Dikes constructed from sand generally have a sand core and clay layers on the slopes and the crest to protect the core against erosion. In extreme hydraulic conditions, several failure mechanisms can lead to destruction of the clay layers, exposing the sand core to water. When water overtops the dike and the protective cover of the land-side slope or the crest fails, water flows over the core and erodes the sand. The dike starts to breach, and eventually the land behind the dike is flooded. The rate at which the dimensions of the breach grow influences the rate of inundation of the polder. Reduction of the inundation rate may be achieved by retarding the breaching process. This may reduce the number of casualties, resulting in increasing safety for the inhabitants. In order to achieve, for instance, a safety level ten times higher, mortality has to decrease by a factor of 10. The breaching process can be retarded by reducing the erosion velocity of the sand core. Experiments were executed to investigate the effect on the erosion velocity of adding bentonite to sand. The results of these experiments showed a significant reduction of the permeability and erosion velocity of the sand–bentonite mixtures compared with those of pure sand. The effect of adding bentonite on the breaching process was investigated by applying the Bres model (breach erosion in sand dikes model) to a sand dike tested in a large-scale field experiment (Zwin'94). It was found that adding a small percentage of bentonite reduces the rate of breach growth and the inundation rate in the polder. For the Zwin’94 dike it was determined that 5·4% of bentonite is sufficient to reduce the inundation rate below a threshold value of 0·5 m/h, leading to a significant increase in safety.
Article navigation
September 2016
Research Article|
May 23 2016
Retarding the breaching process of dikes
Dennis D. M. M. Lemmens;
Dennis D. M. M. Lemmens
Production Engineer
Engineering and Estimating Department, Van Oord Marine Ingenuity, Rotterdam, the Netherlands (corresponding author: dennis@dlemmens.nl)
Search for other works by this author on:
Rik Bisschop;
Rik Bisschop
Section Dredging Engineering, Faculty of Mechanical, Maritime and Materials Engineering and Faculty of Civil Engineering and Geosciences, Delft University of Technology, Delft, the Netherlands
Department of Hydraulic Engineering, Faculty of Civil Engineering and Geosciences, Delft University of Technology, Delft, the Netherlands
ARCADIS, Rotterdam, the Netherlands
Search for other works by this author on:
Paul J. Visser;
Paul J. Visser
Department of Hydraulic Engineering, Faculty of Civil Engineering and Geosciences, Delft University of Technology, Delft, the Netherlands
Search for other works by this author on:
Cees Van Rhee
Cees Van Rhee
Section Dredging Engineering, Faculty of Mechanical, Maritime and Materials Engineering and Faculty of Civil Engineering and Geosciences, Delft University of Technology, Delft, the Netherlands
Department of Hydraulic Engineering, Faculty of Civil Engineering and Geosciences, Delft University of Technology, Delft, the Netherlands
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
July 17 2015
Accepted:
April 07 2016
Online ISSN: 1751-7737
Print ISSN: 1741-7597
ICE Publishing: All rights reserved
2016
Maritime Engineering (2016) 169 (3): 99–114.
Article history
Received:
July 17 2015
Accepted:
April 07 2016
Citation
Lemmens DDMM, Bisschop R, Visser PJ, Van Rhee C (2016), "Retarding the breaching process of dikes". Maritime Engineering, Vol. 169 No. 3 pp. 99–114, doi: https://doi.org/10.1680/jmaen.2015.20
Download citation file:
Suggested Reading
Internal stability assessment of granular soils using the Kezdi and Sherard methods
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (June,2018)
Length scale of nonlocal gradient regularisation inferred from DEM virtual experiments
Geotechnique Letters (April,2025)
The undrained behaviour of clayey sands in triaxial compression and extension
Geotechnique (September,1990)
Initial motion of streambeds composed of coarse uniform sediments
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (December,2000)
Extension to the port of Gijón, Spain
Maritime Engineering (December,2008)
Related Chapters
STRESS-STRAIN RESPONSE AND FAILURE SURFACE OF HIGH STRENGTH CONCRETE UNDER GENERALIZED STATE OF STRESS
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
Failure Mode and Effect Analysis (FMEA)
Quality Management: Tools, Methods, and Standards
R&D Success in Pharmaceutical Markets: A Duration Model Approach
Health Econometrics
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.