Open figure viewer
Combining with an instance of rectification and reinforcement of a brick-concrete structure house in the Yunnan province, a comprehensive landing method was proposed. The building was reinforced, for the existing problems, on the basis of the analysis of the building tilt reasons. In order to ensure building safety in the process of rectifying inclination, the anchor static pile was used. The result showed that the inclination rate of the building returned to 3 % from 14.4 %, which proves the effectiveness of the proposed method.
This content is only available via PDF.
You do not currently have access to this content.
