Delivering a road infrastructure megaproject is complex and requires engagement with multiple stakeholders. Stakeholder engagement is an essential part of the management process, particularly in megaprojects, helping to manage what can be complex stakeholder relationships. The alliance procurement approach has been acknowledged as a platform that can provide a collaborative way of managing such stakeholder complexity. This paper uses a road infrastructure alliance case study in New Zealand to investigate the adopted features embedded in an alliance model in managing stakeholders throughout the interim project alliance agreement phase. The research draws information from stakeholder engagement reports, project documentation, newsletter articles, public engagement reports, transportation agency reports and interviews from the case study. The findings provide valuable insights into how the features of a project alliance (i.e. project governance and commercial model) formulate an effective approach (i.e. building a culture of care, communicating beyond compliance and responsiveness) to the management of multiple stakeholders during the planning and consenting phase. The paper provides a point of reference for construction organisations to help develop a best practice through collaborative contracting for successfully managing stakeholder complexity in future construction megaprojects.
Article navigation
13 September 2017
Research Article|
August 01 2017
Managing stakeholders through alliances: a case study of a megaproject in New Zealand
Har Einur Azrin Baharuddin, MSc;
Har Einur Azrin Baharuddin, MSc
Senior Lecturer
Faculty of Architecture, Planning and Surveying, Universiti Teknologi Mara, Shah Alam, Malaysia
Search for other works by this author on:
Che Khairil Izam Che Ibrahim, PhD
;
Faculty of Civil Engineering, Universiti Teknologi Mara, Shah Alam, Malaysia
(corresponding author: chekhairil449@salam.uitm.edu.my; cche365@aucklanduni.ac.nz)
Search for other works by this author on:
Seosamh B Costello, PhD
;
Seosamh B Costello, PhD
Associate Professor
Department of Civil and Environmental Engineering, The University of Auckland, Auckland, New Zealand
Search for other works by this author on:
Suzanne Wilkinson, PhD
Suzanne Wilkinson, PhD
Professor
Department of Civil and Environmental Engineering, The University of Auckland, Auckland, New Zealand
Search for other works by this author on:
(corresponding author: chekhairil449@salam.uitm.edu.my; cche365@aucklanduni.ac.nz)
Publisher: Emerald Publishing
Received:
January 30 2017
Accepted:
June 19 2017
Online ISSN: 1751-4312
Print ISSN: 1751-4304
ICE Publishing: All rights reserved
2017
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (2017) 170 (4): 151–160.
Article history
Received:
January 30 2017
Accepted:
June 19 2017
Citation
Baharuddin HEA, Che Ibrahim CKI, Costello SB, Wilkinson S (2017), "Managing stakeholders through alliances: a case study of a megaproject in New Zealand". Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, Vol. 170 No. 4 pp. 151–160, doi: https://doi.org/10.1680/jmapl.17.00004
Download citation file:
New and popular articles
Suggested Reading
Developmental intervention impact on project environments
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (May,2012)
Sustaining supply chains
Infrastructure Asset Management (March,2016)
Increasing ‘local content’ in infrastructure procurement. Part 2
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (May,2010)
Increasing ‘local content’ in infrastructure procurement. Part 1
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (May,2010)
Culture in sustainable infrastructure: the polycentric cultural framework model
Proceedings of the Institution of Civil Engineers - Municipal Engineer (March,2012)
Related Chapters
Early Contractor Involvement Models: Their Pros and Cons and When to Use Them
Early Contractor Involvement: Improving the Management of Contract Risk
Public Procurement Process
Early Contractor Involvement: Improving the Management of Contract Risk
Managing Costs Escalation on a Cost Reimbursable Contract
Early Contractor Involvement: Improving the Management of Contract Risk
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.