Keywords: Low Cost
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1993) 100 (4): 249–252.
Published: 01 November 1993
... Cost Conversion Bolts Track Continuously Welded Rails Bolted Methods In Situ Welding Research Fatigue Performance Joints Tests Trials Roughness Welds Geometry Stability Fastenings Timber Sleepers Economy Costs Low Low-cost conversionof bolt track to continuously weldedrail...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1993) 100 (4): 253.
Published: 01 November 1993
..., at a rate typical of the normal welding cycle time, without end cropping. In such cases it was difficult to see how cropping could turn out to be more cost-effective. © Thomas Telford and ICE 1993 INFORMAL DISCUSSION Low-cost conversionof bolted track to continuously weldedrail Proc. Instn Civ...

or Create an Account

Close subscription notice
Close access options