Skip to Main Content
Article navigation
Purpose

Assembly is the last step in manufacturing processes. The two-sided assembly line balancing problem (TALBP) is a typical research focus in the field of combinatorial optimization. This paper aims to study a multi-constraint TALBP-I (MC-TALBP-I) that involves positional constraints, zoning constraints and synchronism constraints to make TALBP more in line with real production. For enhancing quality of assembly solution, an improved imperialist competitive algorithm (ICA) is designed for solving the problem.

Design/methodology/approach

A mathematical model for minimizing the weighted sum of the number of mated-stations and stations is established. An improved ICA is designed based on a priority value encoding structure for solving MC-TALBP-I.

Findings

The proposed ICA was tested by several benchmarks involving positional constraints, zoning constraints and synchronism constraints. This algorithm was compared with the late acceptance hill-climbing (LAHC) algorithm in several instances. The results demonstrated that the ICA provides much better performance than the LAHC algorithm.

Practical implications

The best solution obtained by solving MC-TALBP-I is more feasible for determining the real assembly solution than the best solution obtained by solving based TALBP-I only.

Originality/value

A novel ICA based on priority value encoding is proposed in this paper. Initial countries are generated by a heuristic method. An imperialist development strategy is designed to improve the qualities of countries. The effectiveness of the ICA is indicated through a set of benchmarks.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal