Skip to article sections
Purpose

This article aims to determine if and how social capital enables inter-organizational knowledge and information transfer in long-term care (LTC) for older persons and within what boundary conditions.

Design/methodology/approach

The study builds on a survey of key LTC actors (N = 265) representing public, private and non-governmental organizations.

Findings

Our findings revealed a positive relationship between two social capital dimensions and knowledge and information transfer. In addition, partial support was provided for the moderating effects of sector and resource availability.

Originality/value

Our study explores to what extent social capital facilitates inter-organizational knowledge and information transfer in LTC. Secondly, it contributes to the broader knowledge management literature by disclosing two boundary conditions in the above relationship.

With EU populations aging rapidly, the number of older individuals with long-term care (LTC) needs is projected to reach 38.1 million by 2050 (European Commission, 2021a). The supply and quality of formal care services for older people are already insufficient. Inter-organizational collaboration is increasingly considered critical in maintaining and improving accessibility and quality of formal LTC (Simons et al., 2022; European Commission, 2021a; Lørum and Smith, 2024), as responsibilities for LTC services are split between health and social care domains or funded from different (national or local) levels in many countries across Europe (Spasova et al., 2018; European Commission, 2021b), calling for research on the facilitators of inter-organizational collaboration (Yoshida et al., 2024; van der Schors et al., 2021).

Knowledge and information transfer is a major facilitator and a form of inter-organizational collaboration in knowledge-intensive LTC (Doornebosch et al., 2022; Hujala and Laihonen, 2021), where single organizations may not provide entire care on their own, nor are they competent or knowledgeable of all aspects of health and social care, and where insufficient knowledge and information may compromise health and care (Gonçalves et al., 2022). Prior LTC research has focused on knowledge and information sharing within organizational boundaries (Kosklin et al., 2023) or in integrated care teams (Rydenfält et al., 2024; Doornebosch et al., 2022). In this article we address knowledge and information transfer between LTC-related organizations and examine their social capital as a potential facilitator.

Traditionally formal LTC was mostly provided by public organizations in the European Union (EU), except for Germany and the Netherlands, where the private sector is the major LTC provider (Riedel et al., 2016). Currently the public sector may no longer meet the growing demand, thus LTC services are also provided by private (non-profit and for-profit) and non-governmental organizations, though with variations among EU countries (European Commission, 2021a). Countries also vary in regards to their history of private and non-governmental organization involvement in LTC, which is a relatively recent phenomenon in the new EU member states (Schulmann et al., 2014). Against this background, inter-organizational knowledge and information transfer in LTC is becoming even more critical and complex than in other industries. Research on sector-specific enablers of knowledge and information transfer in LTC remains scant (Zbuchea et al., 2020; Carlini et al., 2023).

To address the above gaps, this article aims to determine if and how social capital enables knowledge and information transfer in LTC organizations and within what boundary conditions. In doing so, we build on the theories of social capital and interpersonal behavior. Although people of all ages may require LTC, in this study we focus on LTC for older people, which refers to a range of personal, social and medical services related to the help in daily living activities and/or permanent nursing care, provided at one’s home or in institutionalized settings. Based on the results of a survey of key LTC actors from public, private and non-governmental organizations in Lithuania, our findings show that the structural and relational dimensions of social capital facilitate inter-organizational knowledge and information transfer in LTC. Secondly, this relationship is partially moderated by the sector and resource availability.

In a broad sense inter-organizational knowledge and information transfer (also referred to as knowledge and/or information sharing in literature) may be defined as a process through which organizations share, receive and are affected by knowledge and information received from others (Van Wijk et al., 2008). In health and social care, it is believed to lead to improved service accessibility and quality (Radević et al., 2023; Pedersen et al., 2023); however, it is more complex than in other industries, as it involves organizations assuming different roles. While healthcare organizations deal with health issues and the work of health professionals, those in the social sector provide support to older people in their daily activities and organize the work of social workers. The first ones are usually funded at the national, and the latter at the national, regional or local levels (European Commission, 2021a). LTC actors also represent different occupations and sectors, which vary in perceived public status, aims, levels of power, competence and resources, etc., which may inhibit their understanding of the roles and abilities of other organizations and lead to transfer failure (Auschra, 2018; Lyng et al., 2024).

Social capital theory has been used in recent knowledge management research in different domains (e.g. Zhao and Detlor, 2023; Santos et al., 2023). Its basic premise is that networks of more or less institutionalized relationships constitute valuable resources facilitating collective actions (Adler and Kwon, 2002; Bourdieu, 1985). It distinguishes between individual and collective (e.g. organizational) capital (Coleman, 1988; Putnam, 1993). This article follows the collective perspective, widely used in health and social care literature (Derose and Varda, 2009). Social capital is a three-dimensional concept referring to existing and prospective resources embedded within a network of relationships and available through them (Nahapiet and Ghoshal, 1998). Its structural dimension relates to relationship configuration and strength, which provide opportunity to access resources (Nahapiet and Ghoshal, 1998). The relational dimension refers to the nature of relationships deriving from interaction between network ties, such as trust and reciprocity (Coleman, 1988). Finally, the cognitive dimension relates to shared systems of meaning among network ties (Nahapiet and Ghoshal, 1998).

Prior research has built on social capital theory a lot to explain social capital effects on knowledge transfer; yet often such studies focused on selected social capital dimensions (Lee et al., 2023; McFadyen and Cannella, 2004). We follow the above multi-dimensional perspective and propose that social capital facilitates knowledge and information transfer in multiple ways (Adler and Kwon, 2002; Maurer et al., 2011; Santos et al., 2023). First, social relations of organizational members provide opportunity for knowledge transfer and more frequent interactions with other network members, which strengthen existing relations, that at the start may be weak (Oh and Bush, 2016). Thus, larger networks and more frequent and closer interaction provide a wider scope for knowledge transfer between organizations (Ferrer-Serrano et al., 2022; Hemmert, 2019).

Secondly, knowledge and information transfer require trust in other network members (Levin and Walter, 2019; Ferrer-Serrano et al., 2022). Trust is critical in LTC, where actors vary in perceived public status, professional values, competences, problem solving approaches, etc. (Song et al., 2019; Gonçalves et al., 2024; Yadav et al., 2025). Thus, trust in other network members’ ability to perform their roles and willingness to reciprocate are indispensable. Trust instils belief in careful and appropriate handling of the acquired information and knowledge by others and leads to enhanced reciprocity, which also facilitates inter-organizational knowledge and information transfer (Ganguly et al., 2019).

Finally, inter-organizational knowledge and information transfer necessitate a shared vision, as a lack of mutual understanding between organizations may inhibit their willingness and ability to work together (Lee et al., 2023). The pursuit and implementation of a shared vision require the development of a common culture, or shared values and interests (Selsky and Parker, 2005; Levin and Walter, 2019). These are critical in LTC where engagement of private, public and non-governmental organizations may be driven by different motivations, and characterized by different cultural and professional values and specializations (Auschra, 2018).

Prior research in other industries has yielded evidence in support of the relationship between some dimensions of social capital and knowledge and information transfer too (e.g. Miković et al., 2020; Santos et al., 2023; Rodríguez-Aceves et al., 2023; Lee et al., 2023).

Hence, we propose the following hypothesis:

H1.

(a) Structural (number of relations with other LTC actors and frequency of interaction with them), (b) relational (trust and reciprocity), and (c) cognitive dimensions (shared vision and values) of social capital are positively related to knowledge and information transfer.

In Europe LTC services are provided by public (governmental/municipal), private (for-profit and non-profit) and non-governmental (NGO) organizations [1]. Knowledge and information sharing among different sector organizations is complex as it may be driven by different factors stemming from varying macro-economic and organizational contexts (Susha et al., 2023; Bloice and Burnett, 2016). In this paper we explore the role of such organizational elements as structure and culture and their relationship with social capital.

If compared to private and non-governmental organizations, public organizations are typically more bureaucratic, with higher hierarchical structures and larger degrees of centralization and formalization (Reynaers and van der Wal, 2018), which impedes knowledge and information transfer (Radević et al., 2023). Knowledge transfer faces more constraints in the public sector. Its employees often associate knowledge with power, which reduces their willingness to share it for fear of losing it (Yang and Maxwell, 2011). Loss of power has been acknowledged as a critical barrier to knowledge transfer (Zhao and Detlor, 2023). In addition, public organizations often have vague, competing and difficult to measure goals and diverse values, which further complicates working on a common task with others (Hujala and Laihonen, 2023). In contrast to private organizations, where knowledge management is centered on the organization and its performance, public organizations need to take the broader societal context into consideration (Laihonen et al., 2024). As regards NGOs, their activities are primarily driven by social values and genuine concern about service users (Dickinson et al., 2012), and differences in others’ interests (e.g. profit-making in private organizations) may diminish NGO trust in them. NGOs may also be reluctant to partner with public organizations due to fear of increased bureaucracy and reduced flexibility and autonomy (Abendstern et al., 2018). NGOs also tend to have stronger relationships with local communities and society than other stakeholders, local government in particular (Gazley, 2010). Local governments play a critical role in LTC; thus, having none or limited prior experience of working with them precludes both trust and willingness to engage in knowledge transfer. To conclude, we expect these differences in organizational structure and culture to weaken the relationship between social capital and knowledge transfer in public and non-governmental organizations in comparison to private ones. Respectively, we propose the following hypothesis:

H2.

Sector moderates the relationship between (a) structural, (b) relational, and (c) cognitive dimensions of social capital and knowledge and information transfer, so that the relationship is the strongest in private and the weakest in NGOs.

The theory of interpersonal behavior (Triandis, 1977), proposes that human behavior is a function or intention, habit and facilitating conditions, i.e. factors whose presence or absence determine the difficulty or ease of performing a particular behavior and engaging in it. Availability of resources (e.g. time, money, etc.) needed to engage in a particular behavior is viewed as one of such facilitating conditions (Koay et al., 2022; Taylor and Todd, 1995), while lack of resources is a significant constraint. Respectively, we argue that the relationship between social capital and knowledge transfer will be stronger when resources are available and vice versa. This theory has been applied in prior knowledge management research (Koay et al., 2022; Jeon et al., 2011).

Lack of resources has been identified as an important barrier to cross-sectoral knowledge and information transfer (Susha et al., 2023; Alderwick et al., 2021). LTC actors mainly represent public organizations, NGOs, and smaller private firms, which traditionally have more limited resources (Woschke et al., 2017). Furthermore, resource availability is not uniform across sectors. Public health and social care organizations, mostly local municipal organizations, traditionally have more limited financial resources in comparison to private ones (Torchia et al., 2015; Sunnemark et al., 2024). NGOs, meanwhile, are subject to high volatility in funding opportunities (Zbuchea et al., 2020), heavily rely on donors (Miković et al., 2020) and volunteers (Curado et al., 2023), and have lesser competent human resources (Poškutė et al., 2022). Hence NGOs are more likely to have more limited resources needed for knowledge and information transfer in comparison to their public and private counterparts. On the other hand, NGOs may draw significant donations and volunteers through their extended community networks, which explains their ability to work effectively even with limited resources (Schneider, 2009). Prior research also showed that the NGO size was not related with knowledge transfer and collaboration (Kim and Peng, 2018); instead, employee altruism was found as an important predictor of knowledge sharing in NGOs (Curado et al., 2023), making a potential substitute for scarce resources. In addition, what makes NGOs distinct from other sectors is that their activities are largely driven by other than financial objectives (Enjolras and Sivesind, 2018). NGOs are likely to attach higher importance to their mission of taking care and be more willing to “go out of their way to help service users” (Dickinson et al., 2012, p. 14). In addition NGOs may be required by their donors to follow transparent procedures and humanitarian and ethical policies, which may not be the case in private organizations (Moshtari and Vanpoucke, 2021). Where NGOs seek to create social value for their wider communities and society, this vision motivates their external knowledge sharing (Bloice and Burnett, 2016). Hence, we propose the following hypothesis:

H3.

The relationship between (a) structural, (b) relational, and (c) cognitive dimensions of social capital and knowledge and information transfer is moderated by sector and resource availability, so that the relationship between social capital and knowledge and information transfer is stronger in public and private sector organizations with a higher degree of resource availability. The effect of resource availability in NGOs will be weaker.

This study was conducted in Lithuania with shrinking [2] and fast aging [3] population and large numbers of older people at risk of poverty or social exclusion [4]. LTC responsibilities here are shared horizontally by health and social care sectors (Eurocarers, 2021), commonly to many other countries in the EU, and require a better integration, as healthy life expectancy among older persons is considerably lower than the EU average. Integrated care services are relatively new and underdeveloped. Informal care has traditionally been most favored, like in other Eastern and Southern European countries; however, the demand for institutional services has grown due to a dramatic rise in old-age dependency ratio and retirement age (Poškutė and Greve, 2017). Formal LTC is insufficient and its quality is inadequate (Spasova et al., 2018). LTC services are provided by all three sectors; however, municipal providers prevail. Inter-organizational collaboration is one of the guiding principles of LTC in the Catalog of Social Services [5]. In reality, it encounters multiple barriers (Poškutė et al., 2022).

