The ICD Brookfield Place development in Dubai comprises a 290 m tall tower with a seven-level basement (the deepest in Dubai at the time of construction). A five-level basement, with temporary anchored retaining walls along three sides, was previously constructed on the site along with all the foundation piles for the intended structure. The basement was later backfilled when construction ceased in 2009. The previous basement provided considerable constraints to construction of the new basement. Particular challenges included deepening of the basement, the construction of new deeper temporary retaining walls, pile reuse and construction in close proximity to adjacent structures. This paper describes how the constraints were assessed and how a basement construction strategy was developed to overcome them.
Article navigation
August 2021
Editors
Research Article|
April 28 2021
Planning the construction of a deep basement on the site of a previous retained excavation
Andrew Smith, MA, PhD, MBA, CEng, FICE, CGeol, FGS;
Andrew Smith, MA, PhD, MBA, CEng, FICE, CGeol, FGS
Technical Director, Coffey Geotechnics Ltd, Harrogate, UK (corresponding author: andrew.smith@coffey.com)
Search for other works by this author on:
Ria Blackmore, MEng, CEng, MICE;
Ria Blackmore, MEng, CEng, MICE
Principal Geotechnical Engineer, Coffey Geotechnics Ltd, Manchester, UK
Search for other works by this author on:
Ying Tay, BEng, PhD, CEng, FICE
;
Ying Tay, BEng, PhD, CEng, FICE
Principal Geotechnical Engineer, Golder Associates Pty Ltd, formerly Coffey Services Australia Pty Ltd, Melbourne, Australia
Search for other works by this author on:
Pawan Sethi, BEng (Hons), MSc, CEng, MICE, CPEng, FIEAust
Pawan Sethi, BEng (Hons), MSc, CEng, MICE, CPEng, FIEAust
Group Manager – Geotechnical Engineering (TEK), John Holland Group Pty Ltd, Sydney, Australia; formerly Coffey Services Australia Pty Ltd, Sydney, Australia
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
August 03 2020
Accepted:
March 09 2021
Online ISSN: 1751-8563
Print ISSN: 1353-2618
ICE Publishing: All rights reserved
2021
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (2021) 174 (4): 461–472.
Article history
Received:
August 03 2020
Accepted:
March 09 2021
Citation
Smith A, Blackmore R, Tay Y, Sethi P (2021), "Planning the construction of a deep basement on the site of a previous retained excavation". Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, Vol. 174 No. 4 pp. 461–472, doi: https://doi.org/10.1680/jgeen.20.00156
Download citation file:
New and popular articles
Suggested Reading
The design of temporary excavation support to Eurocode 7
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (February,2012)
Up–up construction takes off in Korea
Proceedings of the Institution of Civil Engineers - Civil Engineering (August,2005)
Diaphragm wall displacement due to creep of soft clay
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (June,2014)
Observations of ground and structure movements during site redevelopment in Dublin
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (October,2002)
A soil-nailed excavation for the Brisbane Airport Link project, Australia
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (April,2014)
Related Chapters
Ground and rock fragmentation – drilling and blasting
Civil Excavations and Tunnelling: A practical guide
Earth movers, excavators and open-cut excavations
Civil Excavations and Tunnelling: A practical guide
Raising, sinking and large subsurface excavations
Civil Excavations and Tunnelling: A practical guide
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.