In the study of river regulation, for more than 100 years engineers have used the interrelation between the chronological series of river flows and the size of active reservoirs. In general, two variables are used: regulated flow q (or demand D) and the size of the active reservoir R. This paper proposes a third variable, the time of regulation (emptying and filling of reservoir) that applies to any size of reservoir. Mathematical analysis of q = f(R) leads to a graphical construction to determine point P, which is the optimum set of regulated flows or releases q, the size of the active reservoir R and the regulation time T for the river at a selected site based on the hydrological characteristics of the river. Once P is determined in the river regulation curve, it is easy to see how the storage decreases or increases, allowing the choice of the active reservoir size for a project. As P is a breaking point, it is important to determine whether building a reservoir of this specific size is economically feasible when its total cost is taken as a point of reference. If so, then one may consider building a larger reservoir if the topographical features of the valley permit and other concerns allow. The best solution, economically, may be to design smaller reservoirs that satisfy the economic constraints of the project. This method is a rapid and accurate way of comparing the regulation potential of several rivers or sites for the same river and can be used for preliminary and final designs.
Article navigation
1 July 2012
Research Article|
July 01 2012
Optimum point in a river regulation curve
Lucio Chiquito, MScTech
Lucio Chiquito, MScTech
Partner
SEDIC S.A. Consulting Engineers, Medellín, Colombia
Search for other works by this author on:
Publisher: Emerald Publishing
Revision Received:
August 05 2010
Accepted:
January 16 2012
Online ISSN: 1751-7729
Print ISSN: 1741-7589
ICE Publishing: All rights reserved
2012
Proceedings of the Institution of Civil Engineers - Water Management (2012) 165 (7): 393–402.
Article history
Revision Received:
August 05 2010
Accepted:
January 16 2012
Citation
Chiquito L (2012), "Optimum point in a river regulation curve". Proceedings of the Institution of Civil Engineers - Water Management, Vol. 165 No. 7 pp. 393–402, doi: https://doi.org/10.1680/wama.10.00079
Download citation file:
New and popular articles
Suggested Reading
The end depth ratio and principal component analysis
Proceedings of the Institution of Civil Engineers - Water Management (September,2010)
Briefing: Introducing the Flood Risk Management Research Consortium
Proceedings of the Institution of Civil Engineers - Water Management (March,2006)
Project history of Dublin's River Liffey bridges
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2003)
Investigation of flow at a right-angled lateral intake
Proceedings of the Institution of Civil Engineers - Water Management (December,2009)
Scour downstream of aprons caused by sluices
Proceedings of the Institution of Civil Engineers - Water Management (June,2005)
Related Chapters
Steady uniform flow in open channels
ICE Core Concepts: Hydraulics for Civil Engineers
Open-channel flow with varying conditions
ICE Core Concepts: Hydraulics for Civil Engineers
Building a resilient system of defence against flooding from the Rhône
ICE Themes Flood Resilience
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
