Discussion|
January 01 1846
DISCUSSION. ACCOUNT OF THE WORKS, LATELY CONSTRUCTED, FOR IMPROVING THE NAVIGATION OF THE RIVER SEVERN, WITH THEIR EFFECT IN DISCHARGING THE FLOOD WATERS. (ABSTRACT).
Publisher: Emerald Publishing
Online ISSN: 2054-0477
Print ISSN: 1753-7843
© Thomas Telford and ICE
1846
Minutes of the Proceedings of the Institution of Civil Engineers (1846) 5 (1846): 348–361.
- Standard View
- Views Icon Views Open Menu
- Open the PDF for DISCUSSION. ACCOUNT OF THE WORKS, LATELY CONSTRUCTED, FOR IMPROVING THE NAVIGATION OF THE RIVER SEVERN, WITH THEIR EFFECT IN DISCHARGING THE FLOOD WATERS. (ABSTRACT). in another window
- Share Icon Share
-
Tools Icon
Tools
Open Menu
- Cite Open Menu
- Search Site
- EPUB | PDF
Citation
CUBITT W, BATEMAN JF, STEPHENSON R, BRUNEL IK, FAIRBAIRN W, THOMSON J, BIDDER GP, WILLIAMS EL, FAREY J, RUSSELL JS, GRAVATT W, GRANTHAM RB (1846), "DISCUSSION. ACCOUNT OF THE WORKS, LATELY CONSTRUCTED, FOR IMPROVING THE NAVIGATION OF THE RIVER SEVERN, WITH THEIR EFFECT IN DISCHARGING THE FLOOD WATERS. (ABSTRACT).". Minutes of the Proceedings of the Institution of Civil Engineers, Vol. 5 No. 1846 pp. 348–361, doi: https://doi.org/10.1680/imotp.1846.24321
Download citation file:
