The heave of the central pillars of a railway bridge, founded on large-diameter bored piles, is a consequence of gypsum crystal growth in an anhydritic claystone stratum underlying the tip of the piles. The heave mechanism is explained by the presence of circulating water in the fractured anhydritic level. The model developed to reproduce the observed phenomena integrates a set of balance equations that includes two soluble species (gypsum and anhydrite) in addition to the inert minerals, kinetic equations for dissolution and precipitation, mechanical equilibrium, and the effect of precipitated mass on induced volumetric strains. Model calculations are compared with measured long-term field records of heave. Most of the model parameters are physico-chemical constants, a positive feature that limits the effort to calibrate material constants. The model is capable of accurate mid-term heave prediction, and it also correctly includes the effect of building a surface embankment with the purpose of reducing the heave rate. A sensitivity study is reported to achieve a deeper insight into the phenomena, and to investigate the relevance of a few controlling parameters.
Article navigation
July 2013
Research Article|
July 01 2013
Heave of a railway bridge: modelling gypsum crystal growth Available to Purchase
A. RAMON;
A. RAMON
*
* Department of Geotechnical Engineering and Geosciences, Universitat Politècnica de Catalunya, Barcelona, Spain.
Search for other works by this author on:
E.E. ALONSO
E.E. ALONSO
*
* Department of Geotechnical Engineering and Geosciences, Universitat Politècnica de Catalunya, Barcelona, Spain.
Search for other works by this author on:
* Department of Geotechnical Engineering and Geosciences, Universitat Politècnica de Catalunya, Barcelona, Spain.
Publisher: Emerald Publishing
Received:
March 09 2012
Accepted:
October 19 2012
Online ISSN: 1751-7656
Print ISSN: 0016-8505
© 2013 Thomas Telford Ltd
2013
Geotechnique (2013) 63 (9): 720–732.
Article history
Received:
March 09 2012
Accepted:
October 19 2012
Citation
RAMON A, ALONSO E (2013), "Heave of a railway bridge: modelling gypsum crystal growth". Geotechnique, Vol. 63 No. 9 pp. 720–732, doi: https://doi.org/10.1680/geot.12.P.035
Download citation file:
Suggested Reading
Extreme expansive phenomena in anhydritic-gypsiferous claystone: the case of Lilla tunnel
Geotechnique (June,2013)
Hydro-chemo-mechanical modelling of tunnels in sulfated rocks
Geotechnique (August,2017)
Massive sulfate attack to cement-treated railway embankments
Geotechnique (March,2013)
Displacements of bridge foundations on sedimentary soft rock: A case study on small-strain stiffness
Geotechnique (June,1997)
Salt heaving in the Sahara
Geotechnique (September,1985)
Related Chapters
Massive sulfate attack to cement-treated railway embankments
Bio- and Chemo-Mechanical Processes in Geotechnical Engineering: Géotechnique Symposium in Print 2013
Soil science and interdisciplinary aspects of geotechnical engineering
The Essence of Geotechnical Engineering: 60 years of Géotechnique
Weathering of submerged stressed calcarenites: chemo-mechanical coupling mechanisms
Bio- and Chemo-Mechanical Processes in Geotechnical Engineering: Géotechnique Symposium in Print 2013
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