Data were collected through a survey of key LTC actors in Lithuania (home and residential care service providers, and governmental and municipal organizations responsible for LTC funding and regulating. We used total population sampling technique and aimed to invite all organizations that were reachable in our target population; therefore, we inquired and received information from the Ministry of Health, searched the websites of the Ministry of Social Security and Labor and municipalities, and this way, we gathered a comprehensive list of LTC providers in Lithuania. We also drew a list from the national business directory for cross-checking. After eliminating those whose contact details were not available, we ended up with the final list of 341 organizations and organizational units (e.g. ministries had several departments responsible for different aspects of LTC). Invitations to participate were sent to the heads of the 341 organizations/units, where contact details were available, or general contact emails, who were asked to share the survey link with their employees to reach different professional groups. If requested, we supplied respondents with paper questionnaires instead of online surveys. The invitation letters included information on the study aims, procedure and participation duration. Participation was voluntary and did not pose any potential risks to research participants, and fully anonymous in order to encourage the authenticity of the survey answers. 268 questionnaires were returned and after list-wise deletion due to missing values 265 were used in analysis, of which 117 (44.5%) were online questionnaires. Sample distribution per sector is provided in Table 1.

The questionnaire was developed to take into consideration LTC specifics. The items constituting the scales were revised for relevance, clarity, and comprehension, and adapted to LTC context in consultation with LTC experts (academics and practitioners).

Social capital (independent variable). There is no single measure of social capital, as different studies employ different definitions and dimensions; however, common measures include trust, norms and values, and network structure (Widén-Wulff and Ginman, 2004) and often rely on self-reporting and Likert scales (Miković et al., 2020). We measured social capital with 10 items reflecting LTC specifics:

  1. structural dimension was operationalized as relationship number and frequency of interaction. The number of relationships was measured by asking respondents to indicate which of the 10 LTC actors (e.g. municipality staff, NGOs, etc.) they interacted with at work (min = 0, max = 10); and frequency of interaction – how often they interacted with each group (1 = never, 6 = more than once a week). Collinearity statistics of both variables remained within an acceptable range (tolerance = 33.2; VIF = 3.014). However, they were highly correlated (Pearson r = 0.817, p < 0.001) and the calculations of individual predictors in regression models were significantly affected by this correlation; therefore, a composite score of these two variables was used in the analysis (number of relationships multiplied by average frequency of interaction);

  2. relational dimension was operationalized as trust and reciprocity and measured on a three-item scale (1 = totally disagree, 6 = totally agree). Sample item is “If and when needed, other institutions would help us; therefore, we should help them as well”;

  3. cognitive dimension was operationalized as LTC vision and values and measured on a five-item scale, where respondents were asked to indicate to what extent specified LTC goals are important to their institution (1 = not important at all, 6 = highly important). Sample items are “LTC service quality improvement”; “Life quality of older persons”.

Perceived knowledge and information transfer (hereinafter knowledge transfer), the dependent variable, was measured by a five-item scale (1 = totally disagree, 6 = totally agree). Following prior research, existing scales were adapted to reflect the industry specifics. To do so, we identified major knowledge and information types shared and transfer activities through prior research review and consultations with experts in the field. Respondents were asked to indicate to what extent they shared information with other LTC actors and had information about them or from them. Sample item is “We share our experience and knowledge with other institutions”.

Resource availability (moderator) was measured on a two-item scale (1 = totally disagree, 6 = totally agree) adapted fromand He and Wei (2009), measuring availability of financial and time resources, major resources in inter-organizational knowledge and information transfer in LTC (Lim et al., 2015). Sample item is “We lack financial resources to collaborate with other institutions in LTC” (for analysis, both items were reversed so that a higher score means higher resource availability).

Sector (moderator). In Lithuania, LTC providers are classified according to their founders – municipality (state), physical person (private for-profit and non-profit), and non-governmental (NGOs; mostly international and/or church-established organizations). We asked respondents to indicate if they worked for a public, private or non-governmental organization (NGO).

Type of activity (control variable) is a binary variable that was coded based on respondent job titles, distinguishing between an administrative (municipality staff; 18.1%) and a non-administrative (care providers; 81.9%) role. To limit its potential confounding effect, we included it as a covariate in hypothesis testing.

The scales were verified by using factor analysis (principal components analysis with varimax rotation), and also tested for internal consistency and Cronbach Alpha scores between 0.806 and 0.896 were regarded as having sufficient inter-relatedness for use in the analysis (Tavakol and Dennick, 2011). See Table 1 below for the description of variables, their means, standard deviations and internal consistency scores.

As we used single-source self-reported data and measured both dependent and independent variables at the same time, common method bias could be an issue (Podsakoff et al., 2003). A multi-wave study was not used because it would have affected the response rate, as participants were difficult to reach. Instead, several widely recommended procedures were used to minimize common method variance, i.e. item randomization, reverse scoring, and variation in wording, as well as guaranteed respondent anonymity. Results of Harman’s singe-factor test (Favero and Bullock, 2015) showed that one factor accounted for 23%, which is below the recommended threshold of 50%.

To test the hypotheses, SPSS PROCESS macro 3.5 (Hayes, 2018) was used. Cohen (1992) guidance was followed to interpret effect strength (small if around 0.1, medium if around 0.3, and strong if around 0.5). The strength of correlation between independent variables (moderate positive effects where significant), condition index (less than 30) and VIF (less than 4) statistics raised no further concerns of multicollinearity issues. As different scales were used to measure the variables, mean-centered continuous variables were used in order to enhance result interpretability (Hayes, 2018).

Results of multiple regression analysis showed that the more respondents interacted with different actors (structural dimension, b = 0.26; p < 0.001) and the stronger was their trust and reciprocity in the relationships with them (relational dimension, b = 0.39; p < 0.001), the higher the level of perceived knowledge transfer they reported. However, the perceived importance of LTC vision and values was marginal and insignificant (cognitive dimension, b = 0.08, p > 0.05) when accounting for the other two dimensions of social capital (see Table 2). Therefore, hypothesis 1 was supported partially. Social capital explained approximately 27% of the results, with the relational dimension (medium effect) making the highest contribution to the total.

Hypothesis 2 posited that the relationship between social capital and knowledge transfer among LTC actors is moderated by the sector. No significant sector effects were found in case of structural and cognitive dimensions. However, a medium moderating effect of the sector was identified in the relationship between relational dimension and perceived knowledge transfer (bw1 = 0.41 p < 0.05; bw2 = 0.43, p < 0.05). More specifically, higher levels of trust and reciprocity (relational dimension) predicted higher levels of perceived knowledge transfer in private and public sectors (b = 0.45 p < 0.001 and b = 0.46 p < 0.001 respectively); whereas in NGOs, the relationship was not significant (b = 0.04, p > 0.05, see Figure 1). This means that contrary to private and public sectors, there is no correlation between trust and reciprocity towards other organizations and the perceived extent to which NGOs share knowledge with others, which confirmed our hypothesis about a weaker relationship in NGOs. However, private and public sector slopes were rather similar, contrary to our expectation that the relationship will be the strongest in the private sector.

Furthermore, the relationship between the cognitive dimension of social capital and perceived knowledge transfer was also moderated by sector (bw1 = 0.33 p < 0.05; bw2 = 0.29, p < 0.05). The relationship was significantly different in private and public sectors compared to NGOs; however, individual slopes were mutually non-significant (see Figure 2).

Hypothesis 3 proposed that the relationship between social capital and knowledge transfer depends on resource availability. Consistent with our hypothesis, the availability of resources moderated the relationship between structural and relational dimensions, and knowledge transfer (b = 0.15, p < 0.01 and b = 0.10, p < 0.05 respectively). More specifically, when resource availability was perceived as relatively low (16th percentile of conditioning values), the structural dimension of social capital had no effect on perceived knowledge transfer. However, when resource availability was perceived as high (84th percentile), the relationship was significant in all sectors, including NGOs (medium effects). Lastly, at a medium level of resource availability (50th percentile) the relationship was significant only in the public sector (see Figure 3 below).

In case of the relational dimension of social capital, its relationship with knowledge transfer was not significant in NGOs at any level of resource availability. However, it was significant in private (medium to high effects at medium and high level of resource availability) and public sectors (increasing from small to high effect at all levels of resource availability, see Figure 4 below).

There was no significant interaction between resource availability and cognitive dimension (attitudes towards LTC values, b = −0.12, p > 0.05); therefore, hypothesis 3c was not supported.

To summarize, the above moderation analysis suggests that only within the structural dimension of social capital, higher resource availability increases perceived knowledge transfer in all three sectors. Whereas in private and public sectors (but not in NGOs), the higher the resource availability, the stronger the effect of structural and relational dimensions on perceived knowledge transfer.

Overall findings are summarized in Figure 5.

This study investigated the relationship between social capital and perceived inter-organizational knowledge transfer in LTC and some boundary conditions.

Results revealed a positive relationship between knowledge transfer and structural and relational dimensions of social capital, which corroborates prior research in other domains (e.g. Santos et al., 2023; Rodríguez-Aceves et al., 2023). However, contrary to expectations and prior research findings in other domains (e.g. Ganguly et al., 2019), the relationship with the cognitive dimension was insignificant. We speculate that the effect was insignificant because in LTC, a large network and ability to confide in its members are more relevant and indispensable for knowledge transfer than value congruence. Some individual level studies likewise failed to report significant relationship with cognitive capital (e.g. Akhavan and Mahdi Hosseini, 2016). This may also suggest that in LTC, other variables come into play that undermine this relationship, such as professional divergence in values and goals, etc. (Pearson and Watson, 2018; Auschra, 2018). It is therefore critical for future research to explore the potential effects of diverse professional groups working in LTC and their motivation to share knowledge with others, as in health and social care knowledge transfers are multilateral and involve multiple knowledge recipients (Radević et al., 2023). Another possibility for insignificant results in the case of cognitive dimension could be the interaction between social capital dimensions. For instance, Al-Tabbaa and Ankrah (2016) found that cognitive capital effects were indirect and mediated by the relational dimension, while Nadeem et al. (2021) found that trust moderated the relationship between shared goals and knowledge hiding. Thus, further research should explore these likely effects. In taking a three-dimensional perspective, this study contributes significantly to the larger knowledge management literature, as cognitive capital has been given little attention in studies of organizational social capital.

We also contribute to the knowledge management literature by exploring boundary conditions in the relationship between social capital and knowledge transfer, which, at least to our knowledge, have not received much attention. Our findings showed that NGOs benefit less from their social capital in knowledge transfer. More specifically, our results showed that higher trust and reciprocity lead to higher knowledge and information transfer in private and public sectors, but not in NGOs. We speculate that this is due to their lower levels of trust and reciprocity reported in comparison to public and private organizations in our study, which is in line with previous research on NGO perceptions of inferiority in comparison to other actors (Jang et al., 2016). In addition, NGOs may fear of losing autonomy and flexibility (Abendstern et al., 2018). In Lithuania NGOs are largely operated through younger volunteers who are often stigmatized as untrustworthy and the general public and politicians do not consider them as a serious actor (Poškutė et al., 2022). This may inhibit employee openness to knowledge transfer, while employee attitudes make a relevant enabler of this process in NGOs (Zbuchea et al., 2020).

We also found resource availability as another relevant boundary condition. Interestingly, in our study resource availability moderated the relationship between structural and relational dimensions and knowledge transfer in different ways. Importantly, it yielded some distinct findings for NGOs, where the effects of resource availability were less pronounced. This in turn suggests that in NGOs, knowledge and information transfer is motivated by other factors than in other sectors, and thus existing knowledge management research needs to be applied to NGOs with caution (Rathi and Given, 2017; Bloice and Burnett, 2016). For instance, employee altruism (Curado et al., 2023) and willingness to create social value for their wider communities and society (Bloice and Burnett, 2016) were found to be significant predictors of knowledge sharing in NGOs. Thus further comparative research is needed to identify distinct features of NGOs that might account for their engagement in knowledge transfer and the mechanisms driving it. NGOs may be substituting them with other types of resources, or there may be other contextual conditions (e.g. ties with external local communities; Schneider, 2009) facilitating knowledge exchange that could be explored in future studies.

Implications for policy making. Given LTC fragmentation, inadequacies in formal LTC supply and quality, and slow integrated care developments in many EU countries, cross-sectoral cooperation between major LTC actors plays a critical role. Knowledge transfer is a major facilitator of sustained cooperation. Our findings suggest that social capital facilitates knowledge transfer across the boundaries of different organizations, professions and sectors. To do so, organizations need to be provided with resources, network-building opportunities and measures facilitating frequent and continuous interactions to build trust and reciprocity.

