Covered ways 12 and 58 are parallel covered ways carrying the District and Circle Lines of London Underground near the High Street Kensington Station. They were constructed in 1867 and support Kelso Place— a twin-ended cul-de-sac—and predominantly residential properties over the railway. The two covered ways are each approximately 110 m long, with interconnecting cross-passages. The roof comprises brick jack-arches spanning onto cast iron beams, 45 in each covered way. The cast iron beams were assessed for the building loads and highway loads, and found to be overstressed. Also, owing to the condition of the track, there had been a history of concerns by local residents relating to noise caused by the passage of trains through the covered ways. In order to improve the existing structure gauge clearances, the tracks were lowered. To minimise the overall construction depth and required track lowering, the new superstructure comprised ‘aerofoiľ-type semicircular steel beams erected within the jack-arches. Piled foundations were constructed in front of the existing piers and abutments to minimise any settlements that would have resulted following track lowering. New track supports were constructed over two sewer crossings in the covered ways. A new ballasted track bed was installed on a noise reduction mat.
Article navigation
August 2005
Research Article|
August 01 2005
Strengthening two London Underground covered ways
T. M. D. Silva, MBE, BSc, CEng, FICE, FIStructE;
T. M. D. Silva, MBE, BSc, CEng, FICE, FIStructE
Metronet Rail SSL Limited
UK
Search for other works by this author on:
D. G. Church, BSc, CEng, FICE
D. G. Church, BSc, CEng, FICE
Metronet Rail SSL Limited
UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
April 23 2004
Accepted:
August 10 2004
Online ISSN: 1751-7710
Print ISSN: 0965-092X
© 2005 Thomas Telford Ltd
2005
Proceedings of the Institution of Civil Engineers - Transport (2005) 158 (3): 139–147.
Article history
Received:
April 23 2004
Accepted:
August 10 2004
Citation
Silva TMD, Church DG (2005), "Strengthening two London Underground covered ways". Proceedings of the Institution of Civil Engineers - Transport, Vol. 158 No. 3 pp. 139–147, doi: https://doi.org/10.1680/tran.2005.158.3.139
Download citation file:
New and popular articles
Suggested Reading
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
Eight footbridges in the Rembrandt Park in Amsterdam
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2006)
Procurement, design and construction of the Clyde Arc, Glasgow
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2009)
A-frame rocker bearing replacement at Humber Bridge, UK
Proceedings of the Institution of Civil Engineers - Civil Engineering (April,2016)
Footbridge over the Sant Adria Marina in Barcelona, Spain
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2005)
Related Chapters
Case studies
Railway Bridge Maintenance
Introduction
Bridge Construction Equipment
Lord Hill’s Bridge Mitigation Works
Crossrail Project: Infrastructure Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.