Article navigation

In this paper a newly developed three-dimensional hydrodynamic model has been used to investigate the consequences of the site redevelopment of Llanwern and flooding prevention measures. The 3D model includes hydrodynamic pressure without static pressure assumption. Two possible flooding risks have been analysed—tidal flooding from the south and fluvial flooding from the River Usk. Modelling results show that the consequences of the redevelopment and flood prevention measures are minimal on the surrounding area.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$39.00
Rental

or Create an Account

Close subscription notice
Close access options