Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-9 of 9
Keywords: DIAPHRAGM
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1931) 232 (1931): 183–219.
Published: 01 January 1931
...P ALLAN RIVERS BRIDGES BORING ROCKS REINFORCED CONCRETE PIERS CYLINDERS TRUSSES SPANS REINFORCEMENT DIAPHRAGM PILES HEADS RINGS DRIVING TRAMS TRAMWAYS TRAMCARS CARS LOADS LIVE DEAD PORTAL BRACING SWAY BRACES GIRDERS STRINGERS BEARINGS DECKS COSTS LAITANCE...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1921) 211 (1921): 329–334.
Published: 01 January 1921
...G ELLSON; E BENEDICT; A ROSS; T B GRIERSON; W H THORPE; J S WILSON © Thomas Telford and ICE 1921 BRIDGES STRENGTHENING RECONSTRUCTION VIADUCTS RAILWAYS COSTS GIRDERS DEFLECTION MEASUREMENT DIAPHRAGM PILES LOADS RIVETS CANNON STREET LONDON RIVER THAMES UK...
Journal Articles
B H BLYTH, F SHELFORD, J M MONCRIEFF, C H COOPER, H C REID, W C UNWIN, E G COKER, J S WILSON, C S MEIK, W B TRIPP, J W WILSON, M F WILSON, A ROSS, A L BELL, F E W SHEILDS
Minutes of the Proceedings of the Institution of Civil Engineers (1915) 199 (1915): 273–304.
Published: 01 January 1915
..., and consequently the diaphragm,which must move in order to give a measure a t all on the pressure-gauge, moved sufficiently to reduce that lateral thrust of the clay. In trying to devise an instrument for his own use it seemed to him that the motion of the diaphragm, orwhateverthelateralthrust was exertedupon,must...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1914) 197 (1914): 243–263.
Published: 01 January 1914
...H GASKELL DIAPHRAGM METHODS MEASURING VELOCITY FLOW FLUIDS PIPES HYDROLOGY MEASUREMENT THEORY FORMULAE LIQUIDS GAS POSITIONS PRESSURE HOLES RADIAL LONGITUDINAL VALUE CONSTANTS VENTURI METERS INSTRUMENTATION APPARATUS EXPERIMENTS APPROXIMATE © Thomas Telford and ICE...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1900) 142 (1900): 243–252.
Published: 01 January 1900
..., one or more diaphragms, a t right-angles to the direc- tion of the slip, sunk low enough to intercept the underground water, with outlet drainsat right angles, running to the valley on the steepest possible gradient, were found very effective. Such a work is illustrated in Figs. 1-5...
Journal Articles
SIR B BAKER, C G MOTT, C BARLOW, R WILLIAMS, S J WILDE, M FITZMAURICE, A R BINNIE, W B LEWIS, W SEWELL, E W MOIR, J W BARRY, G F DEACON, J H GREATHEAD
Minutes of the Proceedings of the Institution of Civil Engineers (1896) 123 (1896): 74–111.
Published: 01 January 1896
... COMPRESSED AIR COSTS EXCAVATIONS LININGS GROUTING DISEASES RIVERS AQUEDUCTS UNDERWATER SUBAQUEOUS CAST IRON FLANGES COMPRESSORS LOADS DRIVING SHIELD DRIVEN DIAPHRAGM LONDON ENGLAND VYRNWY MERSEY CITY RAILWAY UK 74 DISCUSSION ON CITY A N D S O ~ T HLONDOR RAILWAY...
Journal Articles
A MURRAY, FARADAY, T H BOUTIGNY, J GLYNN, W G ARMSTRONG, A GORDON, R STEPHENSON, I K BRUNEL, C MAY, C W WILLIAMS, J S RUSSELL, R HUNT, T H BOUTIGNY, HAWKSLEY, G P BIDDER
Minutes of the Proceedings of the Institution of Civil Engineers (1852) 11 (1852): 397–406.
Published: 01 January 1852
... DIAPHRAGM CONSUMPTION TUBULAR EXPLOSIONS ENGINES HEAT TEMPERATURE GENERATORS GAS FLUES LOCOMOTIVES STEhM ROILERS. 397 wants of those who require a motive power, but whose premises are generallyilladapted to a f h d t h e necessary spacefor a steam boileroftheordinaryconstruction. T h e...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1852) 11 (1852): 392–397.
Published: 01 January 1852
...T H BOUTIGNY © Thomas Telford and ICE 1852 BOILERS DIAPHRAGM STEAM GENERATORS WORKING EVAPORATION WATER CALORIC 39% ULAPHKAUM BOILEK. these boilers, those uponwhich they were designed,and which experience has established to be true, are-- 1st. Thatmarine boilers, judiciouslymade...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1848) 7 (1848): 416–417.
Published: 01 January 1848
...T LAMBERT © Thomas Telford and ICE 1848 VALVES WATER FLEXIBLE DIAPHRAGM 416 LAMBERT S FLEXIBLE DIAPHRAGM W.4TER-VALVES. formswerewell, or ill adaptedto resist the forces to whichthey were opposed. I f a form like that of the Chesil Bank was adopted at Dover, the workwouldnever...
