Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Production engineering
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Journal:
Team Performance Management
Team Performance Management: An International Journal (2006) 12 (5-6): 138–154.
Published: 01 July 2006
... was designed to specifically test for the existence of a mediating variable (TP). Toni L. Doolen can be contacted at: doolen@engr.orst.edu © Emerald Group Publishing Limited 2006 Production engineering Team working Team performance The use of teams in the engineering world has become...
Journal Articles
Journal:
Team Performance Management
Team Performance Management: An International Journal (2006) 12 (5-6): 125–137.
Published: 01 July 2006
... integration Production engineering Product development The outer model trimming processes resulted in the loss of four manifest variables from the final model, as their loadings were < 0.55 (p≤0.01) and, as a result, had little in common with the remaining manifest variables. Cross...
Journal Articles
Journal:
Team Performance Management
Team Performance Management: An International Journal (2005) 11 (7-8): 263–279.
Published: 01 October 2005
... implemented. Team working Production engineering Product development Least squares approximation Concurrent engineering (CE) is an approach for developing products where “product design and manufacturing process development occur concurrently in an integrated fashion, using a cross‐functional...
