Skip Nav Destination
Close Modal
Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Heuristic
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
A novel optimization approach for segmented rabbit chase oriented U-type assembly line design: an application from lighting industry
Available to Purchase
Journal:
Robotic Intelligence and Automation
Assembly Automation (2020) 40 (3): 483–510.
Published: 01 May 2020
... number of workers. Then, stations are determined within each segment for forward and backward sections separately using two different pre-emptive goal programming models. Moreover, three heuristics are developed to provide solution quality with computational efficiency. Findings The proposed...
Journal Articles
An integrated approach for line balancing and AGV scheduling towards smart assembly systems
Available to Purchase
Journal:
Robotic Intelligence and Automation
Assembly Automation (2020) 40 (2): 219–234.
Published: 03 February 2020
... of designing a balanced robotic assembly line and the scheduling of AGVs to feed materials to these lines such that the cycle time and total tardiness of the assembly system are minimized. Because of the combination of two well-known complex problems such as line balancing and material handling and a heuristic...
Journal Articles
Workload smoothing in two-sided assembly lines
Available to Purchase
Journal:
Robotic Intelligence and Automation
Assembly Automation (2018) 38 (1): 51–56.
Published: 15 December 2017
...-sided assembly lines, as the idle time occur at the beginning and in the middle of a cycle within workstations. Then, the finish-time-based SI and MAD (FSI and FMAD) are defined, and a heuristic procedure based on the core mechanism of Moodie and Young method is proposed to smooth the assembly workload...
