The 176 m free-spanning dramatic roof structure of Heathrow's Terminal 5 main terminal building will undoubtedly become one of London's iconic buildings. This paper describes the various processes that the roof team used to ensure compliance and system integrity in order to guarantee that the 17 000 t structure could be built safely while negotiating one of the project's critical paths. The paper describes the engineering issues and how collaborative working contributed to achieving one of BAA's most successful sub-projects. The focus of the paper concentrates on the structure and describes how the design criteria set the fundamental requirements for the construction operations while the design of both permanent and temporary works was developed together. It details the rigorous review and approval processes and describes why risk assessment and compliance audit were crucial. The importance of the team structure and how this operated in conjunction with the lifting protocol to guarantee the success of critical operations is emphasised. It covers the development of the engineering procedure and how this was used to develop the hold points to control key stages. A full description of the construction engineering studies is provided to highlight the complexity and extent of preparation undertaken.
Article navigation
August 2007
Research Article|
August 01 2007
The delivery of the roof of Terminal 5 Available to Purchase
W. Frankland;
W. Frankland
Roof Team Leader
Laing O'Rourke/BAA
Dartford, UK
Search for other works by this author on:
J. N. Kitchener;
J. N. Kitchener
Chief Engineer
Laing O'Rourke/BAA
Dartford, UK
Search for other works by this author on:
T. Whitten;
T. Whitten
Director
Rowen Structures Ltd, Watson Steel Structures Ltd
Bolton, UK
Search for other works by this author on:
P. Hulme
P. Hulme
Contract Manager
Watson Steel Structures Ltd
Bolton, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
February 08 2007
Accepted:
October 16 2007
Online ISSN: 1751-4312
Print ISSN: 1751-4304
© 2007 Thomas Telford Ltd
2007
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (2007) 160 (3): 101–115.
Article history
Received:
February 08 2007
Accepted:
October 16 2007
Citation
Frankland W, Kitchener JN, Whitten T, Hulme P (2007), "The delivery of the roof of Terminal 5". Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, Vol. 160 No. 3 pp. 101–115, doi: https://doi.org/10.1680/mpal.2007.160.3.101
Download citation file:
Suggested Reading
Creating Heathrow's new eye in the sky
Proceedings of the Institution of Civil Engineers - Civil Engineering (May,2008)
T5A roof: the abutment first run study
Proceedings of the Institution of Civil Engineers - Structures and Buildings (April,2008)
The 4000 tonne lift of Stonecutters Bridge steel back-spans, H.K.
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2008)
Potential collapse of a roof structure averted by quick repair
Proceedings of the Institution of Civil Engineers - Forensic Engineering (November,2013)
Pre-deflecting a steel platform to support a new organ at Manchester Cathedral, UK
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (November,2021)
Related Chapters
Introduction
Inside London's Airports Policy: Indecision, decision and counter-decision
A brief overview of air-transport history
Inside London's Airports Policy: Indecision, decision and counter-decision
Airports policy up to the 1974 Maplin Review
Inside London's Airports Policy: Indecision, decision and counter-decision
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.