Discusses the relationships between finite schedulers which operate on output from a higher level in a conventional MRPII system, and so‐called stand‐alone schedulers which essentially operate directly on orders. Presents two graphical models – a demand flow model and a flowpipe model – which help to explain the differences between such schedulers and are used to illustrate the key features of each. Coupled schedulers tend to work on demand which has already been smoothed or planned in some way and can be described as planning‐led,whereas stand‐alone schedulers work from unfiltered data, with the operator reacting to schedule quality (due‐date performance, resource activation levels, etc.) and thence adjusting resource and rerunning. Ascribes the growth of the stand‐alone scheduler, at least in part, to the greatly increased computing power available quite inexpensively on modern equipment.
Article navigation
1 February 1995
This article was originally published in
Integrated Manufacturing Systems
Technical Paper|
February 01 1995
MRPII and stand‐alone finite schedulers: the relationships
David Little;
David Little
Senior Lecturer in Manufacturing Systems at the University of Liverpool, UK.
Search for other works by this author on:
Keith Porter;
Keith Porter
Senior Lecturer at Liverpool, John Moores University, UK.
Search for other works by this author on:
Peter C. Jarvis;
Peter C. Jarvis
PhD candidate and member of the Short‐term Scheduling Project Team at the University of Liverpool, UK.
Search for other works by this author on:
John G. Kenworthy
John G. Kenworthy
Manufacturing Control Systems Consultant and Visiting Professor in Industrial Studies at the University of Liverpool, UK.
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-583X
Print ISSN: 0957-6061
© MCB UP Limited
1995
Integrated Manufacturing Systems (1995) 6 (1): 22–26.
Citation
Little D, Porter K, Jarvis PC, Kenworthy JG (1995), "MRPII and stand‐alone finite schedulers: the relationships". Integrated Manufacturing Systems, Vol. 6 No. 1 pp. 22–26, doi: https://doi.org/10.1108/09576069510076135
Download citation file:
132
Views
New and popular articles
Suggested Reading
Enterprise management‐ the logical integration of the supply chain
Logistics Information Management (April,1996)
Advanced scheduling with genetic algorithms in supply networks
Journal of Manufacturing Technology Management (July,2011)
Knowledgebase manufacturing The leading edge in manufacturing business systems
Assembly Automation (December,1994)
MRPII, real‐time scheduling and SBM
Assembly Automation (June,1994)
Achieving MRPII Class A status in an SME ‐ A successful case study
Benchmarking: An International Journal (March,2001)
Related Chapters
Predicting the Performance of a Two-Stage Flowshop: Lower Bounds and Heuristics for Single and Bicriteria Measures
Advances in Business and Management Forecasting
Chapter 5 The different phases in construction – design in health and safety to the project life cycle
ICE manual of health and safety in construction
Chapter 6 Establishing operational control processes
ICE manual of health and safety in construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.