Another important implication of our study concerns the required improvements regarding NGO integration in the LTC system, as their current engagement is insufficient. Our findings showed that in Lithuania NGOs have smaller networks and report lower levels of trust towards public and private organizations, which is also reflected in the disregard of their relevance by the politicians and general public (Poškutė et al., 2022). The insufficient cooperation between NGOs and government institutions and insufficient human and financial resources are acknowledged as a major constraint to their development in Lithuania [6]. Thus, immediate measures (including amendments in national legislation) need to be taken to resolve these issues, as NGOs can contribute significantly to higher LTC system efficiency and quality.

Implications for practice. To reap the benefits of inter-organizational cooperation, organizations first need to clearly communicate to their employees the aims and relevance of knowledge and information transfer both within and outside organizational boundaries. They should also provide their employees with networking possibilities and facilitate their more frequent interactions with their peers in other organizations; thus, contributing to the enhancement of both structural and relational dimensions of their social capital. In order to make it more efficient, employees also need to be provided with facilitating conditions, such as time and financial resources. In regard to NGOs, they should take a more proactive role in establishing and sustaining collaboration with other sectors and seek to improve their public image.

Limitations and future research. Our findings must be considered within the limitations of the study. Our study builds on self-reported measures. Future studies should use objective measures of knowledge and information transfer. We report findings from a single European country. As countries vary in LTC systems and involvement of private and non-governmental organizations, our results may not be generalizable across all European countries and call for research in other countries. Yet our findings provide relevant insights for countries with fragmented LTC systems, new EU Member states in particular that also share rather recent involvement of private organizations in LTC. In addition, we did not include informal caregivers in our study, as in Lithuania there is not a single organization representing them. In most of Europe, including Lithuania, a large part of LTC is carried out by informal carers (European Commission, 2021a); thus they make a relevant, but under-studied stakeholder (Hengelaar et al., 2018). Respectively, future studies should be conducted in countries were informal caregiver associations exist.

Conclusions. The purpose of this study was to disclose the relationship between social capital and inter-organizational knowledge and information transfer, as a critical facilitator of cooperation between LTC actors from different sectors. Our findings revealed a positive relationship between two social capital dimensions (network size number and strength, and trust and reciprocity) and knowledge and information transfer between LTC actors in Lithuania. In addition, we found that the relationship was partly moderated by the sector and resource availability.

Funding: This research was funded by the Research Council of Lithuania (No: S-MIP-17-124).

1.

In LTC NGOs usually connote nonprofit organizations operating in the international context, largely relying on charitable contributions and the work of unpaid volunteers, while private non-profits typically refer to not-for-profit organizations founded by a private person relying on paid staff.

In Lithuania private non-profits rely on service fees, part of which is covered by the municipality and the rest by the care recipient, as out-of-pocket spending, and their legal status is distinct from NGOs. The latter refer to organizations who have officially declared their activities as public interest seeking and who have been registered as non-governmental organizations in the National Register of Legal Entities.

2.

Since 2009 Lithuanian population declined by 12% (Statistics Lithuania, 2022)

3.

Aged 65+ comprise 21.6% (Statistics Lithuania, 2023)

4.

40.3% of older people are at risk of poverty or social exclusion (Eurostat, 2022)

5.

Order No. A1-93 of the Minister of Social Security and Labor of the Republic of Lithuania on the approval of Catalog of Social Services.

6.

Lithuanian Ministry of Social Affairs and Labor (Link to the website)

