The UK government chose an unusual contract structure for the procurement of their programmes of civil nuclear power projects. British manufacturing and construction companies were invited to form consortia to compete for ‘turnkey’ contracts to design and supply complete power stations. The government continued with this structure until late in their second programme of projects. The results met the objective of national independence in power supply, but at a cost. This paper reviews the structure used in the UK, its evolution through two programmes of projects and lessons to be learned for new projects. The paper draws on published material, official papers, private records and reports from other countries. The most important lessons are that project sponsors should give rigorous attention to the choice of contract structure when initiating such major projects and that the structures open to them are not unique to their industry.
Article navigation
17 July 2017
Research Article|
July 17 2017
Contract structure for nuclear power projects
Raymond Bird, BSc (Tech), AMCT, CEng, FIMechE;
Raymond Bird, BSc (Tech), AMCT, CEng, FIMechE
Formerly Chief Engineer (Performance), Chief Engineer
GEC/Simon-Carves Atomic Energy Group, Erith, UK
GEC (Japan) Ltd, Tokyo, Japan
Search for other works by this author on:
Stephen Wearne, BSc (Eng), DIC, PhD, CEng, FICE, FIMechE, HonFAPM
Formerly Reactor Engineering Coordinator and Project Engineer, Visiting Professor
GEC/Simon Carves Atomic Energy Group, Erith, UK
School of Mechanical, Aerospace and Civil Engineering, University of Manchester, Manchester, UK
(corresponding author: wearne@manchester.ac.uk)
Search for other works by this author on:
(corresponding author: wearne@manchester.ac.uk)
Publisher: Emerald Publishing
Received:
November 08 2016
Accepted:
May 17 2017
Online ISSN: 1751-4312
Print ISSN: 1751-4304
ICE Publishing: All rights reserved
2017
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (2017) 170 (3): 131–137.
Article history
Received:
November 08 2016
Accepted:
May 17 2017
Citation
Bird R, Wearne S (2017), "Contract structure for nuclear power projects". Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, Vol. 170 No. 3 pp. 131–137, doi: https://doi.org/10.1680/jmapl.16.00042
Download citation file:
Suggested Reading
Channel Tunnel Rail Link: a contract partnership
Proceedings of the Institution of Civil Engineers - Civil Engineering (May,2003)
Nuclear decommissioning contracts: the legal and commercial issues
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (April,2013)
The 2011 Great East Japan earthquake, tsunami and nuclear disaster
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2013)
Civil engineering management in the Industrial Revolution
Proceedings of the Institution of Civil Engineers - Civil Engineering (August,2000)
Building the British Airways London Eye
Proceedings of the Institution of Civil Engineers - Civil Engineering (May,2001)
Related Chapters
Energy
The Sustainable Nation: Politics, Economy and Justice
PERFORMANCE OF CONCRETE STRUCTURES FOR NUCLEAR REPROCESSING PLANT – REVIEW OF CURRENT RESEARCH AND FUTURE REQUIREMENTS
Role of Concrete in Nuclear Facilities
Sourcing from Multinational Suppliers to Overcome Weak Contracting Institutions and Gain Supply Chain Capabilities
Geography, Location, and Strategy
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.