Open figure viewer
A move from build‐to‐order to off‐the‐shelf forced Unisys' Flemington plant to re‐think its manufacturing strategy. Integrating assembly with test and distribution through material and information flow proved to be the answer.
This content is only available via PDF.
© MCB UP Limited
1990
You do not currently have access to this content.