Abendstern
,
M.
,
Hughes
,
J.
,
Jasper
,
R.
,
Sutcliffe
,
C.
and
Challis
,
D.
(
2018
), “
Care coordination for older people in the third sector: scoping the evidence
”,
Health and Social Care in the Community
, Vol. 
26
No. 
3
, pp. 
314
-
329
, doi: .
Adler
,
P.S.
and
Kwon
,
S.-W.
(
2002
), “
Social capital: prospects for a new concept
”,
Academy of Management Review
, Vol. 
27
No. 
1
, pp. 
17
-
40
, doi: .
Akhavan
,
P.
and
Mahdi Hosseini
,
S.
(
2016
), “
Social capital, knowledge sharing, and innovation capability: an empirical study of R&D teams in Iran
”,
Technology Analysis and Strategic Management
, Vol. 
28
No. 
1
, pp. 
96
-
113
.
Al-Tabbaa
,
O.
and
Ankrah
,
S.
(
2016
), “
Social capital to facilitate ‘engineered’ university–industry collaboration for technology transfer: a dynamic perspective
”,
Technological Forecasting and Social Change
, Vol. 
104
, pp. 
1
-
15
, doi: .
Alderwick
,
H.
,
Hutchings
,
A.
,
Briggs
,
A.
and
Mays
,
N.
(
2021
), “
The impacts of collaboration between local health care and non-health care organizations and factors shaping how they work: a systematic review of reviews
”,
BMC Public Health
, Vol. 
21
, pp. 
1
-
16
, doi: .
Auschra
,
C.
(
2018
), “
Barriers to the integration of care in inter-organisational settings: a literature review
”,
International Journal of Integrated Care
, Vol. 
18
No. 
1
, p.
5
, doi: .
Bloice
,
L.
and
Burnett
,
S.
(
2016
), “
Barriers to knowledge sharing in third sector social care: a case study
”,
Journal of Knowledge Management
, Vol. 
20
No. 
1
, pp. 
125
-
145
, doi: .
Bourdieu
,
P.
(
1985
), “The forms of capital”, in
Richardson
,
J.G.
(Ed.),
Handbook of Theory and Research for the Sociology of Education
,
Greenwood
,
New York
, pp. 
241
-
258
.
Carlini
,
J.
,
Lehman
,
K.
,
Dharmesti
,
M.
and
Knox
,
K.
(
2023
), “
Maximizing value in healthcare partnerships: a case examining an inter-organizational relationship in the public and non-profit sectors
”,
Journal of Philanthropy and Marketing
, Vol. 
28
No. 
3
, e1796, doi: .
Cohen
,
J.
(
1992
), “
A power primer
”,
Psychological Bulletin
, Vol. 
112
No. 
1
, pp. 
155
-
159
, doi: .
Coleman
,
J.S.
(
1988
), “
Social capital in the creation of human capital
”,
American Journal of Sociology
, Vol. 
94
, pp. 
95
-
120
, doi: .
Curado
,
C.
,
Henriques
,
P.
,
Oliveira
,
M.
and
Martins
,
R.
(
2023
), “
Organisational culture as an antecedent of knowledge sharing in NGOs
”,
Knowledge Management Research and Practice
, Vol. 
21
No. 
3
, pp. 
449
-
461
, doi: .
Derose
,
K.P.
and
Varda
,
D.M.
(
2009
), “
Social capital and health care access: a systematic review
”,
Medical Care Research and Review: MCRR
, Vol. 
66
No. 
3
, pp. 
272
-
306
, doi: .
Dickinson
,
H.
,
Allen
,
K.
,
Alcock
,
P.
,
Macmillan
,
R.
and
Glasby
,
J.
(
2012
),
The Role of the Third Sector in Delivering Social Care
,
NIHR School for Social Care Research
,
London
.
Doornebosch
,
A.J.
,
Smaling
,
H.J.A.
and
Achterberg
,
W.P.
(
2022
), “
Interprofessional collaboration in long-term care and rehabilitation: a systematic review
”,
Journal of the American Medical Directors Association
, Vol. 
23
No. 
5
, pp. 
764
-
777.e2
, doi: .
Enjolras
,
B.
and
Sivesind
,
K.H.
(
2018
), “The roles and impacts of the third sector in Europe”, in
Enjolras
,
B.
,
Salamon
,
L.M.
,
Sivesind
,
K.H.
and
Zimmer
,
A.
(Eds),
The Third Sector as a Renewable Resource for Europe: Concepts, Impacts, Challenges and Opportunities
,
Springer International Publishing
,
Cham
, pp. 
95
-
124
.
European Commission
(
2021a
),
Long-term Care Report – Trends, Challenges and Opportunities in an Ageing Society
, Vol.
I
,
Publications Office
,
Luxembourg
.
European Commission
(
2021b
),
Long-Term Care Report. Trends, Challenges and Opportunities in an Ageing Society
,
Publications Office of the European Union
,
Luxembourg
.
Eurostat
(
2022
), “
Living conditions in Europe - poverty and social exclusion
”,
available at:
 Link to the website
Favero
,
N.
and
Bullock
,
J.B.
(
2015
), “
How (not) to solve the problem: an evaluation of scholarly responses to common source bias
”,
Journal of Public Administration Research and Theory
, Vol. 
25
No. 
1
, pp. 
285
-
308
, doi: .
Ferrer-Serrano
,
M.
,
Fuentelsaz
,
L.
and
Latorre-Martinez
,
M.P.
(
2022
), “
Examining knowledge transfer and networks: an overview of the last twenty years
”,
Journal of Knowledge Management
, Vol. 
26
No. 
8
, pp. 
2007
-
2037
, doi: .
Ganguly
,
A.
,
Talukdar
,
A.
and
Chatterjee
,
D.
(
2019
), “
Evaluating the role of social capital, tacit knowledge sharing, knowledge quality and reciprocity in determining innovation capability of an organization
”,
Journal of Knowledge Management
, Vol. 
23
No. 
6
, pp. 
1105
-
1135
, doi: .
Gazley
,
B.
(
2010
), “
Why not partner with local government? Nonprofit managerial perceptions of collaborative disadvantage
”,
Nonprofit and Voluntary Sector Quarterly
, Vol. 
39
No. 
1
, pp.
51
-
76
.
Gonçalves
,
T.
,
Curado
,
C.
and
Balle
,
A.R.
(
2022
), “
Psychosocial antecedents of knowledge sharing in healthcare research centers: a mixed-methods approach
”,
Journal of Health, Organisation and Management
, Vol. 
36
No. 
1
, pp. 
1
-
23
, doi: .
Gonçalves
,
T.
,
Muñoz-Pascual
,
L.
and
Curado
,
C.
(
2024
), “
Is knowledge liberating? The role of knowledge behaviors and competition on the workplace happiness of healthcare professionals
”,
Journal of Health, Organisation and Management
, Vol. 
38
No. 
4
, pp. 
469
-
493
, doi: .
Hayes
,
A.F.
(
2018
),
Introduction to Mediation, Moderation, and Conditional Process Analysis: A Regression-Based Approach
,
Guilford Publications
,
New York
.
He
,
W.
and
Wei
,
K.-K.
(
2009
), “
What drives continued knowledge sharing? An investigation of knowledge-contribution and-seeking beliefs
”,
Decision Support Systems
, Vol. 
46
No. 
4
, pp.
826
-
838
.
Hemmert
,
M.
(
2019
), “
The relevance of inter-personal ties and inter-organizational tie strength for outcomes of research collaborations in South Korea
”,
Asia Pacific Journal of Management
, Vol. 
36
No. 
2
, pp. 
373
-
393
, doi: .
Hengelaar
,
A.H.
,
van Hartingsveldt
,
M.
,
Wittenberg
,
Y.
,
van Etten-Jamaludin
,
F.
,
Kwekkeboom
,
R.
and
Satink
,
T.
(
2018
), “
Exploring the collaboration between formal and informal care from the professional perspective—a thematic synthesis
”,
Health and Social Care in the Community
, Vol. 
26
No. 
4
, pp. 
474
-
485
, doi: .
Hujala
,
T.
and
Laihonen
,
H.
(
2021
), “
Effects of knowledge management on the management of health and social care: a systematic literature review
”,
Journal of Knowledge Management
, Vol. 
25
No. 
11
, pp. 
203
-
221
, doi: .
Hujala
,
T.
and
Laihonen
,
H.
(
2023
), “
Knowledge management in a regional integrated health and social care system
”,
Journal of Integrated Care
, Vol. 
31
No. 
5
, pp. 
15
-
28
, doi: .
Jang
,
H.S.
,
Feiock
,
R.C.
and
Saitgalina
,
M.
(
2016
), “
Institutional collective action issues in nonprofit self-organized collaboration
”,
Administration and Society
, Vol. 
48
No. 
2
, pp. 
163
-
189
, doi: .
Jeon
,
S.
,
Kim
,
Y.G.
and
Koh
,
J.
(
2011
), “
An integrative model for knowledge sharing in communities‐of‐practice
”,
Journal of Knowledge Management
, Vol. 
15
No. 
2
, pp. 
251
-
269
, doi: .
Kim
,
M.
and
Peng
,
S.
(
2018
), “
The dilemma for small human service nonprofits: engaging in collaborations with limited human resource capacity
”,
Nonprofit Management and Leadership
, Vol. 
29
No. 
1
, pp. 
83
-
103
, doi: .
Koay
,
K.Y.
,
Sandhu
,
M.S.
,
Tjiptono
,
F.
and
Watabe
,
M.
(
2022
), “
Understanding employees' knowledge hiding behaviour: the moderating role of market culture
”,
Behaviour and Information Technology
, Vol. 
41
No. 
4
, pp. 
694
-
711
, doi: .
Kosklin
,
R.
,
Lammintakanen
,
J.
and
Kivinen
,
T.
(
2023
), “
Knowledge management effects and performance in health care: a systematic literature review
”,
Knowledge Management Research and Practiceand
, Vol. 
21
No. 
4
, pp. 
738
-
748
, doi: .
Laihonen
,
H.
,
Kork
,
A.-A.
and
Sinervo
,
L.-M.
(
2024
), “
Advancing public sector knowledge management: towards an understanding of knowledge formation in public administration
”,
Knowledge Management Research and Practiceand
, Vol. 
22
No. 
3
, pp. 
223
-
233
, doi: .
Lee
,
H.
,
Ki-Hyun
,
U.
,
Hughes
,
P.
,
Hughes
,
M.
and
Shine
,
E.-K.
(
2023
), “
Understanding knowledge transfer in M&As: an integration of resource orchestration and social capital theories and evidence from UK acquiring firms
”,
European Management Journal
, Vol. 
41
No. 
2
, pp. 
199
-
211
.
Levin
,
D.Z.
and
Walter
,
J.
(
2019
), “
Before they were ties: predicting the value of brand-new connections
”,
Journal of Management
, Vol. 
45
No. 
7
, pp. 
2861
-
2890
, doi: .
Lim
,
S.Y.
,
Jarvenpaa
,
S.L.
and
Lanham
,
H.J.
(
2015
), “
Barriers to interorganizational knowledge transfer in post-hospital care transitions: review and directions for information systems research
”,
Journal of Management Information Systems
, Vol. 
32
No. 
3
, pp.
48
-
74
, doi: .
Lørum
,
R.M.
and
Smith
,
F.
(
2024
), “
Strategies and practices for organizational learning in integrated care
”,
Journal of Health, Organization and Management
, Vol. 
38
No. 
6
, pp. 
942
-
960
, doi: .
Lyng
,
H.B.
,
Ree
,
E.
,
Strømme
,
T.
,
Johannessen
,
T.
,
Aase
,
I.
,
Ullebust
,
B.
,
Thomsen
,
L.H.
,
Holen-Rabbersvik
,
E.
,
Schibevaag
,
L.
,
Bates
,
D.W.
and
Wiig
,
S.
(
2024
), “
Barriers and enablers for externally and internally driven implementation processes in healthcare: a qualitative cross-case study
”,
BMC Health Services Research
, Vol. 
24
No. 
1
, p.
528
, doi: .
Maurer
,
I.
,
Bartsch
,
V.
and
Ebers
,
M.
(
2011
), “
The value of intra-organizational social capital: how it fosters knowledge transfer, innovation performance, and growth
”,
Organization Studies
, Vol. 
32
No. 
2
, pp. 
157
-
185
, doi: .
McFadyen
,
M.A.
and
Cannella Jr
,
A.A.
(
2004
), “
Social capital and knowledge creation: diminishing returns of the number and strength of exchange relationships
”,
Academy of Management Journal
, Vol. 
47
No. 
5
, pp. 
735
-
746
, doi: .
Miković
,
R.
,
Petrović
,
D.
,
Mihić
,
M.
,
Obradović
,
V.
and
Todorović
,
M.
(
2020
), “
The integration of social capital and knowledge management–The key challenge for international development and cooperation projects of nonprofit organizations
”,
International Journal of Project Management
, Vol. 
38
No. 
8
, pp. 
515
-
533
, doi: .
Moshtari
,
M.
and
Vanpoucke
,
E.
(
2021
), “
Building successful NGO–business relationships: a social capital perspective
”,
Journal of Supply Chain Management
, Vol. 
57
No. 
3
, pp. 
104
-
129
, doi: .
Nadeem
,
M.A.
,
Liu
,
Z.
,
Ghani
,
U.
,
Younis
,
A.
and
Xu
,
Y.
(
2021
), “
Impact of shared goals on knowledge hiding behavior: the moderating role of trust
”,
Management Decision
, Vol. 
59
No. 
6
, pp. 
1312
-
1332
, doi: .
Nahapiet
,
J.
and
Ghoshal
,
S.
(
1998
), “
Social capital, intellectual capital, and the organizational advantage
”,
Academy of Management Review
, Vol. 
23
No. 
2
, pp. 
242
-
266
, doi: .
Oh
,
Y.
and
Bush
,
C.B.
(
2016
), “
Exploring the role of dynamic social capital in collaborative governance
”,
Administration and Society
, Vol. 
48
No. 
2
, pp. 
216
-
236
, doi: .
Pearson
,
C.
and
Watson
,
N.
(
2018
), “
Implementing health and social care integration in Scotland: renegotiating new partnerships in changing cultures of care
”,
Health and Social Care in the Community
, Vol. 
26
No. 
3
, pp. 
e396
-
e403
, doi: .
Pedersen
,
L.M.
,
Jakobsen
,
A.L.
,
Buttenschøn
,
H.N.
and
Haagerup
,
A.
(
2023
), “
Positive association between social capital and the quality of health care service: a cross-sectional study
”,
International Journal of Nursing Studies
, Vol. 
137
, 104380, doi: .
Podsakoff
,
P.M.
,
MacKenzie
,
S.B.
,
Lee
,
J.-Y.
and
Podsakoff
,
N.P.
(
2003
), “
Common method biases in behavioral research: a critical review of the literature and recommended remedies
”,
Journal of Applied Psychology
, Vol. 
88
No. 
5
, pp. 
879
-
903
, doi: .
Poškutė
,
V.
and
Greve
,
B.
(
2017
), “
Long‐term care in Denmark and Lithuania–A most dissimilar case
”,
Social Policy and Administration
, Vol. 
51
No. 
4
, pp. 
659
-
675
, doi: .
Poškutė
,
V.
,
Kazlauskaitė
,
R.
and
Matonytė
,
I.
(
2022
), “
Stakeholder collaboration in long-term care of older people in Lithuania
”,
Health and Social Care in the Community
, Vol. 
30
No. 
1
, pp. 
193
-
202
, doi: .
Putnam
,
R.D.
(
1993
), “
What makes democracy work?
”,
National Civic Review
, Vol. 
82
No. 
2
, pp. 
101
-
107
, doi: .
Radević
,
I.
,
Dimovski
,
V.
,
Lojpur
,
A.
and
Colnar
,
S.
(
2023
), “
Quality of healthcare services in focus: the role of knowledge transfer, hierarchical organizational structure and trust
”,
Knowledge Management Research and Practice
, Vol. 
21
No. 
3
, pp. 
525
-
536
, doi: .
Rathi
,
D.
and
Given
,
L.M.
(
2017
), “
Non-profit organizations' use of tools and technologies for knowledge management: a comparative study
”,
Journal of Knowledge Management
, Vol. 
21
No. 
4
, pp. 
718
-
740
, doi: .
Reynaers
,
A.M.
and
van der Wal
,
Z.
(
2018
), “
Do partners in PPPs view public and private management differently? Re‐examining Boyne’s hypotheses in the context of collaboration
”,
Australian Journal of Public Administration
, Vol. 
77
No. 
2
, pp. 
294
-
308
, doi: .
Riedel
,
M.
,
Kraus
,
M.
and
Mayer
,
S.
(
2016
), “
Organization and supply of long-term care services for the elderly: a bird's-eye view of old and new EU member states
”,
Social Policy and Administration
, Vol. 
50
No. 
7
, pp. 
824
-
845
, doi: .
Rodríguez-Aceves
,
L.
,
Mojarro-Durán
,
B.I.
and
Rivera
,
A.E.
(
2023
), “
Enabling knowledge sharing through relational capital in a family business context
”,
Journal of the Knowledge Economy
, Vol. 
14
No. 
3
, pp. 
2156
-
2186
, doi: .
Rydenfält
,
C.
,
Persson
,
J.
,
Larsson
,
R.
,
Johansson
,
G.
and
Erlingsdóttir
,
G.
(
2024
), “
Inter-organizational home care nursing teams: a comparison of a region wide organizational change initiative with success factors identified by forerunners and team theory
”,
Home Health Care Management and Practice
, Vol. 
36
No. 
3
, pp. 
151
-
156
, doi: .
Santos
,
R.F.
,
Oliveira
,
M.
and
Curado
,
C.
(
2023
), “
The effects of the relational dimension of social capital on tacit and explicit knowledge sharing: a mixed-methods approach
”,
VINE Journal of Information and Knowledge Management Systems
, Vol. 
53
No. 
1
, pp. 
43
-
63
, doi: .
Schneider
,
J.A.
(
2009
), “
Organizational social capital and nonprofits
”,
Nonprofit and Voluntary Sector Quarterly
, Vol. 
38
No. 
4
, pp. 
643
-
662
, doi: .
Schulmann
,
K.
,
Leichsenring
,
K.
and
Genta
,
M.
(
2014
), “
Social support and long-term care in Eu care regimes. framework conditions and initiatives of social innovation in an active ageing perspective
”,
Overview Report. WP8 MoPAct Project
.
Selsky
,
J.W.
and
Parker
,
B.
(
2005
), “
Cross-sector partnerships to address social issues: challenges to theory and practice
”,
Journal of Management
, Vol. 
31
No. 
6
, pp. 
849
-
873
, doi: .
Simons
,
M.
,
Goossensen
,
A.
and
Nies
,
H.
(
2022
), “
Interventions fostering interdisciplinary and inter-organizational collaboration in health and social care; an integrative literature review
”,
Journal of Interprofessional Education and Practice
, Vol. 
28
, 100515, doi: .
Song
,
A.M.
,
Saavedra Cisneros
,
A.
,
Temby
,
O.
,
Sandall
,
J.
,
Cooksey
,
R.W.
and
Hickey
,
G.M.
(
2019
), “
On developing an inter-agency trust scale for assessing governance networks in the public sector
”,
International Public Management Journal
, Vol. 
22
No. 
4
, pp. 
691
-
710
, doi: .
Spasova
,
S.
,
Baeten
,
R.
,
Coster
,
S.
,
Ghailani
,
D.
and
Peña-Casas
,
R.V.B.
(
2018
),
Challenges in Long-Term Care in Europe, A Study of National Policies 2018
,
European Social Policy Network (ESPN)
,
Brussels, European Commission
.
Statistics Lithuania
(
2022
), “
The population of Lithuania
”,
available at:
 Link to the website
Statistics Lithuania
(
2023
), “
The Population of Lithuania
”,
available at:
 Link to the website
Sunnemark
,
F.
,
Lundqvist Westin
,
W.
,
Al Saad
,
T.
and
Assmo
,
P.
(
2024
), “
Exploring barriers and facilitators to knowledge transfer and learning processes through a cross-departmental collaborative project in a municipal organization
”,
The Learning Organization
, Vol. 
31
No. 
3
, pp. 
358
-
374
, doi: .
Susha
,
I.
,
Rukanova
,
B.
,
Zuiderwijk
,
A.
,
Gil-Garcia
,
J.R.
and
Gasco Hernandez
,
M.
(
2023
), “
Achieving voluntary data sharing in cross sector partnerships: three partnership models
”,
Information and Organization
, Vol. 
33
No. 
1
, 100448, doi: .
Tavakol
,
M.
and
Dennick
,
R.
(
2011
), “
Making sense of Cronbach’s alpha
”,
International Journal of Medical Education
, Vol. 
2
, pp. 
53
-
55
, doi: .
Taylor
,
S.
and
Todd
,
P.A.
(
1995
), “
Understanding information technology usage: a test of competing models
”,
Information Systems Research
, Vol. 
6
No. 
2
, pp. 
144
-
176
, doi: .
Torchia
,
M.
,
Calabrò
,
A.
and
Morner
,
M.
(
2015
), “
Public–private partnerships in the health care sector: a systematic review of the literature
”,
Public Management Review
, Vol. 
17
No. 
2
, pp. 
236
-
261
, doi: .
Triandis
,
H.C.
(
1977
),
Interpersonal Behavior
,
Brooks/Cole
,
Monterey
.
van der Schors
,
W.
,
Roos
,
A.-F.
,
Kemp
,
R.
and
Varkevisser
,
M.
(
2021
), “
Inter-organizational collaboration between healthcare providers
”,
Health Services Management Research
, Vol. 
34
No. 
1
, pp. 
36
-
46
, doi: .
Van Wijk
,
R.
,
Jansen
,
J.J.
and
Lyles
,
M.A.
(
2008
), “
Inter‐and intra‐organizational knowledge transfer: a meta‐analytic review and assessment of its antecedents and consequences
”,
Journal of Management Studies
, Vol. 
45
No. 
4
, pp. 
830
-
853
, doi: .
Widén-Wulff
,
G.
and
Ginman
,
M.
(
2004
), “
Explaining knowledge sharing in organizations through the dimensions of social capital
”,
Journal of Information Science
, Vol. 
30
No. 
5
, pp. 
448
-
458
, doi: .
Woschke
,
T.
,
Haase
,
H.
and
Kratzer
,
J.
(
2017
), “
Resource scarcity in SMEs: effects on incremental and radical innovations
”,
Management Research Review
, Vol. 
40
No. 
2
, pp. 
195
-
217
, doi: .
Yadav
,
S.K.
,
Singh
,
S.
and
Prusty
,
S.K.
(
2025
), “
An integrative perspective on inter-organisational collaboration in healthcare: a modified total interpretive structural modelling approach
”,
Journal of Health, Organization and Management
, Vol.
ahead-of-print
No.
ahead-of-print
, doi: .
Yang
,
T.-M.
and
Maxwell
,
T.A.
(
2011
), “
Information-sharing in public organizations: a literature review of interpersonal, intra-organizational and inter-organizational success factors
”,
Government Information Quarterly
, Vol. 
28
No. 
2
, pp. 
164
-
175
, doi: .
Yoshida
,
Y.
,
Hirakawa
,
Y.
,
Hong
,
Y.J.
,
Mamun
,
M.R.
,
Shimizu
,
H.
,
Nakano
,
Y.
and
Yatsuya
,
H.
(
2024
), “
Factors influencing interprofessional collaboration in long-term care from a multidisciplinary perspective: a case study approach
”,
Home Health Care Services Quarterly
, Vol. 
43
No. 
4
, pp. 
239
-
258
, doi: .
Zbuchea
,
A.
,
Ivan
,
L.
,
Petropoulos
,
S.
and
Pinzaru
,
F.
(
2020
), “
Knowledge sharing in NGOs: the importance of the human dimension
”,
Kybernetes
, Vol. 
49
No. 
1
, pp. 
182
-
199
, doi: .
Zhao
,
L.
and
Detlor
,
B.
(
2023
), “
Towards a contingency model of knowledge sharing: interaction between social capital and social exchange theories
”,
Knowledge Management Research and Practice
, Vol. 
21
No. 
1
, pp. 
197
-
209
, doi: .
Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at http://creativecommons.org/licences/by/4.0/legalcode

