Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: BOLLARDS
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
THE DESIGN AND CONSTRUCTION OF THE OCEAN TERMINAL, HONG KONG.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1970) 46 (3): 293–310.
Published: 01 July 1970
... PLANNING PIERS CYLINDERS TRANSIT FACILITIES SHOPPING CENTRES CENTRES SHOPPING TESTS DRIVING PUMP ROOMS BOLLARDS OCEANS REINFORCED SUPERSTRUCTURES DECKS OFFICES PASSENGERS CAR PARKS PILES FOUNDATIONS GANGWAYS SERVICES SEA HONG KONG KONG KONG ASIA 7301 The design...
Journal Articles
ABSTRACT. FLOATING RESILIENT PLATFORM TERMINAL FOR LOADING AND UNLOADING OF LARGE OIL TANKERS OFF-SHORE.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1970) 45 (1): 125–130.
Published: 01 January 1970
... sufficient distance for both main moorings and slewing moorings to have dipped down towards the sea bed, as shown in Fig.2, by the necessary amount toclear the keels of the large tankers moored alongside; the dipis accentuated by heavy clumpsfixed to the moorings. Fenders, bollards, buffer tankage and other...
Journal Articles
Proceedings of the Institution of Civil Engineers (1955) 4 (5): 587–600.
Published: 01 October 1955
... SHEETPILING BOLLARDS DESIGN KINGS LYNN UK BUCK ON RECONSTRUCTIONOF TWO QUAYS ,AT KING S LYNN 587 ( e ) Forty-one Prestcore piles were completed in 4 weeks using four rigs. The Paper, which was received on the 5t.h January, 1955, is accompanied by eight sheets of drawings from which...
Journal Articles
MARITIME PAPER. OIL LOADING AND CARGO HANDLING FACILITIES AT MINA AL-AHMADI, PERSIAN GULF. PART I : PLANNING & DESIGN. PART II : CONSTRUCTION.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1952) 1 (3): 249–300.
Published: 01 May 1952
... to adjacentsides of the gap andare free to buckle as thegap closes. Lateral movement of the oil pier caused by berthing impactand bollard pull is provided for by allowing the stringers of the last approach-pier bay to slide in and out between those of the next bent. Continuity a t decklevel is provided...
