This article addresses how an organization can combine sig‐sigma and the Internet to reduce costs, improve the delivery success rate, and increase service quality. The model that was developed to map the six‐sigma quality process against the software development life cycle was introduced. A case study in which the model was applied is discussed: use of the model enabled the IT organization to infuse six‐sigma into the Internet development effort and gave the rest of the company an understanding of the necessary steps for that attempt to be successful. Total commitment is necessary to carry this process out; hoever, this commitment allows organizations as a whole to “get it right the first time around”, while satisfying client and business requirements.
Article navigation
Case Report|
October 01 2003
Remember, the (Internet) applet doesn’t fall far from the tree
Tom Mc Nellis;
Tom Mc Nellis
Tom Mc Nellis is Dean of E‐Learning at the Harrington Institute, West Chester, Pennsylvania, USA
Search for other works by this author on:
H. James Harrington
H. James Harrington
H. James Harrington is CEO, the Harrington Institute, Los Gatos, California, USA.
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6887
Print ISSN: 0954-478X
© MCB UP Limited
2003
The TQM Magazine (2003) 15 (5): 302–315.
Citation
Mc Nellis T, Harrington HJ (2003), "Remember, the (Internet) applet doesn’t fall far from the tree". The TQM Magazine, Vol. 15 No. 5 pp. 302–315, doi: https://doi.org/10.1108/09544780310487703
Download citation file:
153
Views
New and popular articles
Suggested Reading
Quality assuring an Internet‐based service
Managing Service Quality: An International Journal (April,1998)
Doing it right the second time
Industrial Management & Data Systems (September,1996)
Structural development of Internet self‐regulation: Case study of the Internet Content Rating Association (ICRA)
Info (October,2002)
Wisdom on the Green: Smarter Six Sigma Business Solutions (2nd ed.)
The TQM Magazine (December,2003)
Six Sigma Study Guide CD
The TQM Magazine (December,2003)
Related Chapters
Case study – a typical extension of time claim under a JCT contract
Delay and Disruption Claims in Construction
Case study – a compensation event claim on an infrastructure project under an NEC3 contract
Delay and Disruption Claims in Construction
Case study – delay and disruption claim on an international contract based on the FIDIC form
Delay and Disruption Claims in Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
