The aim of this research is to determine the optimal upgrade and preventive maintenance actions that minimize the total expected cost (maintenance costs+penalty costs).

Design/methodology/approach

The problem is a four‐parameter optimization with two parameters being k‐dimensional. The optimal solution is obtained by using a four‐stage approach where at each stage a one‐parameter optimization is solved.

Findings

Upgrading action is an extra option before the lease of used equipment, in addition to preventive maintenance action. Upgrading action makes equipment younger and preventive maintenance action lowers the ROCOF.

Practical implications

There is a growing trend towards leasing equipment rather than owning it. The lease contract contains penalties if the equipment fails often and repairs are done within reasonable time period. This implies that the lessor needs to look at optimal preventive maintenance strategies in the case of new equipment lease, and upgrade actions plus preventive maintenance in the case of used equipment lease. The paper deals with this topic and is of great significant to business involved with leasing equipment.

Originality/value

Nowadays many organizations are interested in leasing equipment and outsourcing maintenance. The model in this paper addresses the preventive maintenance problem for leased equipment. It provides an approach to dealing with this problem.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal