This study was carried out to identify the social impact of losing transport links within a community, and the practices of coordination and communication during and after an extreme adverse event. In November 2009, Workington, Cumbria had most of its bridges either damaged or destroyed during a major flood. The effects of the disaster were immediate, while the subsequent planning and recovery process took time. Over 3 years, Cumbria County Council (CCC) went through a coordinated process of installing temporary infrastructure, building and repairing Workington's bridges. A desk-based investigation of the disaster and the recovery process using websites and the local press demonstrates a coordinated approach to replace Workington's infrastructure and the importance of communication in the town's recovery. CCC, through a series of practical measures, reduced disruption within the community in stages. The reconstruction of the town's bridges involved communication and public consultation about the new infrastructure. The CCC explained the design, financial and engineering elements of the bridges to the public with some success. The research found that the loss of each bridge had significant social impacts, and the coordinated actions and communication of CCC helped the community understand and, importantly, accept that reconstruction would not be immediate.
Article navigation
June 2016
Research Article|
September 16 2015
Workington: a case study in coordination and communication
Arthur Affleck, PhD;
Arthur Affleck, PhD
Research Associate
i-BUILD, Newcastle University, NUBS, Newcastle upon Tyne, UK
Search for other works by this author on:
Jane Gibbon, PhD
Jane Gibbon, PhD
Senior Lecturer in Accounting
Newcastle University Business School, Newcastle upon Tyne, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
December 19 2014
Accepted:
July 22 2015
Online ISSN: 1751-7699
Print ISSN: 0965-0903
© Published with permission by the ICE under the CC-BY license. (http://creativecommons.org/licenses/by/4.0/)
2015
Proceedings of the Institution of Civil Engineers - Municipal Engineer (2016) 169 (2): 109–117.
Article history
Received:
December 19 2014
Accepted:
July 22 2015
Citation
Affleck A, Gibbon J (2016), "Workington: a case study in coordination and communication". Proceedings of the Institution of Civil Engineers - Municipal Engineer, Vol. 169 No. 2 pp. 109–117, doi: https://doi.org/10.1680/jmuen.15.00004
Download citation file:
New and popular articles
Suggested Reading
Urban designing in heterogeneous cities: issues and responses
Proceedings of the Institution of Civil Engineers - Urban Design and Planning (October,2015)
The fate of medieval English bridges since 1770: demolition, survival and preservation
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (February,2013)
Gender mainstreaming in the Nepalese rural transport sector: working towards transformative change
Proceedings of the Institution of Civil Engineers - Transport (November,2019)
Bridge-building in Malawi: a student expedition
Proceedings of the Institution of Civil Engineers - Municipal Engineer (September,2008)
Jiangyin Yangtze River Bridge, China
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
Related Chapters
Assessing the Social Impact of an American Liberal Arts University: Implications and Challenges in the Post-conflict Society of Iraqi Kurdistan
Education and Sustainable Development in the Context of Crises: International Case Studies of Transformational Change
Introduction
Innovation in Responsible Management Education: Preparing the Changemakers of Tomorrow
Innovation and Social Impact in Responsible Management Education
Innovation in Responsible Management Education: Preparing the Changemakers of Tomorrow
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.