Open figure viewer
Launched in May, the 10‐member IN FACT project intends to install two flexible assembly machine prototypes by the end of 1990. Jack Hollingum went to investigate.
This content is only available via PDF.
© MCB UP Limited
1989
You do not currently have access to this content.
