Article navigation
Discussion|
January 01 1844
DISCUSSION. THE PILING MACHINE USED AT THE MONTROSE HARBOUR WORKS.
Publisher: Emerald Publishing
Online ISSN: 2054-0477
Print ISSN: 1753-7843
© Thomas Telford and ICE
1844
Minutes of the Proceedings of the Institution of Civil Engineers (1844) 3 (1844): 200–201.
Citation
MILNE J, RENDEL JM, GILES F, CUBITT W, GREEN J, HARTLEY JB, CLARK, CLARKE T, VIGNOLES CB, RENNIE G (1844), "DISCUSSION. THE PILING MACHINE USED AT THE MONTROSE HARBOUR WORKS.". Minutes of the Proceedings of the Institution of Civil Engineers, Vol. 3 No. 1844 pp. 200–201, doi: https://doi.org/10.1680/imotp.1844.24541
Download citation file:
Suggested Reading
DESCRIPTION OF THE PILING MACHINE USED AT THE MONTROSE HARBOUR WORKS.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1844)
ON FORMULAS FOR PILE-DRIVING.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1894)
RIVER WITHAM DRAINAGE: PUMPING MACHINERY AND WORKS AT LADE BANK. (INCLUDES PLATES AND APPENDIX).
Minutes of the Proceedings of the Institution of Civil Engineers (January,1872)
TEMPORARY WORKS AND PLANT AT THE PORTSMOUTH DOCKYARD EXTENSION. (INCLUDING APPENDIX AND PLATE AT BACK OF VOLUME).
Minutes of the Proceedings of the Institution of Civil Engineers (January,1881)
THE DUGALD CLERK LECTURE, 1948. PUMPING MACHINERY. (INCLUDES PHOTOGRAPHS).
Journal of the Institution of Civil Engineers (February,1949)
Related Chapters
Bearing piles
Temporary Works: Principles of Design and Construction
Types of bearing piles
ICE Manual of Geotechnical Engineering, Volume II: Geotechnical design, construction and verification
Types of berth structures
Port Designer's Handbook
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