Data & Figures

Figure 1
A line graph showing relationships between social capital and knowledge transfer across three sector categories.The horizontal axis is labeled “Social capital: Relational dimension”, and ranges from negative 1.00 to 1.50 in increments of 0.5 units. The vertical axis is labeled “Knowledge and information transfer”, and ranges from negative 0.50 to 0.50 in increments of 0.25 units. The graph shows three lines representing different sector categories, as indicated in the legend on the right side. The first line, labeled “N G O” and drawn as a solid line, begins at (negative 0.97, 0.16), passes through the point (0.21, 0.20), and ends at (1.11, 0.24). The label “0.04 (0.16)” appears above the line. The second line, labeled “Private” and shown as a dash-dotted line, begins at (negative 1.00, negative 0.51) and rises linearly to end at (1.11, 0.43). The label “0.45 triple asterisk (0.11)” is present above the line. The third line, labeled “Public” and drawn as a dashed line, begins at (negative 1, negative 0.48) and rises to end at (0.21, 0.03). The line has the label “0.46 triple asterisk (0.07)”. At the bottom of the graph, a note reads as follows: “Note(s): Unstandardized coefficients (b) provided; standard errors in parenthesis; triple asterisk p less than 0.001”. Followed by “Source(s): Authors’ work”. Note: All numerical data values are approximated.

Moderating effect of sector on the relationship between relational dimension of social capital and knowledge and information transfer

Figure 1
A line graph showing relationships between social capital and knowledge transfer across three sector categories.The horizontal axis is labeled “Social capital: Relational dimension”, and ranges from negative 1.00 to 1.50 in increments of 0.5 units. The vertical axis is labeled “Knowledge and information transfer”, and ranges from negative 0.50 to 0.50 in increments of 0.25 units. The graph shows three lines representing different sector categories, as indicated in the legend on the right side. The first line, labeled “N G O” and drawn as a solid line, begins at (negative 0.97, 0.16), passes through the point (0.21, 0.20), and ends at (1.11, 0.24). The label “0.04 (0.16)” appears above the line. The second line, labeled “Private” and shown as a dash-dotted line, begins at (negative 1.00, negative 0.51) and rises linearly to end at (1.11, 0.43). The label “0.45 triple asterisk (0.11)” is present above the line. The third line, labeled “Public” and drawn as a dashed line, begins at (negative 1, negative 0.48) and rises to end at (0.21, 0.03). The line has the label “0.46 triple asterisk (0.07)”. At the bottom of the graph, a note reads as follows: “Note(s): Unstandardized coefficients (b) provided; standard errors in parenthesis; triple asterisk p less than 0.001”. Followed by “Source(s): Authors’ work”. Note: All numerical data values are approximated.

Moderating effect of sector on the relationship between relational dimension of social capital and knowledge and information transfer

Close Figure 1
Figure 2
A line graph showing relationships between social capital and knowledge transfer across three sector categories.The horizontal axis is labeled “Social capital: Cognitive dimension”, and ranges from negative 0.20 to 0.40 in increments of 0.20 units. The vertical axis is labeled “Knowledge and information transfer”, and ranges from negative 0.20 to 0.40 in increments of 0.10 units. The graph shows three lines representing different sector categories, as indicated in the legend on the right side. The first line, labeled “N G O” and drawn as a solid line, begins at (negative 0.23, 0.31) and slopes downward to end at (0.39, 0.21). The line has the label “negative 0.15 (0.11)”. The second line, labeled “Private” and shown as a dash-dotted line, begins at (negative 0.23, 0.09) and rises upward to end at (0.39, 0.02). The line has the label “0.18 (0.10)”. The third line, labeled “Public” and drawn as a dashed line, begins at (negative 0.23, negative 0.11) and slopes upward to end at (0.39, negative 0.03). The line has the label “0.14 (0.08)”. At the bottom of the graph, a note reads as follows: “Note(s): Unstandardized coefficients (b) provided; standard errors in parenthesis; triple asterisk p less than 0.001”. Followed by “Source(s): Authors’ work”. Note: All numerical data values are approximated.

Moderating effect of sector on the relationship between cognitive dimension of social capital and knowledge and information transfer

Figure 2
A line graph showing relationships between social capital and knowledge transfer across three sector categories.The horizontal axis is labeled “Social capital: Cognitive dimension”, and ranges from negative 0.20 to 0.40 in increments of 0.20 units. The vertical axis is labeled “Knowledge and information transfer”, and ranges from negative 0.20 to 0.40 in increments of 0.10 units. The graph shows three lines representing different sector categories, as indicated in the legend on the right side. The first line, labeled “N G O” and drawn as a solid line, begins at (negative 0.23, 0.31) and slopes downward to end at (0.39, 0.21). The line has the label “negative 0.15 (0.11)”. The second line, labeled “Private” and shown as a dash-dotted line, begins at (negative 0.23, 0.09) and rises upward to end at (0.39, 0.02). The line has the label “0.18 (0.10)”. The third line, labeled “Public” and drawn as a dashed line, begins at (negative 0.23, negative 0.11) and slopes upward to end at (0.39, negative 0.03). The line has the label “0.14 (0.08)”. At the bottom of the graph, a note reads as follows: “Note(s): Unstandardized coefficients (b) provided; standard errors in parenthesis; triple asterisk p less than 0.001”. Followed by “Source(s): Authors’ work”. Note: All numerical data values are approximated.

Moderating effect of sector on the relationship between cognitive dimension of social capital and knowledge and information transfer

Close Figure 2
Figure 3
A three-panel line graph showing the relationship between social capital and knowledge transfer across resource levels.The three graphs are arranged vertically, representing different levels of Resource availability on the right side, labeled from top to bottom as “Low”, “Medium”, and “High”. For all three graphs, the horizontal axis is labeled “Social capital: Structural dimension”, and ranges from negative 1.00 to 1.50 in increments of 0.5 units. The vertical axis is labeled “Knowledge and information transfer”, and ranges from negative 0.75 to 0.50 in increments of 0.25 units. Each graph contains three lines corresponding to the sector categories “N G O”, “Private”, and “Public”, as indicated in the legend on the right. In the graph at the top labeled “Low levels of Resource availability”, the first line, representing “N G O” and drawn as a solid line, begins at (negative 0.98, 0.28), passes through the point (negative 0.16, 0.32), and ends at (1.17, 0.39). The line has the label “0.04 (0.14)” placed above it. The second line, representing the “Private” sector and drawn as a dash-dotted line, begins at (negative 0.98, 0.08) and ends at (1.17, 0.05), with the label “negative 0.01 (0.14)” above the line. The third line, representing the “Public” sector and drawn as a dashed line, begins at (negative 0.98, negative 0.09) and ends at (1.17, 0.32). The public and private sector lines pass near the intersection point (negative 0.16, 0.08), and the line is labeled “0.19 (0.11)”. In the middle graph labeled “Medium levels of Resource availability”, the first line, representing “N G O”, begins at (negative 0.98, 0.00), passes through the midpoint (negative 0.16, 0.13), and ends at (1.17, 0.41). It is labeled “0.20 (0.13)”. The second line, representing the “Private” sector, begins at (negative 0.99, negative 0.23) and ends at (1.17, 0.08), labeled “0.14 (0.12)”. The third line, representing the “Public” sector, begins at (negative 0.98, negative 0.38) and ends at (1.17, 0.34), labeled “0.34 triple asterisk (0.08)”. The public and private sector lines intersect at the point (negative 0.16, negative 0.09). In the bottom panel labeled “High levels of Resource availability”, the first line, representing “N G O”, begins at (negative 0.99, negative 0.44), passes through the midpoint (negative 0.16, negative 0.10), and ends at (1.17, 0.46), labeled “0.41 double asterisk (0.15)”. The second line, representing the “Private” sector, begins at (negative 0.98, negative 0.65) and ends at (1.17, 0.10), labeled “0.35 double asterisk (0.13)”. The third line, representing the “Public” sector, begins at (negative 0.99, negative 0.80) and ends at (1.17, 0.39), labeled “0.55 triple asterisk (0.09)”. The public and private lines intersect at the point (negative 0.16, negative 0.35). At the bottom of the figure, a note reads as follows: “Note(s): Unstandardized coefficients (b) provided; standard errors in parenthesis; triple asterisk p less than 0.001; resource availability: low at sixteenth, medium at fiftieth, and high at eighty-fourth percentile of conditioning values.” Followed by “Source(s): Authors’ work.” Note: All numerical data values are approximated.

Conditional effects of social capital at the low, medium and low values of resources (structural dimension)

Figure 3
A three-panel line graph showing the relationship between social capital and knowledge transfer across resource levels.The three graphs are arranged vertically, representing different levels of Resource availability on the right side, labeled from top to bottom as “Low”, “Medium”, and “High”. For all three graphs, the horizontal axis is labeled “Social capital: Structural dimension”, and ranges from negative 1.00 to 1.50 in increments of 0.5 units. The vertical axis is labeled “Knowledge and information transfer”, and ranges from negative 0.75 to 0.50 in increments of 0.25 units. Each graph contains three lines corresponding to the sector categories “N G O”, “Private”, and “Public”, as indicated in the legend on the right. In the graph at the top labeled “Low levels of Resource availability”, the first line, representing “N G O” and drawn as a solid line, begins at (negative 0.98, 0.28), passes through the point (negative 0.16, 0.32), and ends at (1.17, 0.39). The line has the label “0.04 (0.14)” placed above it. The second line, representing the “Private” sector and drawn as a dash-dotted line, begins at (negative 0.98, 0.08) and ends at (1.17, 0.05), with the label “negative 0.01 (0.14)” above the line. The third line, representing the “Public” sector and drawn as a dashed line, begins at (negative 0.98, negative 0.09) and ends at (1.17, 0.32). The public and private sector lines pass near the intersection point (negative 0.16, 0.08), and the line is labeled “0.19 (0.11)”. In the middle graph labeled “Medium levels of Resource availability”, the first line, representing “N G O”, begins at (negative 0.98, 0.00), passes through the midpoint (negative 0.16, 0.13), and ends at (1.17, 0.41). It is labeled “0.20 (0.13)”. The second line, representing the “Private” sector, begins at (negative 0.99, negative 0.23) and ends at (1.17, 0.08), labeled “0.14 (0.12)”. The third line, representing the “Public” sector, begins at (negative 0.98, negative 0.38) and ends at (1.17, 0.34), labeled “0.34 triple asterisk (0.08)”. The public and private sector lines intersect at the point (negative 0.16, negative 0.09). In the bottom panel labeled “High levels of Resource availability”, the first line, representing “N G O”, begins at (negative 0.99, negative 0.44), passes through the midpoint (negative 0.16, negative 0.10), and ends at (1.17, 0.46), labeled “0.41 double asterisk (0.15)”. The second line, representing the “Private” sector, begins at (negative 0.98, negative 0.65) and ends at (1.17, 0.10), labeled “0.35 double asterisk (0.13)”. The third line, representing the “Public” sector, begins at (negative 0.99, negative 0.80) and ends at (1.17, 0.39), labeled “0.55 triple asterisk (0.09)”. The public and private lines intersect at the point (negative 0.16, negative 0.35). At the bottom of the figure, a note reads as follows: “Note(s): Unstandardized coefficients (b) provided; standard errors in parenthesis; triple asterisk p less than 0.001; resource availability: low at sixteenth, medium at fiftieth, and high at eighty-fourth percentile of conditioning values.” Followed by “Source(s): Authors’ work.” Note: All numerical data values are approximated.

