Bridges
A high-speed railway through marshlands (CTRL). Dyson S. W. and Kirk M. J. D. May, 75–82
Economics & finance
Influence of price and income on rail travel in Ireland. Ahern. A. and Anandarajah G. Nov., 177–181
Road user charging and taxation. Bayliss D. Nov., 147–152
Embankments
Using waste to reduce slope erosion on road embankments, de Oña J. and Osorio F. Feb., 15–24
Environment
Using waste to reduce slope erosion on road embankments, de Oña J. and Osorio F. Feb., 15–24
Fatigue
An analytical study of road pavement fatigue. Evdorides H. T., Snaith M. S. and Anyala M. May, 93–100
Flooding & floodworks
A high-speed railway through marshlands (CTRL). Dyson S. W. and Kirk M. J. D. May, 75–82
Geotechnical engineering
Investigation of railway track subgrade. Part 2: Case study.
Brough M. J., Ghataora G., Stirling A. B., Madelin K. B., Rogers C. D. F. and Chapman D. N. May, 83–92
Health & safety
Accident savings overvalued in road scheme appraisal. Metz D. Nov., 159–163
History
I. K. Brunel: Engineer of the Great Western Railway. Bailey M. R. Briefing. May, 57–61
Rail ballast: conclusions from a historical perspective. Claisse P. and Calla C. May, 69–74
Information technology
England's National Traffic Control Centre: improving travel. Stockbridge G. Aug., 103–107
Infrastructure planning
Influence of price and income on rail travel in Ireland. Ahern. A. and Anandarajah G. Nov., 177–181
Nottingham Express Transit Line I: geometrical aspects. Leighton K. and Gillespy M. May, 63–68
Maintenance & inspection
A decision model for junction improvement schemes. Vassou V., Labib A. and Roberts M. Aug., 127–134
Mathematical modelling
An analytical study of road pavement fatigue. Evdorides H. T., Snaith M. S. and Anyala M. May, 93–100
Predicting long-term soaked CBR of gypsiferous subgrade soils. Razouki S. S. and Kuttah D. K. Aug., 135–140
Testing a traffic signal optimisation algorithm. Abdelfatah A. S. Feb., 41–49
Mechanical engineering
I. K. Brunel: Engineer of the Great Western Railway. Bailey M. R. Briefing. May, 57–61
Pavement design
Behaviour of coated low-quality aggregates in road pavements. Al Nageim H. and Robinson H. Nov., 165–172
Development of German non-ballasted track forms. Bastin R. Feb., 25–39
Pavement moduli variation under heavy aircraft trafficking. Gopalakrishnan K. and Thompson M. R. Aug., 117–125
Predicting long-term soaked CBR of gypsiferous subgrade soils. Razouki S. S. and Kuttah D. K. Aug., 135–140
Rail track design
A high-speed railway through marshlands (CTRL). Dyson S. W. and Kirk M. J. D. May, 75–82
Development of German non-ballasted track forms. Bastin R. Feb., 25–39
I. K. Brunel: Engineer of the Great Western Railway. Bailey M. R. Briefing. May, 57–61
Investigation of railway track subgrade. Part 2: Case study. Brough M. J., Ghataora G., Stirling A. B., Madelin K. B., Rogers C. D. F. and Chapman D. N. May, 83–92
Nottingham Express Transit Line I: geometrical aspects. Leighton K. and Gillespy M. May, 63–68
Rail ballast: conclusions from a historical perspective. Claisse P. and Calla C. May, 69–74
The Madrid–Seville line experience. Guirao B. Aug., 109–116
Railway systems
Development of German non-ballasted track forms. Bastin R. Feb., 25–39
Influence of price and income on rail travel in Ireland. Ahern. A. and Anandarajah G. Nov., 177–181
Prioritising railway projects for investment. Ahern A., Tapley N. and Anandarajah G. Nov., 153–157
Rail ballast: conclusions from a historical perspective. Claisse P. and Calla C. May, 69–74
Research & development
An analysis of road traffic incidents on the M25 motorway, UK. Rodgers S., Wadsworth B., Smith S. D. and Forde M. C. Feb., 1–8
Pavement moduli variation under heavy aircraft trafficking. Gopalakrishnan K. and Thompson M. R. Aug., 117–125
Roads & highways
A decision model for junction improvement schemes. Vassou V., Labib A. and Roberts M. Aug., 127–134
Accident savings overvalued in road scheme appraisal. Metz D. Nov., 159–163
An analytical study of road pavement fatigue. Evdorides H. T., Snaith M. S. and Anyala M. May, 93–100
An analysis of road traffic incidents on the M25 motorway, UK. Rodgers S., Wadsworth B., Smith S. D. and Forde M. C. Feb., 1–8
Behaviour of coated low-quality aggregates in road pavements. Al Nageim H. and Robinson H. Nov., 165–172
Children's views on road environment and safety. Lupton K. and Bayley M. Feb., 9–14
England's National Traffic Control Centre: improving travel. Stockbridge G. Aug., 103–107
Nottingham Express Transit Line I: geometrical aspects. Leighton K. and Gillespy M. May, 63–68
Pavement moduli variation under heavy aircraft trafficking. Gopalakrishnan K. and Thompson M. R. Aug., 117–125
Predicting long-term soaked CBR of gypsiferous subgrade soils. Razouki S. S. and Kuttah D. K. Aug., 135–140
Road user charging and taxation. Bayliss D. Nov., 147–152
Using waste to reduce slope erosion on road embankments. de Oña J. and Osorio F. Feb., 15–24
Site investigation
Investigation of railway track subgrade. Part 2: Case study. Brough M. J., Ghataora G., Stirling A. B., Madelin K. B., Rogers C. D. F. and Chapman D. N. May, 83–92
Statistical analysis
An analysis of road traffic incidents on the M25 motorway, UK. Rodgers S., Wadsworth B., Smith S. D. and Forde M. C. Feb., 1–8
Town & city planning
Work begins on Barnsley Town ‘Gateway’. Thomas C. and Ailward C. Briefing. Aug., 101–102
Traffic engineering
Accident savings overvalued in road scheme appraisal. Metz D. Nov., 159–163
Children's views on road environment and safety. Lupton K. and Bayley M. Feb., 9–14
Road user charging trends in Asia. Kovacs A. Nov., 173–176
Testing a traffic signal optimisation algorithm. Abdelfatah A. S. Feb., 41–49
Transport management
A decision model for junction improvement schemes. Vassou V., Labib A. and Roberts M. Aug., 127–134
Children's views on road environment and safety. Lupton K. and Bayley M. Feb., 9–14
Prioritising railway projects for investment. Ahern A., Tapley N. and Anandarajah G. Nov., 153–157
Road user charging trends in Asia. Kovacs A. Nov., 173–176
Testing a traffic signal optimisation algorithm. Abdelfatah A. S. Feb., 41–49
Transport planning
Prioritising railway projects for investment. Ahern A., Tapley N. and Anandarajah G. Nov., 153–157
Road user charging and taxation. Bayliss D. Nov., 147–152
The Madrid–Seville line experience. Guirao B. Aug., 109–116
Work begins on Barnsley Town ‘Gateway’. Thomas C. and Ailward C. Briefing. Aug., 101–102
Urban regeneration
Work begins on Barnsley Town ‘Gateway’. Thomas C. and Ailward C. Briefing. Aug., 101–102
