The use of pre-construction services (PCS), or early contractor involvement, has become common internationally due to its various advantages to complex construction projects. However, determining the optimal timing for engaging PCS remains an open question for researchers and government organisations. This paper develops a methodology to report on the successful timing of PCS use in New Zealand, aiding the industry in deciding when to engage a contractor for PCS appropriately. Proper timing can help avoid costly pitfalls from engaging PCS too early or too late, and this approach could be extended internationally. Data collection involved two rounds: an online survey to determine complexity factor weighting and semi-structured interviews on 29 case study projects to refine a visualisation tool. Each project was given a complexity ranking based on semi-structured interview data. The results indicate a relationship between PCS timing, project complexity, and scale. However, PCS is not always related to the procurement method; for example, design–bid–build projects can still benefit from PCS through fair risk allocation. The findings can assist clients in determining the best time to engage PCS, independent of the procurement model, thereby maximising the value contractors bring to construction projects.
Article navigation
October 2024
Research Article|
November 15 2024
A tool for reporting the optimal timing of pre-construction services in New Zealand
Paul Stephanus Botha, ME;
Paul Stephanus Botha, ME
PhD student, Department of Civil and Natural Resources, University of Canterbury, Christchurch, New Zealand (corresponding author: botha.s.paul@gmail.com)
Search for other works by this author on:
Jacobus Daniel van der Walt, PhD;
Jacobus Daniel van der Walt, PhD
Senior Lecturer, Department of Civil and Natural Resources, University of Canterbury, Christchurch, New Zealand
Search for other works by this author on:
Eric Scheepbouwer, PhD;
Eric Scheepbouwer, PhD
Associate Professor, Department of Civil and Natural Resources, University of Canterbury, Christchurch, New Zealand
Search for other works by this author on:
Philip J Barutha, PhD
Philip J Barutha, PhD
Associate Teaching Professor, Department of Civil and Environmental Engineering and Earth Sciences, College of Engineering, University of Notre Dame, Notre Dame, IN, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
June 05 2023
Accepted:
April 30 2024
Online ISSN: 1751-4312
Print ISSN: 1751-4304
Emerald Publishing Limited: All rights reserved
2024
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (2024) 177 (4): 240–252.
Article history
Received:
June 05 2023
Accepted:
April 30 2024
Citation
Botha PS, van der Walt JD, Scheepbouwer E, Barutha PJ (2024), "A tool for reporting the optimal timing of pre-construction services in New Zealand". Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, Vol. 177 No. 4 pp. 240–252, doi: https://doi.org/10.1680/jmapl.23.00012
Download citation file:
Suggested Reading
Early contractor involvement: a review of pre-construction service agreements
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (January,2021)
Bibliometrics and visualisation of research on trust in construction projects
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (May,2020)
Modelling knowledge integration process in early contractor involvement procurement at tender stage – a Western Australian case study
Construction Innovation: Information Process Management (September,2017)
Independence and impartiality of contract administrators in the New Zealand construction sector
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (June,2022)
A multivariate delay estimation model proposal for public construction projects
Proceedings of the Institution of Civil Engineers - Municipal Engineer (February,2019)
Related Chapters
Shadow Project Management: Using the Project Management Body of Knowledge to Informally Manage Library Projects
Project Management in the Library Workplace
Risk Management: A Measure of Project Success
Measures of Sustainable Construction Projects Performance
Governed by Municipal Land Allocations: Implications for Housing Developers
10th Nordic Conference on Construction Economics and Organization
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.