Conditional effects of social capital at the low, medium and low values of resources (structural dimension)

Close Figure 3
Figure 4
Three line graph showing the relationship between social capital and knowledge transfer across resource levels.The three graphs are arranged vertically, representing different levels of Resource availability on the right side, labeled from top to bottom as “Low”, “Medium”, and “High”. For all three graphs, the horizontal axis is labeled “Social capital: Relational dimension”, and ranges from negative 1.00 to 1.50 in increments of 0.5 units. The vertical axis is labeled “Knowledge and information transfer”, and ranges from negative 0.80 to 0.40 in increments of 0.20 units. Each graph contains three lines corresponding to the sector categories “N G O”, “Private”, and “Public”, as indicated in the legend on the right. In the graph at the top labeled “Low levels of Resource availability”, the first line, representing “N G O” and drawn as a solid line, begins at (negative 0.98, 0.43), passes through the point (0.20, 0.30), and ends at (1.10, 0.19). The line has the label “negative 0.11 (0.17)” placed above it. The second line, representing the “Private” sector and drawn as a dash-dotted line, begins at (negative 0.98, negative 0.02), passes through the point (0.20, 0.24), and ends at (1.10, 0.44). The line is labeled “0.24 (0.13)”. The third line, representing the “Public” sector and drawn as a dashed line, begins at (negative 0.98, negative 0.10), passes through the point (0.20, 0.18), and ends at (1.10, 0.39). The line has the label “0.25 single asterisk (0.10)”. In the middle graph labeled “Medium levels of Resource availability”, the first line, representing “N G O”, begins at (negative 0.98, 0.17), passes through the point (0.20, 0.17), and ends at (1.10, 0.15). The line is labeled “negative 0.01 (0.16)”. The second line, representing the “Private” sector, begins at (negative 0.98, negative 0.28), passes through the point (0.20, 0.13), and ends at (1.10, 0.43). The line is labeled “0.34 double asterisk (0.11)”. The third line, representing the “Public” sector, begins at (negative 0.98, negative 0.35), passes through the point (0.20, 0.07), and ends at (1.10, 0.39). The line is labeled “0.35 triple asterisk (0.07)”. In the bottom panel labeled “High levels of Resource availability”, the first line, representing “N G O”, begins at (negative 0.98, negative 0.17), passes through the point (0.20, negative 0.02), and ends at (1.10, 0.09). The line is labeled “0.12 (0.17)”. The second line, representing the “Private” sector, begins at (negative 0.98, negative 0.63), passes through the point (0.20, negative 0.08), and ends at (1.10, 0.35). The line is labeled “0.48 triple asterisk (0.13)”. The third line, representing the “Public” sector, begins at (negative 0.98, negative 0.71), passes through the point (0.20, negative 0.13), and ends at (1.10, 0.30). The line is labeled “0.49 triple asterisk (0.07)”. At the bottom of the figure, a note reads as follows: “Note(s): Unstandardized coefficients (b) provided; standard errors in parenthesis; asterisk p less than 0.05; double asterisk p less than 0.01; triple asterisk p less than 0.001; resource availability: low at sixteenth, medium at fiftieth, and high at eighty-fourth percentile of conditioning values”. Followed by “Source(s): Authors’ work”. Note: All numerical data values are approximated.

Conditional effects of social capital at the low, medium and low values of resources (relational dimension)

Figure 4
Three line graph showing the relationship between social capital and knowledge transfer across resource levels.The three graphs are arranged vertically, representing different levels of Resource availability on the right side, labeled from top to bottom as “Low”, “Medium”, and “High”. For all three graphs, the horizontal axis is labeled “Social capital: Relational dimension”, and ranges from negative 1.00 to 1.50 in increments of 0.5 units. The vertical axis is labeled “Knowledge and information transfer”, and ranges from negative 0.80 to 0.40 in increments of 0.20 units. Each graph contains three lines corresponding to the sector categories “N G O”, “Private”, and “Public”, as indicated in the legend on the right. In the graph at the top labeled “Low levels of Resource availability”, the first line, representing “N G O” and drawn as a solid line, begins at (negative 0.98, 0.43), passes through the point (0.20, 0.30), and ends at (1.10, 0.19). The line has the label “negative 0.11 (0.17)” placed above it. The second line, representing the “Private” sector and drawn as a dash-dotted line, begins at (negative 0.98, negative 0.02), passes through the point (0.20, 0.24), and ends at (1.10, 0.44). The line is labeled “0.24 (0.13)”. The third line, representing the “Public” sector and drawn as a dashed line, begins at (negative 0.98, negative 0.10), passes through the point (0.20, 0.18), and ends at (1.10, 0.39). The line has the label “0.25 single asterisk (0.10)”. In the middle graph labeled “Medium levels of Resource availability”, the first line, representing “N G O”, begins at (negative 0.98, 0.17), passes through the point (0.20, 0.17), and ends at (1.10, 0.15). The line is labeled “negative 0.01 (0.16)”. The second line, representing the “Private” sector, begins at (negative 0.98, negative 0.28), passes through the point (0.20, 0.13), and ends at (1.10, 0.43). The line is labeled “0.34 double asterisk (0.11)”. The third line, representing the “Public” sector, begins at (negative 0.98, negative 0.35), passes through the point (0.20, 0.07), and ends at (1.10, 0.39). The line is labeled “0.35 triple asterisk (0.07)”. In the bottom panel labeled “High levels of Resource availability”, the first line, representing “N G O”, begins at (negative 0.98, negative 0.17), passes through the point (0.20, negative 0.02), and ends at (1.10, 0.09). The line is labeled “0.12 (0.17)”. The second line, representing the “Private” sector, begins at (negative 0.98, negative 0.63), passes through the point (0.20, negative 0.08), and ends at (1.10, 0.35). The line is labeled “0.48 triple asterisk (0.13)”. The third line, representing the “Public” sector, begins at (negative 0.98, negative 0.71), passes through the point (0.20, negative 0.13), and ends at (1.10, 0.30). The line is labeled “0.49 triple asterisk (0.07)”. At the bottom of the figure, a note reads as follows: “Note(s): Unstandardized coefficients (b) provided; standard errors in parenthesis; asterisk p less than 0.05; double asterisk p less than 0.01; triple asterisk p less than 0.001; resource availability: low at sixteenth, medium at fiftieth, and high at eighty-fourth percentile of conditioning values”. Followed by “Source(s): Authors’ work”. Note: All numerical data values are approximated.

Conditional effects of social capital at the low, medium and low values of resources (relational dimension)

Close Figure 4
Figure 5
A research model showing social capital dimensions linked to knowledge transfer with moderating factors.The model shows a box divided into three equal sections and labeled from top to bottom as follows: “Structural dimension (density and intensity of relationships)”, “Relational dimension (trust and reciprocity)”, and “Cognitive dimension (L T C vision and values)”. These three sections are labeled together as “Social capital” in a vertical orientation on the left side of the box. From “Structural dimension (density and intensity of relationships)”, a solid arrow labeled “H 1 a” extends rightward and points to a text box labeled “Knowledge and information Transfer”. From “Relational dimension (trust and reciprocity)”, a solid arrow labeled “H 1 b” arises and points to “Knowledge and information Transfer”. From “Cognitive dimension (L T C vision and values)”, a dashed arrow labeled “H 1 c” points to “Knowledge and information Transfer”. Above these three arrows, two boxes are presented horizontally. The box on the left is labeled “Resource Availability”, and the box on the right is labeled “Sector (N G O, Private, State)”. From “Resource Availability”, a dashed arrow labeled “H 3 c” arises and points to the “H 1 c” arrow. From “Resource Availability”, a solid arrow labeled “H 3 b” arises and points to the “H 1 b” arrow. From “Resource Availability”, another solid arrow labeled “H 3 a” arises and points to the “H 1 a” arrow. From “Sector (N G O, Private, State)”, a dashed arrow labeled “H 2 a” arises and points to the “H 1 a” arrow. From the same box, two solid arrows arise and are labeled “H 2 c” and “H 2 b”. The arrow labeled “H 2 c” extends downward and points to the “H 1 c” arrow, and “H 2 b” points downward to the “H 1 b” arrow. At the bottom right, a solid right-pointing arrow is shown labeled “Significant effects”, and a dashed right-pointing arrow labeled “Non-significant effects”, followed by a note titled “Control variables”, labeled as follows: “Type of activity (administrative or non-administrative)”.

Final research model

Figure 5
A research model showing social capital dimensions linked to knowledge transfer with moderating factors.The model shows a box divided into three equal sections and labeled from top to bottom as follows: “Structural dimension (density and intensity of relationships)”, “Relational dimension (trust and reciprocity)”, and “Cognitive dimension (L T C vision and values)”. These three sections are labeled together as “Social capital” in a vertical orientation on the left side of the box. From “Structural dimension (density and intensity of relationships)”, a solid arrow labeled “H 1 a” extends rightward and points to a text box labeled “Knowledge and information Transfer”. From “Relational dimension (trust and reciprocity)”, a solid arrow labeled “H 1 b” arises and points to “Knowledge and information Transfer”. From “Cognitive dimension (L T C vision and values)”, a dashed arrow labeled “H 1 c” points to “Knowledge and information Transfer”. Above these three arrows, two boxes are presented horizontally. The box on the left is labeled “Resource Availability”, and the box on the right is labeled “Sector (N G O, Private, State)”. From “Resource Availability”, a dashed arrow labeled “H 3 c” arises and points to the “H 1 c” arrow. From “Resource Availability”, a solid arrow labeled “H 3 b” arises and points to the “H 1 b” arrow. From “Resource Availability”, another solid arrow labeled “H 3 a” arises and points to the “H 1 a” arrow. From “Sector (N G O, Private, State)”, a dashed arrow labeled “H 2 a” arises and points to the “H 1 a” arrow. From the same box, two solid arrows arise and are labeled “H 2 c” and “H 2 b”. The arrow labeled “H 2 c” extends downward and points to the “H 1 c” arrow, and “H 2 b” points downward to the “H 1 b” arrow. At the bottom right, a solid right-pointing arrow is shown labeled “Significant effects”, and a dashed right-pointing arrow labeled “Non-significant effects”, followed by a note titled “Control variables”, labeled as follows: “Type of activity (administrative or non-administrative)”.

Final research model

Close Figure 5
Table 1

Variables description, averages, and Cronbach α reliability scores

Variable nameVariable descriptionMean (St.Dev.)*Cronbach ɑ
1. NGO (N = 44)2. Private (N = 51)3. Public (N = 170)Total (N = 265)
Dependent variablesKnowledge and information transfer5-item scale (1–6)4.43 (0.97)4.45 (1.29)4.57 (1.31)4.52 (1.25)0.896
Independent variables (dimensions of social capital)Structural (number of relationships and interaction frequency)No of groups with whom a person interacts * frequency of interaction (0–60)12.612,3 (10.44)18.611,3 (10.70)23.631,2 (9.47)20.83 (10.68) 
Relational (trust and reciprocity)3-item scale (1–6)3.972,3 (0.89)4.581 (1.21)4.51 (1.13)4.42 (1.13)0.825
Cognitive (LTC vision and values)5-item scale (1–6)5.55 (0.75)5.71 (0.82)5.81 (0.55)5.75 (0.65)0.875
ModeratorsResource availability2-item scale (1–6)2.38 (1.17)2.99 (1.58)2.86 (1.52)2.8 (1.49)0.806
SectorNGO, private, public (dummy variables)     
Control variableType of activity1 – administrative, 0 – non-administrative     

Note(s): * One-Way Anova used to compare means. Superscript number next to a mean indicates significant difference at 0.01 level and a comparison group number: 1 NGO; 2 Private; 3 Public

