Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Issue Section
Date
Availability
1-4 of 4
Keywords: BOLTS
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1995) 111 (1): 40–50.
Published: 01 February 1995
...C TUCKER © Thomas Telford and ICE 1995 REGIONAL RAILWAYS BRITISH RAIL RESEARCH VIADUCTS REFURBISHMENT RAILWAYS STRUCTURES BRIDGES DETERIORATION MASONRY SPANS ARCHES CRACKS BRICKS STONE BRICKWORK CRACKING SPANDRELS TIES BOLTS ROCKBOLTS ROCKBOLTING STONEWORK PIERS...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1993) 100 (4): 249–252.
Published: 01 November 1993
...D. F. Cannon, MIMechE This Technical Note outlines some of the work undertaken by British Rail Research (BRR) on the viability of joining together existing bolted rail to create continuously welded rail. © Thomas Telford and ICE 1993 British Rail Research Permanent Way Railways Low...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1993) 100 (4): 253.
Published: 01 November 1993
..., at a rate typical of the normal welding cycle time, without end cropping. In such cases it was difficult to see how cropping could turn out to be more cost-effective. © Thomas Telford and ICE 1993 INFORMAL DISCUSSION Low-cost conversionof bolted track to continuously weldedrail Proc. Instn Civ...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1992) 95 (4): 239–242.
Published: 01 November 1992
... revealed the need to support the lining in two locations. Rock bolting, grouting and guniting was used at one weak area whereas at the east end a tunnel-within-a-tunnel was constructed for 120 m using precast concrete segments. Extensive temporary works and careful monitoring of the tunnel structure...
