Article navigation

This issue captures how built infrastructure demands are intricately and globally linked to data and digital aspects. The issue starts by underpinning the needs of infrastructure for growth (Khaki and Cash, 2026). However, delivery of such infrastructure often poses key obstacles in terms of time, cost and quality. Jadidoleslami et al. (2026) demonstrate how such factors can be systematically handled as an integral part of project management. Jiang et al. (2026) show at an urban renewal level how city information modelling can make urban spaces liveable, green, resilient, smart and cultural and how sensing and monitoring frameworks can play a key role in it.

Subsequently, a number of works investigate a number of built infrastructure sectors. Chen (2026) highlights how data analytics can be helpful in establishing the water demand for fire, while Lan (2026) focuses on how BIM modelling and operation & maintenance management of large-scale bridges can be helpful. The impact of such a data-driven approach can be equally relevant for underserved areas. Myakala et al. (2026) investigated how sustainable pavement maintenance treatment options for low-volume rural roads can be made fundamental to efficient strategies.

Morshed (2026) highlight the ability of digital twins to influence such projects, and emphasizes this in the context of Gulf Co-operation Council infrastructure. How such a vision can be translated to real projects is shown by Saback et al. (2026) through a case study of a reinforced concrete chimney in Sweden.

Finally, Bondinuba et al. (2026) conclude the issue with their commentary on a particularly important human factor which can defeat excellence in engineering, technology and data science – corruption.

As built infrastructure lifelines degrade and become exposed relentlessly to natural and anthropogenic hazards, there is a strong need to listen to the experiences of different countries in terms of how they manage their assets. To this effect, the Editorial Board of INAM is pleased to highlight the article ‘Addressing Extreme Weather in Transportation Asset Management Plans: A US Perspective’ by Lauren Gardner and Mark Abkowitz, which has been awarded the 2026 ICE Publishing Infrastructure Asset Management Prize. Selected in recognition of its exceptional quality and contribution to the infrastructure asset management community, the paper is available free to read for one year as part of the ICE Publishing Awards programme.

Read the article here: Addressing extreme weather in transportation asset management plans: a US perspective | Infrastructure Asset Management | Emerald Publishing.

Bondinuba
FK
,
Ameyaw
C
,
Mewomo
M
and
Somi
F
(
2026
)
The anthropological and motivational dimensions of corruption in the construction industry
.
Infrastructure Asset Management
13
(3)
:
279
291
, .
Chen
X
(
2026
)
Method of predicting fire water demand based on big data
.
Infrastructure Asset Management
13
(3)
:
204
214
, .
Jadidoleslami
S
,
Saghatforoush
E
,
Zareravasan
A
and
Mansouri
T
(
2026
)
Constructability obstacles: an FCM-based dynamic modelling
.
Infrastructure Asset Management
13
(3)
:
169
192
, .
Jiang
X
,
Yang
L
,
Xu
G
,
Quan
W
and
Yang
L
(
2026
)
Exploring the CIM-based framework for safety hazards identification in urban renewal
.
Infrastructure Asset Management
13
(3)
:
193
203
, .
Khaki
MA
and
Cash
TA
(
2026
)
Symmetric and asymmetric impact of infrastructure on economic growth in India
.
Infrastructure Asset Management
13
(3)
:
152
168
, .
Lan
Z
(
2026
)
BIM modelling and operation & maintenance management of large-scale bridges: a CATIA-based approach
.
Infrastructure Asset Management
13
(3)
:
215
226
, .
Morshed
A
(
2026
)
Digital twin adoption, cost accounting, and sustainability in GCC infrastructure systems
.
Infrastructure Asset Management
13
(3)
:
255
265
, .
Myakala
RR
,
Joshi
N
and
Sabavath
S
(
2026
)
Development of sustainable pavement maintenance treatment options for low-volume rural roads
.
Infrastructure Asset Management
13
(3)
:
227
254
, .
Saback
V
,
Popescu
C
,
Täljsten
B
and
Blanksvärd
T
(
2026
)
Purpose-driven roadmap for digital twins in engineering & construction: case study
.
Infrastructure Asset Management
13
(3)
:
266
278
, .
Licensed re-use rights only

or Create an Account

Close subscription notice
Close access options