Source(s): Authors’ work

Table 2

Regression analysis results

Hypothesis No.
1a,b,c2a2b2c3a3b3c
Structural0.26*** (0.06)0.19 (0.13)0.32*** (0.06)0.32*** (0.06)0.23 (0.13)0.32*** (0.06)0.33*** (0.06)
Relational0.39*** (0.06)0.41*** (0.05)0.04 (0.16)0.4*** (0.05)0.35*** (0.06)0.01 (0.16)0.37*** (0.05)
Cognitive0.08 (0.06)0.09 (0.06)0.09 (0.06)−0.15 (0.11)0.10 (0.05)0.10 (0.05)−0.21 (0.13)
Private −0.34 (0.21)−0.26 (0.19)−0.33 (0.18)−0.27 (0.2)−0.12 (0.19)−0.33 (0.18)
Public −0.33 (0.18)−0.27 (0.17)−0.35* (0.16)−0.22 (0.18)−0.18 (0.17)−0.35* (0.16)
Resources    −0.15** (0.05)−0.17*** (0.05)−0.13* (0.06)
Structural * Private (w1) −0.02 (0.18)  −0.06 (0.18)  
Structural * Public (w2) 0.22 (0.15)  0.14 (0.15)  
Relational * Private (w1)  0.41* (0.2)  0.35 (0.19) 
Relational * Public (w2)  0.43* (0.18)  0.36* (0.17) 
Cognitive * Private (w1)   0.33* (0.15)  0.51* (0.2)
Cognitive * Public (w2)   0.29* (0.14)  0.40* (0.16)
Structural * Resources    0.15** (0.05)  
Relational * Resources     0.10* (0.04) 
Cognitive * Resources      −0.12 (0.07)
Administrative position−0.13 (0.15)−0.15 (0.15)−0.09 (0.15)−0.09 (0.15)−0.18 (0.15)−0.12 (0.15)−0.08 (0.15)
R20.270.300.310.310.350.350.34
N265265265265265265265

Note(s): Dependent variable: Knowledge and information transfer; Unstandardized coefficients (b) provided; standard errors in parenthesis; *p < 0.05. **p < 0.01. ***p < 0.001

