Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Issue Section
Date
Availability
1-4 of 4
Keywords: GROUTING
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
J. R. M. Oliveira, MSc, PhD, C. Sangiorgi, MSc, PhD, G. Fattorini, MSc, S. E. Zoorob, MEng, MSc, PhD
Proceedings of the Institution of Civil Engineers - Transport (2009) 162 (2): 115–123.
Published: 01 May 2009
...J. R. M. Oliveira, MSc, PhD; C. Sangiorgi, MSc, PhD; G. Fattorini, MSc; S. E. Zoorob, MEng, MSc, PhD A conventional grouted macadam is manufactured by producing a highly porous asphalt skeleton (25–35% voids), and filling the voids with a selected highly flowable cementitious grout. Grouted macadam...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (2000) 141 (1): 43–56.
Published: 01 February 2000
... tunnels driven by the TBMs. The difficulties caused by severe geological conditions include dealing with water at high pressure and fissure grouting to reduce water inflow through the permanent lining. Both the temporary and the permanent tunnel lining are described. 4. The North Hollywood Extension...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1995) 111 (1): 40–50.
Published: 01 February 1995
... KING PIERS RESEARCH INSPECTION STRESS DISPLACEMENT DEFLECTION TESTS INSTRUMENTS INSTRUMENTATION RESEARCH INVESTIGATIONS TRIAL REPAIRS GROUTING GROUTS STITCHING BARS ROCKS ANCHORS REPLACEMENT SEALING VOUSSOIRS LIMESTONE BLOCKWORK COSTS WATERPROOFING RESTORATION RIBBLEHEAD...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1992) 95 (4): 239–242.
Published: 01 November 1992
... revealed the need to support the lining in two locations. Rock bolting, grouting and guniting was used at one weak area whereas at the east end a tunnel-within-a-tunnel was constructed for 120 m using precast concrete segments. Extensive temporary works and careful monitoring of the tunnel structure...
