Skip to article sections
Purpose

Chloride salts are highly hygroscopic, which can lead to severe corrosion of metallic materials at elevated temperatures, greatly limiting their practical applications. This paper aims to evaluate the impact of impurity moisture on the metal corrosiveness of molten salt and achieve complete removal of impurity moisture.

Design/methodology/approach

Here, the authors choose the dissolution corrosion of nickel metal in LiCl-KCl eutectic salt as a research model. The authors prepared LiCl-KCl eutectic salt and further synthesized molten LiCl-KCl-Li salt solution containing dissolved metallic Li component using it as raw material. The static corrosion test of nickel in molten LiCl-KCl-Li and LiCl-KCl was applied to evaluate their corrosiveness.

Findings

The Ni sheet in LiCl-KCl undergoes obvious dissolution corrosion, and the generated Ni2 + ions mainly exist in the form of KNiCl3 complex with a small amount of dissolved NiO. In contrast, LiCl-KCl-Li solution shows ultra-low corrosiveness toward metal Ni, and no significant Ni content was detected in the LiCl-KCl-Li sample that reacted with a Ni sheet at 600°C for 7 days.

Originality/value

Through near-ideal controlled experiments, the study deeply explored the impact of residual moisture in chlorine salts after heat treatment on metal corrosion. The research results reveal that the impurity moisture in LiCl-KCl plays a crucial role in the Ni corrosion, and can be completely removed by using an excess of metallic Li, resulting in a molten-salt solution with almost no corrosivity.

Molten chloride salts, such as LiCl-KCl eutectic salt, have important applications in various fields, including molten salt electrolysis and electroplating (Choi et al., 2024; Han et al., 2021; Xi et al., 2024), heat transfer and thermal energy storage (Ding and Bauer, 2021; Rong et al., 2024), battery electrolytes (Cui et al., 2022; Zhou et al., 2023), nuclear reactors (Cisneros et al., 2024), spent fuel reprocessing (Liu et al., 2023a, 2023b; Mullabaev et al., 2018; Salyulev et al., 2017), materials synthesis (Li et al., 2022; Shen et al., 2021; Yang et al., 2024), etc. However, high-temperature molten salts are corrosive to metal materials. Especially, chloride salts are highly hygroscopic and can undergo hydrolysis to produce highly corrosive acids at high temperatures (Ding et al., 2018; Guo et al., 2018). The corrosiveness of molten salts is a problem that must be considered in their practical applications. On the one hand, the practical application of molten salts can be met to a certain extent by improving the corrosion resistance of metal materials or developing corrosion-resistant alloys (Wang et al., 2022). Nickel metal or nickel-based alloys have better corrosion resistance than stainless steel and are an important type of structural material for high-temperature molten salts (Shankar et al., 2013; Sun et al., 2018, 2018b; Sun et al., 2018a, 2018b). On the other hand, more and more researches have focused on the corrosiveness from the perspective of molten-salt and emphasized the importance of maintaining salt purity and redox potential (Ong et al., 2020; Zhang et al., 2018). Different purification methods have been used to reduce the corrosiveness of molten chloride salts, such as reducing the moisture content of chloride salts through heating, purifying LiCl-KCl by injecting Cl2, and adding additional substances as corrosion inhibitors (Ding et al., 2019a, 2019b; Huang et al., 2011; Ravi Shankar and Kamachi Mudali, 2017). Heating is a simple and commonly used method to directly reduce the moisture content of chloride salts, but it is difficult to completely remove moisture (Huang et al., 2011). The use of chlorine gas will bring additional corrosiveness (Ravi Shankar and Kamachi Mudali, 2017). Adding corrosion inhibitors to deeply purify molten salts is a flexible and efficient method, but it is necessary to consider the additional impact of corrosion inhibitors on the parent salts.

Adding reactive metals to molten salts is one effective method for removing moisture. For example, excess Be was used to maintain reducing conditions in the FLiBe salt during the Molten Salt Reactor Experiment of Oak Ridge National Lab (Jiang et al., 2022). Similarly, the addition of lithium as a reducing agent effectively controls the redox potential of molten LiF-NaF-KF, significantly reducing corrosion in Hastelloy N and 316H stainless steel (Sankar and Singh, 2021). Correspondingly, Ding et al. (Ding et al., 2019a, 2019b) showed that the introduction of excess Mg resulted in prevention of corrosion of structural materials in MgCl2-NaCl-KCl eutectic salt. However, the use of active metals for removing moisture contained in LiCl-KCl has rarely been reported. Recent researches have found that metallic lithium can dissolve in molten LiCl salt in the form of Lin clusters to form LiCl-Li solution (Guo et al., 2019; Merwin et al., 2016). Our previous research has shown that other metals such as copper can also dissolve in LiCl-KCl in the form of Cun clusters (Liu et al., 2023a, 2023b). These findings indicate that metal Li may also dissolve in molten LiCl-KCl salt in metallic form to form LiCl-KCl-Li solution. Due to the excellent moisture removal effect of metallic Li, such LiCl-KCl-Li solution is expected to exhibit extremely low corrosiveness.

In this paper, we first prepared LiCl-KCl eutectic salt, and then used it and lithium sheet as raw materials to further successfully synthesize molten LiCl-KCl-Li salt solution with dissolved metallic Li component. Their corrosiveness to metal was evaluated by the static corrosion test of nickel sheet in the LiCl-KCl and LiCl-KCl-Li. Because the chemical form of corrosion product ions is not only closely related to the corrosion mechanism, but may also have an impact on subsequent corrosion behavior, we also investigated the valence state and coordination structure of Ni in LiCl-KCl after the reaction by using X-ray absorption fine structure (XAFS) and ultraviolet-visible (UV-vis) spectra. Finally, we explored the corrosion mechanism of Ni in LiCl-KCl and the reasons for the ultra-low corrosiveness of LiCl-KCl-Li.

