Compensation events can have significant consequences on project objectives. However, not much systematic research has been done on the occurrence of NEC compensation event in projects for the purpose of controlling and minimising their impact. The specific objectives of this study are to conduct a systematic review of literature on NEC compensation events and to conduct a systematic analysis of compensation events in four NEC-procured projects in South Africa to examine their extent, effects and sources. Publications mentioning ‘compensation events’ were reviewed based on papers by academic researchers, articles by practitioners in the NEC Users’ Group Newsletter and papers by construction lawyers published by the UK Society of Construction Law. The 84 publications demonstrate 15 operational aspects of compensation events. Thereafter the data on compensation events in four NEC-procured building projects in South Africa (the largest being £9 million) are analysed based on final accounts. The findings demonstrate a significant number of compensation events (165 altogether) with most arising from incomplete or late work information. Employers wishing to control and minimise compensation events on projects should be more decisive about their requirements and implement professional service agreements that incentivise members of the professional team to perform their role timelier and efficiently.
Article navigation
1 April 2016
Research Article|
February 17 2016
Compensation events in NEC3 contracts: case studies from South Africa Available to Purchase
Samuel Laryea, BSc (Hons), PhD, PGCAP, FHEA, MASAQS, MCIOB, MRICS, MSCLA, PrCPM
School of Construction Economics and Management, University of the Witwatrsrand, Johannesburg, South Africa
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
May 03 2015
Accepted:
December 23 2015
Online ISSN: 1751-4312
Print ISSN: 1751-4304
ICE Publishing: All rights reserved
2016
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (2016) 169 (2): 49–64.
Article history
Received:
May 03 2015
Accepted:
December 23 2015
Citation
Laryea S (2016), "Compensation events in NEC3 contracts: case studies from South Africa". Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, Vol. 169 No. 2 pp. 49–64, doi: https://doi.org/10.1680/jmapl.15.00014
Download citation file:
Suggested Reading
Developmental intervention impact on project environments
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (May,2012)
Engineering innovations in Canada’s public–private partnerships
Infrastructure Asset Management (July,2018)
Innovation in Australian publicly operated public–private partnerships
Infrastructure Asset Management (August,2018)
Empowering collaborative total asset management and inspiring innovations through Rivans
Infrastructure Asset Management (December,2018)
Design, procurement and coordination of the Ordsall Chord rail project, Manchester, UK
Proceedings of the Institution of Civil Engineers - Civil Engineering (September,2019)
Related Chapters
Early Contractor Involvement Models: Their Pros and Cons and When to Use Them
Early Contractor Involvement: Improving the Management of Contract Risk
Public Procurement Process
Early Contractor Involvement: Improving the Management of Contract Risk
Managing Costs Escalation on a Cost Reimbursable Contract
Early Contractor Involvement: Improving the Management of Contract Risk
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.