Article navigation
Purpose

This paper aims to present an investigation of the problems concerned with delivering a variety of differing change programmes in a logically structured, repeatable and measurable manner.

Design/methodology/approach

Case studies were conducted on a selection of significantly different manufacturing facility programmes at GKN Aerospace where the output was a generic model more explicit and illustrative than previous approaches taken at the company.

Findings

This paper supports the idea that a strategic and tactical planning process with transferable, common key issues, can be managed in an environment of rapid change. Furthermore, discreet tailoring of the model enables differentiation of each programme type to support a standardized, repeatable and synchronous approach to change management.

Practical implications

This was achieved through the compilation of a single change management process termed the “5 × 5 Model” incorporating a multi‐site working document containing quantifiable, value‐added activities.

Originality/value

The new model presented here has been developed from previous literature and tested in practice, but requires further application to validate its applicability in different industry sectors.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal