DISCUSSION. THE METHOD EMPLOYED FOR DRAINING SOME BANKS OF CUTTINGS ON THE LONDON AND CROYDON, AND LONDON AND BIRMINGHAM RAILWAYS; AND A PART OF THE RETAINING WALL OF THE EUSTON INCLINE, LONDON AND BIRMINGHAM RAILWAY. Free
Publisher: Emerald Publishing
Online ISSN: 2054-0477
Print ISSN: 1753-7843
© Thomas Telford and ICE
1845
Minutes of the Proceedings of the Institution of Civil Engineers (1845) 4 (1845): 82–86.
- Split-Screen
- Views Icon Views Open Menu
- Open the PDF for DISCUSSION. THE METHOD EMPLOYED FOR DRAINING SOME BANKS OF CUTTINGS ON THE LONDON AND CROYDON, AND LONDON AND BIRMINGHAM RAILWAYS; AND A PART OF THE RETAINING WALL OF THE EUSTON INCLINE, LONDON AND BIRMINGHAM RAILWAY. in another window
- Share Icon Share
-
Tools Icon
Tools
Open Menu
- Cite Open Menu
- Search Site
- EPUB | PDF
Citation
DOCKRAY RB, STEPHENSON R, RENNIE SJ (1845), "DISCUSSION. THE METHOD EMPLOYED FOR DRAINING SOME BANKS OF CUTTINGS ON THE LONDON AND CROYDON, AND LONDON AND BIRMINGHAM RAILWAYS; AND A PART OF THE RETAINING WALL OF THE EUSTON INCLINE, LONDON AND BIRMINGHAM RAILWAY. ". Minutes of the Proceedings of the Institution of Civil Engineers, Vol. 4 No. 1845 pp. 82–86, doi: https://doi.org/10.1680/imotp.1845.24359
Download citation file:
Suggested Reading
DESCRIPTION OF THE METHOD EMPLOYED FOR DRAINING SOME BANKS OF CUTTINGS ON THE LONDON AND CROYDON, AND LONDON AND BIRMINGHAM RAILWAYS; AND A PART OF THE RETAINING WALL OF THE EUSTON INCLINE, LONDON AND BIRMINGHAM RAILWAY.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1845)
DISCUSSION. RAILWAY CUTTINGS AND EMBANKMENTS; WITH AN ACCOUNT OF SOME SLIPS IN THE LONDON CLAY, ON THE LINE OF THE LONDON AND CROYDON RAILWAY.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1844)
NOTES ON THE CONSOLIDATION OF EARTHWORKS.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1875)
ON THE INTRODUCTION OF CONSTRUCTIONS TO RETAIN THE SIDES OF DEEP CUTTINGS, IN CLAYS OR OTHER UNCERTAIN SOILS.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1844)
DISCUSSION. THE INTRODUCTION OF CONSTRUCTIONS TO RETAIN THE SIDES OF DEEP CUTTINGS IN CLAYS, OR OTHER UNCERTAIN SOILS.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1844)
Related Chapters
Railway Earthworks: Design and Performance
Sustainable Railway Engineering and Operations
Soil conditioning for EPB tunnelling: some examples of laboratory testing and field monitoring
Crossrail Project: Infrastructure design and construction
C300 Western Running Tunnels and caverns project - TBM shield burial and backup removal
Crossrail Project: Infrastructure design and construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.