Source(s): Authors’ work

Supplements

References

Abendstern
,
M.
,
Hughes
,
J.
,
Jasper
,
R.
,
Sutcliffe
,
C.
and
Challis
,
D.
(
2018
), “
Care coordination for older people in the third sector: scoping the evidence
”,
Health and Social Care in the Community
, Vol. 
26
No. 
3
, pp. 
314
-
329
, doi: .
Adler
,
P.S.
and
Kwon
,
S.-W.
(
2002
), “
Social capital: prospects for a new concept
”,
Academy of Management Review
, Vol. 
27
No. 
1
, pp. 
17
-
40
, doi: .
Akhavan
,
P.
and
Mahdi Hosseini
,
S.
(
2016
), “
Social capital, knowledge sharing, and innovation capability: an empirical study of R&D teams in Iran
”,
Technology Analysis and Strategic Management
, Vol. 
28
No. 
1
, pp. 
96
-
113
.
Al-Tabbaa
,
O.
and
Ankrah
,
S.
(
2016
), “
Social capital to facilitate ‘engineered’ university–industry collaboration for technology transfer: a dynamic perspective
”,
Technological Forecasting and Social Change
, Vol. 
104
, pp. 
1
-
15
, doi: .
Alderwick
,
H.
,
Hutchings
,
A.
,
Briggs
,
A.
and
Mays
,
N.
(
2021
), “
The impacts of collaboration between local health care and non-health care organizations and factors shaping how they work: a systematic review of reviews
”,
BMC Public Health
, Vol. 
21
, pp. 
1
-
16
, doi: .
Auschra
,
C.
(
2018
), “
Barriers to the integration of care in inter-organisational settings: a literature review
”,
International Journal of Integrated Care
, Vol. 
18
No. 
1
, p.
5
, doi: .
Bloice
,
L.
and
Burnett
,
S.
(
2016
), “
Barriers to knowledge sharing in third sector social care: a case study
”,
Journal of Knowledge Management
, Vol. 
20
No. 
1
, pp. 
125
-
145
, doi: .
Bourdieu
,
P.
(
1985
), “The forms of capital”, in
Richardson
,
J.G.
(Ed.),
Handbook of Theory and Research for the Sociology of Education
,
Greenwood
,
New York
, pp. 
241
-
258
.
Carlini
,
J.
,
Lehman
,
K.
,
Dharmesti
,
M.
and
Knox
,
K.
(
2023
), “
Maximizing value in healthcare partnerships: a case examining an inter-organizational relationship in the public and non-profit sectors
”,
Journal of Philanthropy and Marketing
, Vol. 
28
No. 
3
, e1796, doi: .
Cohen
,
J.
(
1992
), “
A power primer
”,
Psychological Bulletin
, Vol. 
112
No. 
1
, pp. 
155
-
159
, doi: .
Coleman
,
J.S.
(
1988
), “
Social capital in the creation of human capital
”,
American Journal of Sociology
, Vol. 
94
, pp. 
95
-
120
, doi: .
Curado
,
C.
,
Henriques
,
P.
,
Oliveira
,
M.
and
Martins
,
R.
(
2023
), “
Organisational culture as an antecedent of knowledge sharing in NGOs
”,
Knowledge Management Research and Practice
, Vol. 
21
No. 
3
, pp. 
449
-
461
, doi: .
Derose
,
K.P.
and
Varda
,
D.M.
(
2009
), “
Social capital and health care access: a systematic review
”,
Medical Care Research and Review: MCRR
, Vol. 
66
No. 
3
, pp. 
272
-
306
, doi: .
Dickinson
,
H.
,
Allen
,
K.
,
Alcock
,
P.
,
Macmillan
,
R.
and
Glasby
,
J.
(
2012
),
The Role of the Third Sector in Delivering Social Care
,
NIHR School for Social Care Research
,
London
.
Doornebosch
,
A.J.
,
Smaling
,
H.J.A.
and
Achterberg
,
W.P.
(
2022
), “
Interprofessional collaboration in long-term care and rehabilitation: a systematic review
”,
Journal of the American Medical Directors Association
, Vol. 
23
No. 
5
, pp. 
764
-
777.e2
, doi: .
Enjolras
,
B.
and
Sivesind
,
K.H.
(
2018
), “The roles and impacts of the third sector in Europe”, in
Enjolras
,
B.
,
Salamon
,
L.M.
,
Sivesind
,
K.H.
and
Zimmer
,
A.
(Eds),
The Third Sector as a Renewable Resource for Europe: Concepts, Impacts, Challenges and Opportunities
,
Springer International Publishing
,
Cham
, pp. 
95
-
124
.
European Commission
(
2021a
),
Long-term Care Report – Trends, Challenges and Opportunities in an Ageing Society
, Vol.
I
,
Publications Office
,
Luxembourg
.
European Commission
(
2021b
),
Long-Term Care Report. Trends, Challenges and Opportunities in an Ageing Society
,
Publications Office of the European Union
,
Luxembourg
.
Eurostat
(
2022
), “
Living conditions in Europe - poverty and social exclusion
”,
available at:
 Link to the website
Favero
,
N.
and
Bullock
,
J.B.
(
2015
), “
How (not) to solve the problem: an evaluation of scholarly responses to common source bias
”,
Journal of Public Administration Research and Theory
, Vol. 
25
No. 
1
, pp. 
285
-
308
, doi: .
Ferrer-Serrano
,
M.
,
Fuentelsaz
,
L.
and
Latorre-Martinez
,
M.P.
(
2022
), “
Examining knowledge transfer and networks: an overview of the last twenty years
”,
Journal of Knowledge Management
, Vol. 
26
No. 
8
, pp. 
2007
-
2037
, doi: .
Ganguly
,
A.
,
Talukdar
,
A.
and
Chatterjee
,
D.
(
2019
), “
Evaluating the role of social capital, tacit knowledge sharing, knowledge quality and reciprocity in determining innovation capability of an organization
”,
Journal of Knowledge Management
, Vol. 
23
No. 
6
, pp. 
1105
-
1135
, doi: .
Gazley
,
B.
(
2010
), “
Why not partner with local government? Nonprofit managerial perceptions of collaborative disadvantage
”,
Nonprofit and Voluntary Sector Quarterly
, Vol. 
39
No. 
1
, pp.
51
-
76
.
Gonçalves
,
T.
,
Curado
,
C.
and
Balle
,
A.R.
(
2022
), “
Psychosocial antecedents of knowledge sharing in healthcare research centers: a mixed-methods approach
”,
Journal of Health, Organisation and Management
, Vol. 
36
No. 
1
, pp. 
1
-
23
, doi: .
Gonçalves
,
T.
,
Muñoz-Pascual
,
L.
and
Curado
,
C.
(
2024
), “
Is knowledge liberating? The role of knowledge behaviors and competition on the workplace happiness of healthcare professionals
”,
Journal of Health, Organisation and Management
, Vol. 
38
No. 
4
, pp. 
469
-
493
, doi: .
Hayes
,
A.F.
(
2018
),
Introduction to Mediation, Moderation, and Conditional Process Analysis: A Regression-Based Approach
,
Guilford Publications
,
New York
.
He
,
W.
and
Wei
,
K.-K.
(
2009
), “
What drives continued knowledge sharing? An investigation of knowledge-contribution and-seeking beliefs
”,
Decision Support Systems
, Vol. 
46
No. 
4
, pp.
826
-
838
.
Hemmert
,
M.
(
2019
), “
The relevance of inter-personal ties and inter-organizational tie strength for outcomes of research collaborations in South Korea
”,
Asia Pacific Journal of Management
, Vol. 
36
No. 
2
, pp. 
373
-
393
, doi: .
Hengelaar
,
A.H.
,
van Hartingsveldt
,
M.
,
Wittenberg
,
Y.
,
van Etten-Jamaludin
,
F.
,
Kwekkeboom
,
R.
and
Satink
,
T.
(
2018
), “
Exploring the collaboration between formal and informal care from the professional perspective—a thematic synthesis
”,
Health and Social Care in the Community
, Vol. 
26
No. 
4
, pp. 
474
-
485
, doi: .
Hujala
,
T.
and
Laihonen
,
H.
(
2021
), “
Effects of knowledge management on the management of health and social care: a systematic literature review
”,
Journal of Knowledge Management
, Vol. 
25
No. 
11
, pp. 
203
-
221
, doi: .
Hujala
,
T.
and
Laihonen
,
H.
(
2023
), “
Knowledge management in a regional integrated health and social care system
”,
Journal of Integrated Care
, Vol. 
31
No. 
5
, pp. 
15
-
28
, doi: .
Jang
,
H.S.
,
Feiock
,
R.C.
and
Saitgalina
,
M.
(
2016
), “
Institutional collective action issues in nonprofit self-organized collaboration
”,
Administration and Society
, Vol. 
48
No. 
2
, pp. 
163
-
189
, doi: .
Jeon
,
S.
,
Kim
,
Y.G.
and
Koh
,
J.
(
2011
), “
An integrative model for knowledge sharing in communities‐of‐practice
”,
Journal of Knowledge Management
, Vol. 
15
No. 
2
, pp. 
251
-
269
, doi: .
Kim
,
M.
and
Peng
,
S.
(
2018
), “
The dilemma for small human service nonprofits: engaging in collaborations with limited human resource capacity
”,
Nonprofit Management and Leadership
, Vol. 
29
No. 
1
, pp. 
83
-
103
, doi: .
Koay
,
K.Y.
,
Sandhu
,
M.S.
,
Tjiptono
,
F.
and
Watabe
,
M.
(
2022
), “
Understanding employees' knowledge hiding behaviour: the moderating role of market culture
”,
Behaviour and Information Technology
, Vol. 
41
No. 
4
, pp. 
694
-
711
, doi: .
Kosklin
,
R.
,
Lammintakanen
,
J.
and
Kivinen
,
T.
(
2023
), “
Knowledge management effects and performance in health care: a systematic literature review
”,
Knowledge Management Research and Practiceand
, Vol. 
21
No. 
4
, pp. 
738
-
748
, doi: .
Laihonen
,
H.
,
Kork
,
A.-A.
and
Sinervo
,
L.-M.
(
2024
), “
Advancing public sector knowledge management: towards an understanding of knowledge formation in public administration
”,
Knowledge Management Research and Practiceand
, Vol. 
22
No. 
3
, pp. 
223
-
233
, doi: .
Lee
,
H.
,
Ki-Hyun
,
U.
,
Hughes
,
P.
,
Hughes
,
M.
and
Shine
,
E.-K.
(
2023
), “
Understanding knowledge transfer in M&As: an integration of resource orchestration and social capital theories and evidence from UK acquiring firms
”,
European Management Journal
, Vol. 
41
No. 
2
, pp. 
199
-
211
.
Levin
,
D.Z.
and
Walter
,
J.
(
2019
), “
Before they were ties: predicting the value of brand-new connections
”,
Journal of Management
, Vol. 
45
No. 
7
, pp. 
2861
-
2890
, doi: .
Lim
,
S.Y.
,
Jarvenpaa
,
S.L.
and
Lanham
,
H.J.
(
2015
), “
Barriers to interorganizational knowledge transfer in post-hospital care transitions: review and directions for information systems research
”,
Journal of Management Information Systems
, Vol. 
32
No. 
3
, pp.
48
-
74
, doi: .
Lørum
,
R.M.
and
Smith
,
F.
(
2024
), “
Strategies and practices for organizational learning in integrated care
”,
Journal of Health, Organization and Management
, Vol. 
38
No. 
6
, pp. 
942
-
960
, doi: .
Lyng
,
H.B.
,
Ree
,
E.
,
Strømme
,
T.
,
Johannessen
,
T.
,
Aase
,
I.
,
Ullebust
,
B.
,
Thomsen
,
L.H.
,
Holen-Rabbersvik
,
E.
,
Schibevaag
,
L.
,
Bates
,
D.W.
and
Wiig
,
S.
(
2024
), “
Barriers and enablers for externally and internally driven implementation processes in healthcare: a qualitative cross-case study
”,
BMC Health Services Research
, Vol. 
24
No. 
1
, p.
528
, doi: .
Maurer
,
I.
,
Bartsch
,
V.
and
Ebers
,
M.
(
2011
), “
The value of intra-organizational social capital: how it fosters knowledge transfer, innovation performance, and growth
”,
Organization Studies
, Vol. 
32
No. 
2
, pp. 
157
-
185
, doi: .
McFadyen
,
M.A.
and
Cannella Jr
,
A.A.
(
2004
), “
Social capital and knowledge creation: diminishing returns of the number and strength of exchange relationships
”,
Academy of Management Journal
, Vol. 
47
No. 
5
, pp. 
735
-
746
, doi: .
Miković
,
R.
,
Petrović
,
D.
,
Mihić
,
M.
,
Obradović
,
V.
and
Todorović
,
M.
(
2020
), “
The integration of social capital and knowledge management–The key challenge for international development and cooperation projects of nonprofit organizations
”,
International Journal of Project Management
, Vol. 
38
No. 
8
, pp. 
515
-
533
, doi: .
Moshtari
,
M.
and
Vanpoucke
,
E.
(
2021
), “
Building successful NGO–business relationships: a social capital perspective
”,
Journal of Supply Chain Management
, Vol. 
57
No. 
3
, pp. 
104
-
129
, doi: .
Nadeem
,
M.A.
,
Liu
,
Z.
,
Ghani
,
U.
,
Younis
,
A.
and
Xu
,
Y.
(
2021
), “
Impact of shared goals on knowledge hiding behavior: the moderating role of trust
”,
Management Decision
, Vol. 
59
No. 
6
, pp. 
1312
-
1332
, doi: .
Nahapiet
,
J.
and
Ghoshal
,
S.
(
1998
), “
Social capital, intellectual capital, and the organizational advantage
”,
Academy of Management Review
, Vol. 
23
No. 
2
, pp. 
242
-
266
, doi: .
Oh
,
Y.
and
Bush
,
C.B.
(
2016
), “
Exploring the role of dynamic social capital in collaborative governance
”,
Administration and Society
, Vol. 
48
No. 
2
, pp. 
216
-
236
, doi: .
Pearson
,
C.
and
Watson
,
N.
(
2018
), “
Implementing health and social care integration in Scotland: renegotiating new partnerships in changing cultures of care
”,
Health and Social Care in the Community
, Vol. 
26
No. 
3
, pp. 
e396
-
e403
, doi: .
Pedersen
,
L.M.
,
Jakobsen
,
A.L.
,
Buttenschøn
,
H.N.
and
Haagerup
,
A.
(
2023
), “
Positive association between social capital and the quality of health care service: a cross-sectional study
”,
International Journal of Nursing Studies
, Vol. 
137
, 104380, doi: .
Podsakoff
,
P.M.
,
MacKenzie
,
S.B.
,
Lee
,
J.-Y.
and
Podsakoff
,
N.P.
(
2003
), “
Common method biases in behavioral research: a critical review of the literature and recommended remedies
”,
Journal of Applied Psychology
, Vol. 
88
No. 
5
, pp. 
879
-
903
, doi: .
Poškutė
,
V.
and
Greve
,
B.
(
2017
), “
Long‐term care in Denmark and Lithuania–A most dissimilar case
”,
Social Policy and Administration
, Vol. 
51
No. 
4
, pp. 
659
-
675
, doi: .
Poškutė
,
V.
,
Kazlauskaitė
,
R.
and
Matonytė
,
I.
(
2022
), “
Stakeholder collaboration in long-term care of older people in Lithuania
”,
Health and Social Care in the Community
, Vol. 
30
No. 
1
, pp. 
193
-
202
, doi: .
Putnam
,
R.D.
(
1993
), “
What makes democracy work?
”,
National Civic Review
, Vol. 
82
No. 
2
, pp. 
101
-
107
, doi: .
Radević
,
I.
,
Dimovski
,
V.
,
Lojpur
,
A.
and
Colnar
,
S.
(
2023
), “
Quality of healthcare services in focus: the role of knowledge transfer, hierarchical organizational structure and trust
”,
Knowledge Management Research and Practice
, Vol. 
21
No. 
3
, pp. 
525
-
536
, doi: .
Rathi
,
D.
and
Given
,
L.M.
(
2017
), “
Non-profit organizations' use of tools and technologies for knowledge management: a comparative study
”,
Journal of Knowledge Management
, Vol. 
21
No. 
4
, pp. 
718
-
740
, doi: .
Reynaers
,
A.M.
and
van der Wal
,
Z.
(
2018
), “
Do partners in PPPs view public and private management differently? Re‐examining Boyne’s hypotheses in the context of collaboration
”,
Australian Journal of Public Administration
, Vol. 
77
No. 
2
, pp. 
294
-
308
, doi: .
Riedel
,
M.
,
Kraus
,
M.
and
Mayer
,
S.
(
2016
), “
Organization and supply of long-term care services for the elderly: a bird's-eye view of old and new EU member states
”,
Social Policy and Administration
, Vol. 
50
No. 
7
, pp. 
824
-
845
, doi: .
Rodríguez-Aceves
,
L.
,
Mojarro-Durán
,
B.I.
and
Rivera
,
A.E.
(
2023
), “
Enabling knowledge sharing through relational capital in a family business context
”,
Journal of the Knowledge Economy
, Vol. 
14
No. 
3
, pp. 
2156
-
2186
, doi: .
Rydenfält
,
C.
,
Persson
,
J.
,
Larsson
,
R.
,
Johansson
,
G.
and
Erlingsdóttir
,
G.
(
2024
), “
Inter-organizational home care nursing teams: a comparison of a region wide organizational change initiative with success factors identified by forerunners and team theory
”,
Home Health Care Management and Practice
, Vol. 
36
No. 
3
, pp. 
151
-
156
, doi: .
Santos
,
R.F.
,
Oliveira
,
M.
and
Curado
,
C.
(
2023
), “
The effects of the relational dimension of social capital on tacit and explicit knowledge sharing: a mixed-methods approach
”,
VINE Journal of Information and Knowledge Management Systems
, Vol. 
53
No. 
1
, pp. 
43
-
63
, doi: .
Schneider
,
J.A.
(
2009
), “
Organizational social capital and nonprofits
”,
Nonprofit and Voluntary Sector Quarterly
, Vol. 
38
No. 
4
, pp. 
643
-
662
, doi: .
Schulmann
,
K.
,
Leichsenring
,
K.
and
Genta
,
M.
(
2014
), “
Social support and long-term care in Eu care regimes. framework conditions and initiatives of social innovation in an active ageing perspective
”,
Overview Report. WP8 MoPAct Project
.
Selsky
,
J.W.
and
Parker
,
B.
(
2005
), “
Cross-sector partnerships to address social issues: challenges to theory and practice
”,
Journal of Management
, Vol. 
31
No. 
6
, pp. 
849
-
873
, doi: .
Simons
,
M.
,
Goossensen
,
A.
and
Nies
,
H.
(
2022
), “
Interventions fostering interdisciplinary and inter-organizational collaboration in health and social care; an integrative literature review
”,
Journal of Interprofessional Education and Practice
, Vol. 
28
, 100515, doi: .
Song
,
A.M.
,
Saavedra Cisneros
,
A.
,
Temby
,
O.
,
Sandall
,
J.
,
Cooksey
,
R.W.
and
Hickey
,
G.M.
(
2019
), “
On developing an inter-agency trust scale for assessing governance networks in the public sector
”,
International Public Management Journal
, Vol. 
22
No. 
4
, pp. 
691
-
710
, doi: .
Spasova
,
S.
,
Baeten
,
R.
,
Coster
,
S.
,
Ghailani
,
D.
and
Peña-Casas
,
R.V.B.
(
2018
),
Challenges in Long-Term Care in Europe, A Study of National Policies 2018
,
European Social Policy Network (ESPN)
,
Brussels, European Commission
.
Statistics Lithuania
(
2022
), “
The population of Lithuania
”,
available at:
 Link to the website
Statistics Lithuania
(
2023
), “
The Population of Lithuania
”,
available at:
 Link to the website
Sunnemark
,
F.
,
Lundqvist Westin
,
W.
,
Al Saad
,
T.
and
Assmo
,
P.
(
2024
), “
Exploring barriers and facilitators to knowledge transfer and learning processes through a cross-departmental collaborative project in a municipal organization
”,
The Learning Organization
, Vol. 
31
No. 
3
, pp. 
358
-
374
, doi: .
Susha
,
I.
,
Rukanova
,
B.
,
Zuiderwijk
,
A.
,
Gil-Garcia
,
J.R.
and
Gasco Hernandez
,
M.
(
2023
), “
Achieving voluntary data sharing in cross sector partnerships: three partnership models
”,
Information and Organization
, Vol. 
33
No. 
1
, 100448, doi: .
Tavakol
,
M.
and
Dennick
,
R.
(
2011
), “
Making sense of Cronbach’s alpha
”,
International Journal of Medical Education
, Vol. 
2
, pp. 
53
-
55
, doi: .
Taylor
,
S.
and
Todd
,
P.A.
(
1995
), “
Understanding information technology usage: a test of competing models
”,
Information Systems Research
, Vol. 
6
No. 
2
, pp. 
144
-
176
, doi: .
Torchia
,
M.
,
Calabrò
,
A.
and
Morner
,
M.
(
2015
), “
Public–private partnerships in the health care sector: a systematic review of the literature
”,
Public Management Review
, Vol. 
17
No. 
2
, pp. 
236
-
261
, doi: .
Triandis
,
H.C.
(
1977
),
Interpersonal Behavior
,
Brooks/Cole
,
Monterey
.
van der Schors
,
W.
,
Roos
,
A.-F.
,
Kemp
,
R.
and
Varkevisser
,
M.
(
2021
), “
Inter-organizational collaboration between healthcare providers
”,
Health Services Management Research
, Vol. 
34
No. 
1
, pp. 
36
-
46
, doi: .
Van Wijk
,
R.
,
Jansen
,
J.J.
and
Lyles
,
M.A.
(
2008
), “
Inter‐and intra‐organizational knowledge transfer: a meta‐analytic review and assessment of its antecedents and consequences
”,
Journal of Management Studies
, Vol. 
45
No. 
4
, pp. 
830
-
853
, doi: .
Widén-Wulff
,
G.
and
Ginman
,
M.
(
2004
), “
Explaining knowledge sharing in organizations through the dimensions of social capital
”,
Journal of Information Science
, Vol. 
30
No. 
5
, pp. 
448
-
458
, doi: .
Woschke
,
T.
,
Haase
,
H.
and
Kratzer
,
J.
(
2017
), “
Resource scarcity in SMEs: effects on incremental and radical innovations
”,
Management Research Review
, Vol. 
40
No. 
2
, pp. 
195
-
217
, doi: .
Yadav
,
S.K.
,
Singh
,
S.
and
Prusty
,
S.K.
(
2025
), “
An integrative perspective on inter-organisational collaboration in healthcare: a modified total interpretive structural modelling approach
”,
Journal of Health, Organization and Management
, Vol.
ahead-of-print
No.
ahead-of-print
, doi: .
Yang
,
T.-M.
and
Maxwell
,
T.A.
(
2011
), “
Information-sharing in public organizations: a literature review of interpersonal, intra-organizational and inter-organizational success factors
”,
Government Information Quarterly
, Vol. 
28
No. 
2
, pp. 
164
-
175
, doi: .
Yoshida
,
Y.
,
Hirakawa
,
Y.
,
Hong
,
Y.J.
,
Mamun
,
M.R.
,
Shimizu
,
H.
,
Nakano
,
Y.
and
Yatsuya
,
H.
(
2024
), “
Factors influencing interprofessional collaboration in long-term care from a multidisciplinary perspective: a case study approach
”,
Home Health Care Services Quarterly
, Vol. 
43
No. 
4
, pp. 
239
-
258
, doi: .
Zbuchea
,
A.
,
Ivan
,
L.
,
Petropoulos
,
S.
and
Pinzaru
,
F.
(
2020
), “
Knowledge sharing in NGOs: the importance of the human dimension
”,
Kybernetes
, Vol. 
49
No. 
1
, pp. 
182
-
199
, doi: .
Zhao
,
L.
and
Detlor
,
B.
(
2023
), “
Towards a contingency model of knowledge sharing: interaction between social capital and social exchange theories
”,
Knowledge Management Research and Practice
, Vol. 
21
No. 
1
, pp. 
197
-
209
, doi: .