Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: Cycle time
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Using total cycle time for quick response manufacturing
Available to Purchase
Journal:
Robotic Intelligence and Automation
Assembly Automation (1998) 18 (1): 20–24.
Published: 01 March 1998
...Lee Grubb Thomas Group Inc., with offices in Irving, Texas, Detroit, Michigan, Singapore and Frankfurt, Germany, has more than 20 years’ experience of vastly improving client business efficiency through cycle time reduction. This article explains the advantages of moving from a “blame culture...
Journal Articles
“Zero‐knit” line formed in‐place gaskets for electronic module sealing
Available to Purchase
Journal:
Robotic Intelligence and Automation
Assembly Automation (1996) 16 (4): 15–18.
Published: 01 December 1996
... is one where the material remains in the form of an O ring as much as possible and thus allows for maximum compressibility and conformity (see plate 1). One last consideration with formed inplace gaskets is the processing time allowed to dispense the materials. Overall cycle time allowed for high...
