Public–private partnerships (PPPs) have long been touted as an innovative project delivery method that encourages technological innovation and chases delivery efficiency. However, literature based on European PPP practices seems to provide conflicting evidence. To help better understand and further improve this prevailing delivery method, this study collected and analysed empirical evidence of engineering innovations that have been successfully used in existing PPP projects in Canada. Drawing on literature review and an intensive interview programme involving 19 interviewees from 15 successful PPP projects, the study answered the what, who, when, why and how questions about innovation in PPPs. The study concluded that the PPP delivery system does provide unique innovation opportunities and scope that traditional delivery models cannot support. Performance-based output specifications, vertical integration and communication are the three key areas for improvements to enhance innovation in PPPs further.
Article navigation
20 September 2019
Research Article|
July 26 2018
Engineering innovations in Canada’s public–private partnerships
Xian-Xun Yuan, BASc, MASc, PhD, PEng;
Department of Civil Engineering
Ryerson Institute for Infrastructure Innovation, Ryerson University, Toronto, ON, Canada
(corresponding author: arnold.yuan@ryerson.ca)
Search for other works by this author on:
Jing Zhang, BSc, MASc
Jing Zhang, BSc, MASc
PhD Candidate
Department of Civil Engineering and Ryerson Institute for Infrastructure Innovation, Ryerson University, Toronto, ON, Canada
Search for other works by this author on:
(corresponding author: arnold.yuan@ryerson.ca)
Publisher: Emerald Publishing
Received:
November 26 2017
Accepted:
June 28 2018
Online ISSN: 2053-0250
Print ISSN: 2053-0242
ICE Publishing: All rights reserved
2019
Infrastructure Asset Management (2019) 6 (3): 178–184.
Article history
Received:
November 26 2017
Accepted:
June 28 2018
Citation
Yuan X, Zhang J (2019), "Engineering innovations in Canada’s public–private partnerships". Infrastructure Asset Management, Vol. 6 No. 3 pp. 178–184, doi: https://doi.org/10.1680/jinam.17.00039
Download citation file:
New and popular articles
Suggested Reading
The concept of partnering in public–private partnership projects in the United Arab Emirates
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (October,2015)
Innovation in Australian publicly operated public–private partnerships
Infrastructure Asset Management (August,2018)
Critical success factors in a public–private partnership highway project in Malaysia: Ampang–Kuala Lumpur Elevated Highway
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (January,2018)
Collaborative procurement strategies for infrastructure projects: a multiple-case study
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (August,2019)
Ten years of PPP in Germany: experiences and perspectives
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (August,2014)
Related Chapters
Early Contractor Involvement Models: Their Pros and Cons and When to Use Them
Early Contractor Involvement: Improving the Management of Contract Risk
Public Procurement Process
Early Contractor Involvement: Improving the Management of Contract Risk
Managing Costs Escalation on a Cost Reimbursable Contract
Early Contractor Involvement: Improving the Management of Contract Risk
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
