Excavation of the western ticket hall box at Tottenham Court Road station represented a critical path activity of the Crossrail railway project in London, UK. Base slab construction and preparatory sprayed concrete lining works needed to be completed before the arrival of the two tunnel boring machines. A full observational method (OM) design was implemented to eliminate the lowest level of temporary propping, resulting in a 13 m prop-free excavation at the bottom of the 30 m deep diaphragm wall station box. This paper describes the design and successful implementation of the OM, which eliminated the need to fabricate, install and remove the fifth level of temporary propping. It covers the comprehensive review of the original design input parameters, back analysis of the most probable geotechnical design parameters and comparison of wall deflection and forces in the temporary props from early stages of the construction works. The robust strategy formulated as part of the observational method design to control the subsequent excavation is described: this included trigger criteria, a review process and predetermined contingency measures to ensure safe execution of the excavation works. A genuinely collaborative effort between client, permanent and temporary works designers, independent design checker and the contractor is elaborated. Cost and programme savings achieved by implementation of the observational method approach are outlined.
Article navigation
April 2014
Research Article|
April 01 2014
Application of observational method at Crossrail Tottenham Court Road station, UK
Hoe-Chian Yeow, BSc, PhD, CEng, MICE;
Hoe-Chian Yeow, BSc, PhD, CEng, MICE
Technical Director
Flint and Neill Ltd, London, UK
Search for other works by this author on:
Duncan Nicholson, BSc, CEng, MICE;
Duncan Nicholson, BSc, CEng, MICE
Director
Arup, London, UK
Search for other works by this author on:
Chui-Loung Man, BEng;
Chui-Loung Man, BEng
Senior Geotechnical Engineer
Atkins, London, UK
Search for other works by this author on:
Alistair Ringer, MA, MEng, CEng, MICE;
Alistair Ringer, MA, MEng, CEng, MICE
Senior Engineer
Kier Engineering, Bedfordshire, UK
Search for other works by this author on:
Paul Glass, BEng, CEng, FICE, FICES;
Paul Glass, BEng, CEng, FICE, FICES
Technical Director
BFK JV, London, UK
Search for other works by this author on:
Mike Black, MSc, CSci, CGeol, FGS
Mike Black, MSc, CSci, CGeol, FGS
Head of Geotechnics
Crossrail Ltd, London, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Revision Received:
April 01 2013
Accepted:
February 04 2014
Online ISSN: 1751-8563
Print ISSN: 1353-2618
ICE Publishing: All rights reserved
2014
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2014) 167 (2): 182–193.
Article history
Revision Received:
April 01 2013
Accepted:
February 04 2014
Citation
Yeow H, Nicholson D, Man C, Ringer A, Glass P, Black M (2014), "Application of observational method at Crossrail Tottenham Court Road station, UK". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 167 No. 2 pp. 182–193, doi: https://doi.org/10.1680/geng.13.00035
Download citation file:
New and popular articles
Suggested Reading
A review of methods for modelling drystone retaining walls
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (June,2014)
Three-dimensional effects in the construction of a long retaining wall
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (July,2002)
Use of vibrating wire strain gauges to measure loads in tubular steel props supporting deep retaining walls
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (January,1999)
Briefing: Heat-wave-coping measures for housing
Proceedings of the Institution of Civil Engineers - Energy (August,2009)
Applying triaxial compression stiffness data to settlement prediction of shallow foundations on cohesionless soil
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (October,2000)
Related Chapters
The Use of Shape Accel Arrays (SAA) for Measuring Retaining Wall Deflection
Crossrail Project: Infrastructure Design and Construction
General requirements
ICE Specification for Piling and Embedded Retaining Walls
Retaining structures
The Essence of Geotechnical Engineering: 60 years of Géotechnique
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.