A new northern access road located to the north of the existing Airport Drive on a currently undeveloped area was proposed by Brisbane Airport Corporation to link the new duplicated Gateway Motorway to the Brisbane international and domestic terminals. One of many design and construction challenges faced in this project was to build five drainage structures on deep soft ground at specified locations to enable excavation of a drainage channel underneath the pavement in future, to divert flood water across the alignment without affecting traffic or causing adverse impacts on the structure itself and adjacent embankments. Considering the presence of deep compressible clays, it was critical to employ appropriate ground improvement techniques to reduce in-service settlements along the embankment and in particular adjacent to rigid piled structures. In addition to the appropriate ground treatment, design of cost-effective retaining structures to confine earth behind the abutment piles, with a view to controlling ground displacements and improving long-term stability, also became a critical item to be resolved during the design phase. This paper discusses the design of the structure approaches, the retaining structures and the pile foundations associated with the construction of drainage structure A within the west area of the project.
Article navigation
December 2015
Editors
Research Article|
October 05 2015
Innovative design for drainage structure on deep soft ground
Daiquan Yang, PhD, CEng, NPER, RPEQ, MIES, MASCE, MISSMGE, MIEAust;
Daiquan Yang, PhD, CEng, NPER, RPEQ, MIES, MASCE, MISSMGE, MIEAust
Principal
Coffey Geotechnics Pty Ltd, Brisbane, Australia
Search for other works by this author on:
Jay Ameratunga, MEng, PhD, CEng, RPEQ, FIEAust;
Jay Ameratunga, MEng, PhD, CEng, RPEQ, FIEAust
Senior Principal
Coffey Geotechnics Pty Ltd, Brisbane, Australia
Search for other works by this author on:
Jacob Dunstan, BEng, MEng, CEng, RPEQ, MIEAust;
Jacob Dunstan, BEng, MEng, CEng, RPEQ, MIEAust
Principal
Coffey Geotechnics Pty Ltd, Brisbane, Australia
Search for other works by this author on:
Ian Shipway, BSc, RPEQ, MIEAust
Ian Shipway, BSc, RPEQ, MIEAust
Senior Principal
Coffey Geotechnics Pty Ltd, Brisbane, Australia
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
July 11 2014
Accepted:
May 19 2015
Online ISSN: 1751-8563
Print ISSN: 1353-2618
ICE Publishing: All rights reserved
2015
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2015) 168 (6): 483–497.
Article history
Received:
July 11 2014
Accepted:
May 19 2015
Citation
Yang D, Ameratunga J, Dunstan J, Shipway I (2015), "Innovative design for drainage structure on deep soft ground". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 168 No. 6 pp. 483–497, doi: https://doi.org/10.1680/jgeen.14.00115
Download citation file:
New and popular articles
Suggested Reading
Design and construction of the Toome bypass, Northern Ireland
Proceedings of the Institution of Civil Engineers - Municipal Engineer (September,2005)
Bridge distress caused by approach embankment settlement
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (April,2008)
Settlement of a bridge embankment on soft soils
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (January,2004)
Castle Bridge, Weston-Super-Mare, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
OBITUARY. THOMAS PAGE, 1803-1877.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1877)
Related Chapters
Analysis of progressive failure and cracking in old British dams
Selected papers on geotechnical engineering by P R Vaughan
UK Implementation of Eurocodes for Bridge Design – An Overview
Bridge Design to Eurocodes: UK Implementation
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.