construction Materials (November,2012)
Tube-a-manchette grouting at Upper Rivington reservoir
Dams and Reservoirs (September,2013)
Ground response and grout distribution by field soil grouting
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (November,2015)
Related Chapters
Field Measurement by Fully Grouted Vibrating Wire Piezometers
Crossrail Project: Infrastructure Design and Construction
Analysis of single-fluid jet grouting
Ground and Soil Improvement
Response of Buildings Supported on Shallow Footings to Tunnelling Induced Ground Movements: A Case Study of Selected Buildings at Bond Street Station.
Crossrail Project: Infrastructure design and construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
