In the present study, an investigation was performed to assess the possible cause of distress to the geogrid reinforced earth walls constructed for a flyover. The investigation methodology included site visits and observations, collection of the material samples (backfill and geogrid) for laboratory testing, and back analyses of original design using a conventional method and numerical analysis. The temporary rise of pore water pressure due to the heavy rains during the construction period and the internal stability of reinforced earth walls have been identified as the possible causes of the observed distresses. Further, installation of the driven soil nails of specified diameter and length at suitable spacings, particularly in the locations of distress, were proposed as the rehabilitation measure. The results of the numerical analyses indicated that introduction of soil nails: (a) caused redistribution of axial forces among the geogrid layers and soils, (b) significantly reduced the lateral displacement and (c) improved the overall stability of the reinforced earth walls.
Article navigation
November 2011
Research Article|
November 01 2011
Soil nailing for rehabilitation of reinforced earth wall distress Available to Purchase
G. L. Sivakumar Babu, BTech, ME, PhD;
G. L. Sivakumar Babu, BTech, ME, PhD
Professor
Department of Civil Engineering, Indian Institute of Science, Bangalore, Karnataka, India
Search for other works by this author on:
Vikas Pratap Singh, BE, MTech, PhD;
Vikas Pratap Singh, BE, MTech, PhD
Research Associate
Department of Civil Engineering, Indian Institute of Science, Bangalore, Karnataka, India
Search for other works by this author on:
B. R. Srinivasa Murthy, BE, MTech, PhD
B. R. Srinivasa Murthy, BE, MTech, PhD
Professor (retired)
Department of Civil Engineering, Indian Institute of Science, Bangalore, Karnataka, India
Search for other works by this author on:
Publisher: Emerald Publishing
Revision Received:
September 24 2009
Accepted:
November 03 2010
Online ISSN: 1755-0769
Print ISSN: 1755-0750
ICE Publishing: All rights reserved
2011
Proceedings of the Institution of Civil Engineers - Ground Improvement (2011) 164 (4): 235–244.
Article history
Revision Received:
September 24 2009
Accepted:
November 03 2010
Citation
Sivakumar Babu GL, Singh VP, Srinivasa Murthy BR (2011), "Soil nailing for rehabilitation of reinforced earth wall distress". Proceedings of the Institution of Civil Engineers - Ground Improvement, Vol. 164 No. 4 pp. 235–244, doi: https://doi.org/10.1680/grim.9.00031
Download citation file:
Suggested Reading
Predicting future AI failures from historic examples
Foresight (November,2018)
Vulnerability analysis of highway networks, methodology and case study
Proceedings of the Institution of Civil Engineers - Transport (November,2001)
Briefing: Education to prepare for the practice of forensic engineering
Proceedings of the Institution of Civil Engineers - Forensic Engineering (August,2012)
Briefing: Rainfall-induced landslides in Singapore
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (October,2001)
Understanding construction project failure in southern Africa
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (February,2012)
Related Chapters
Do Retailers Get Blamed When Manufacturer Brands Fail? Measurement of Multiloci Attributions and Spillover Effects
Marketing Accountability for Marketing and Non-marketing Outcomes
Causes of Bridge Failures
Bridge Failures and Lessons Learnt: Future-proofing to Prevent Disasters
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.