Skip to Main Content
Article navigation

thyssenkrupp Steel Europe, a major European steel company, operates a so-called push-pickling line (PPL) in Bochum, Germany. The PPL produces a particular type of steel strips that are sold to B2B customers, mainly in the automotive industry. In spring 2014, a senior vice president of thyssenkrupp Steel's production operations and one of his production managers notice that over the span of ten years the production facility regularly did not meet its planned production volumes. They set out to determine the drivers for the deviations from planned production figures with the ultimate goal to improve the production planning process at the Bochum PPL. Students will step into the shoes of Markus Schulze a production manager at thyssenkrupp Steel as he searches for performance drivers at the Bochum PPL and analyzes recent production data to build a forecasting model for production planning.

Cases are developed solely as the basis for class discussion. Cases are not intended to serve as endorsements, sources of primary data, or illustrations of effective or ineffective management. To order copies or request permission to reproduce materials, call 847.491.5400 or e-mail cases@kellogg.northwestern.edu. No part of this publication may be reproduced, stored in a retrieval system, used in a spreadsheet, or transmitted in any form or by any means—electronic, mechanical, photocopying, recording, or otherwise—without the permission of Kellogg Case Publishing.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.

or Create an Account

Close Modal
Close Modal