The purpose of this paper is to properly plan the preventive maintenance schedule for multiple elevators and optimize the number of maintenance workers.The total amount of the maintenance cost consisting of the labor cost, the part cost, and the quality cost (the loss evaluated in terms of cost, to be incurred when an elevator breaks down) is to be minimized.The method is presented of setting up the optimal preventive maintenance schedule on a long‐term basis by rescheduling the contents of schedule dynamically and flexibly in accordance with the ever‐changing maintenance conditions, taking the possibility of the future occurrence of failure into consideration. From numerical experiments, the validity of the proposal procedure for planning the preventive maintenance schedule and the effectiveness of considering the possibility of the future occurrence of failure in planning the schedule are shown, and the optimal number of maintenance workers can be decided.
Article navigation
1 June 2001
Research Article|
June 01 2001
Optimal preventive maintenance planning for multiple elevators
Hajime Yamashina;
Hajime Yamashina
Kyoto University, Kyoto, Japan
Search for other works by this author on:
Shunsuke Otani
Shunsuke Otani
Fujitec Co. Ltd, Osaka, Japan
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7832
Print ISSN: 1355-2511
© MCB UP Limited
2001
Journal of Quality in Maintenance Engineering (2001) 7 (2): 128–150.
Citation
Yamashina H, Otani S (2001), "Optimal preventive maintenance planning for multiple elevators". Journal of Quality in Maintenance Engineering, Vol. 7 No. 2 pp. 128–150, doi: https://doi.org/10.1108/13552510110397430
Download citation file:
New and popular articles
Suggested Reading
Incorporating overall probability of system failure into a preventive maintenance model for a serial system
Journal of Quality in Maintenance Engineering (December,2002)
Some Observations of Operation and Maintenance in Two Swedish Firms
Integrated Manufacturing Systems (February,1992)
The availability of uni‐directionally patrolled stations
International Journal of Quality & Reliability Management (October,1995)
Scheduling with different maintenance policies in a textile company
Journal of Quality in Maintenance Engineering (March,2005)
Minimizing total flow time and maximum tardiness with periodic maintenance
Journal of Quality in Maintenance Engineering (August,2007)
Related Chapters
A multiple objective approach to assigning classes for an executive MBA program
Applications of Management Science
Chinese Tourists and the Sun: Implications for Designing Experiences
Delivering Tourism Intelligence: From Analysis to Action
A Machine Learning–Based Buffer Estimation for Construction Schedules Under Uncertainty
The Role of Artificial Intelligence Applications in Business
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
