Minimising makespan aims to achieve high utilisation of equipment and resources by getting all jobs out quickly. This is an important scheduling criterion, especially for automated systems, because of the high investment cost. The problem, however, becomes complex when many parts and machines are involved. This is because different parts may require different numbers of operations, and there are many possible schedules. For small problems, a mathematical programming model for minimising makespan is formulated. For large problems, a sequencing algorithm based on decomposition and pairwise comparison is proposed. The idea of “total overlapping time” in the sequencing algorithm is introduced to determine the solution of each sub‐schedule. It maximises the number of jobs working at different machines at the same time, while satisfying the parts’ operation precedence and machine constraints. The differences between this method and the traditional graphical method are discussed. The sequencing algorithm significantly reduces the number of schedules for consideration and hence, the computational power required.
Article navigation
1 February 2000
This article was originally published in
Integrated Manufacturing Systems
Technical Paper|
February 01 2000
A sequence algorithm for minimising makespan in multi‐part and multi‐machine flowshop cases
Shiu Hong Choi;
Shiu Hong Choi
Department of Industrial and Manufacturing Systems Engineering, The University of Hong Kong, Hong Kong
Search for other works by this author on:
James Siu Lung Lee
James Siu Lung Lee
Department of Industrial and Manufacturing Systems Engineering, The University of Hong Kong, Hong Kong
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-583X
Print ISSN: 0957-6061
© MCB UP Limited
2000
Integrated Manufacturing Systems (2000) 11 (1): 62–73.
Citation
Hong Choi S, Siu Lung Lee J (2000), "A sequence algorithm for minimising makespan in multi‐part and multi‐machine flowshop cases". Integrated Manufacturing Systems, Vol. 11 No. 1 pp. 62–73, doi: https://doi.org/10.1108/09576060010303677
Download citation file:
159
Views
New and popular articles
Suggested Reading
Investigation of an additional part to optimal schedule
Integrated Manufacturing Systems (June,1998)
A load-balanced hybrid heuristic for allocation of batch of tasks in cloud computing environment
International Journal of Pervasive Computing and Communications (October,2022)
Makespan distributions in flow shop scheduling
International Journal of Operations & Production Management (March,1995)
Flexibility and responsiveness of machining environments
Integrated Manufacturing Systems (August,1998)
Network‐based project planning and scheduling
Industrial Management & Data Systems (December,1996)
Related Chapters
A multiple objective approach to assigning classes for an executive MBA program
Applications of Management Science
Reexamining the Relationship Between Flexibility and Insecurity
Comparing European Workers Part A
Chinese Tourists and the Sun: Implications for Designing Experiences
Delivering Tourism Intelligence: From Analysis to Action
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.