Construction dewatering is often required to control groundwater when excavations are made in Chalk, which is a relatively soft fissured limestone. The rate of groundwater inflow and any associated instability in an excavation are controlled by the hydrogeological setting and the degree of weathering of the chalk. Structureless Chalk or highly weathered structured Chalk may exhibit groundwater-related instability comparable to coarse geotechnical soils such as sands and gravels. Conversely, less weathered structured Chalk may act like massive fissured rock, where large water inflows can occur along pre-existing bedding planes, fissures and other geological features such as sheet flints. The applicability of construction dewatering techniques is strongly influenced by permeability, which can be related indirectly to weathering grade of Chalk. This paper includes data on 49 case histories, from the literature and the authors’ experience, of construction dewatering in Chalk and presents guidance on dewatering methods to be used in different grades of Chalk; this is an update of previous guidance provided by the authors in 1990. Recommendations are given for appropriate ground investigation techniques relevant to construction dewatering, including well pumping tests and dewatering trials.
Article navigation
August 2017
Editors
Research Article|
February 08 2017
Construction dewatering in Chalk
Martin Preene, BEng, PhD, CEng, CGeol, CSci, CEnv, FICE, FGS, C.WEM, FCIWEM;
Martin Preene, BEng, PhD, CEng, CGeol, CSci, CEnv, FICE, FGS, C.WEM, FCIWEM
Director
Preene Groundwater Consulting Limited, Wakefield, UK (corresponding author: mp@preene.com)
Search for other works by this author on:
Toby O. L. Roberts, PhD, CEng, CGeol, FREng, FICE, FGS
Toby O. L. Roberts, PhD, CEng, CGeol, FREng, FICE, FGS
Executive Chairman
WJ Groundwater Limited, Watford, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
August 02 2016
Accepted:
December 16 2016
Online ISSN: 1751-8563
Print ISSN: 1353-2618
ICE Publishing: All rights reserved
2016
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2017) 170 (4): 367–390.
Article history
Received:
August 02 2016
Accepted:
December 16 2016
Citation
Preene M, Roberts TOL (2017), "Construction dewatering in Chalk". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 170 No. 4 pp. 367–390, doi: https://doi.org/10.1680/jgeen.16.00142
Download citation file:
New and popular articles
Suggested Reading
The changing nature of groundwater control for temporary works
Proceedings of the Institution of Civil Engineers - Civil Engineering (February,2023)
Groundwater control for construction in the Lambeth Group
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (October,2002)
Ground-freezing experience on the east side access Northern Boulevard crossing, New York
Proceedings of the Institution of Civil Engineers - Ground Improvement (June,2017)
A soil-nailed excavation for the Brisbane Airport Link project, Australia
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (April,2014)
Battersea cable tunnel: powering regeneration in central London, UK.
Proceedings of the Institution of Civil Engineers - Civil Engineering (January,2019)
Related Chapters
Groundwater control
ICE Manual of Geotechnical Engineering, Volume II: Geotechnical design, construction and verification
Predict Environmental Conditions Using Groundwater Interpretation in Subdistrict Hamparan Perak, Deli Serdang, North Sumatera
Proceedings of MICoMS 2017
Groundwater
The Essence of Geotechnical Engineering: 60 years of Géotechnique
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