LiCl (99.99%, Sigma Aldrich) and KCl (99.99%, Sigma Aldrich) were subjected to vacuum drying at 50°C for over 24 h to eliminate the free water. Subsequently, a mixture of LiCl and KCl salt (44.5:55.5 Wt.%) was placed in a quartz crucible and transferred to an electric furnace located in a glove box (H2O < 0.1 ppm, O2 < 0.1 ppm) under an argon atmosphere. The mixture was then heated to 150°C at a rate of 5°C/min and kept at this temperature for over 24 h to remove water in the salt. The mixture was then further heated to 600°C and maintained at this temperature for at least 24 h to remove the most volatile impurities from the molten salt. The processed mixture was poured into a quartz crucible to cool to obtain solid LiCl-KCl eutectic salt.

Approximately 0.2 g of lithium metal (Li, 99.9%, Sinopharm Chemical Reagent Co., Ltd) was added to a BN crucible containing about 20 g of the prepared LiCl-KCl eutectic salt. The crucible was then heated to 600°C and held at this temperature for more than 24 h to obtain a mixture. After removing undissolved Li metal particles from the cooled mixture, a solid LiCl-KCl-Li_600 sample was obtained. The LiCl-KCl-Li_600 solution can be further obtained after heating and melting the solid sample. Similarly, LiCl-KCl-Li_500 sample was also prepared at 500°C.

A polished nickel sheet (Ni, 99.5%, 2 cm × 1cm × 0.5 cm, Qinghe Jinou metal material Co., LTD) added to a BN crucible containing about 20 g of LiCl-KCl-Li_600, and the crucible was heated to 600°C and kept at that temperature for 7 days. During the reaction process, we collected quenched salt samples by using BN threaded tubes on the first and seventh days, respectively. The two quenched salt samples were both named LiCl-KCl-Li-Ni_600. Similarly, we also collected the quenched salt samples for Ni reacting with LiCl-KCl-Li_500 at 500°C and named both samples LiCl-KCl-Li-Ni_500. As a comparison, the corresponding quenched salts for Ni and LiCl-KCl after reaction at 500°C and 600°C were also collected and named LiCl-KCl-Ni_500 and LiCl-KCl-Ni_600, respectively.

UV-vis: Liquid LiCl-KCl-Ni_500, LiCl-KCl-Ni_600, LiCl-KCl-Li-Ni_500 and LiCl-KCl-Li-Ni_600 samples were analyzed by high-temperature UV-vis spectroscopy which was designed and verified by our group (Liu et al., 2020). Its apparatus is shown in Fig. S1 (Supplementary Information). The light beam was from a deuterium tungsten lamp (ideaoptics, iDH2000), which was guided through the middle of the sample cell by a set of optical lens, and the transmitted light was focused into a spectrometer (from Ocean Optics Co., QE Pro 65) to obtain the absorption spectra. About 2.0 g of sample was transferred into a quartz sample cell (light path of 10 mm) in an electric furnace that was placed in a glove box, and heated to corresponding reaction temperature and maintained at this temperature.

Gas Chromatography (GC): Approximately 1 g of sample was added into a 20 ml glass bottle with a rubber stopper in a glove box. Approximately 5 mL of deionized water was injected into the bottle by using a syringe. We shook the bottle to dissolve the sample. Next, we collected the upper layer of gas inside the bottle using a syringe and inject it into a GC for testing.

Inductively coupled plasma atomic emission spectrometer (ICP-OES): Nickel concentration of samples is measured by ICP-OES (Spectro Arcos, Germany ametek Co., LTD). Approximately 0.2 g of sample was added in 50 ml of 2 wt% dilute nitric acid. The nitric acid solution was placed in a water bath simultaneously and kept the temperature at 60°C for 24 h to ensure complete dissolution of the sample. Each sample was measured twice and the average value was taken as the testing result.

Scanning electron microscope (SEM): The reacted nickel sheet was removed from the crucible. The surface of the nickel sheet was then cleaned with deionized water, followed by drying. A small sample of the nickel sheet was subsequently sectioned using a electric saw for SEM characterization. The morphology of the sample was analyzed using a Zeiss Merlin Compact LEO 1530 VP electron scanning microscope (Carl Zeiss, Inc., Germany). The elemental composition of the samples was characterized using the energy dispersive spectroscopy (EDS, Aztec X-Max 50). It should be noted that the samples used for cross-sectional analysis were abraded and polished.

XRD: Solid salts were grinded and loaded into sample stages in the glove box. The samples were sealed with Kapton film to prevent contact with air. X-ray diffraction data was measured on Bruker D8 ADVANCE with Cu-Kα (1.5406 Å) radiation (40 kV, 40 mA). All samples were mounted on the same sample holder with the scanning range from 20° to 90° at the sweep speed of 5° min−1.

XAFS:XAFS spectra at the Ni K-edge were recorded on beamline 20U1 at the Shanghai Synchrotron Radiation Facility (SSRF). The electron beam energy was 3.5 GeV with a stored current of approximately 200 mA in top-up operation. A fixed-exit double crystal Si < 111> monochromator was used for the incident energy selection. The XAFS data including the X-ray absorption near-edge structure (XANES) and extended X-ray absorption fine structure (EXAFS) were collected in fluorescence mode by applying a 4-element silicon drift detector. Ni foil, NiO and NiCl2 powder were also measured under similar condition for comparison.

Standard procedures were followed to analyze the XAFS data using the software package Demeter (Ravel and Newville, 2005). The backscattering amplitude and phase shift were calculated with the program FEFF9 (Rehr et al., 2010). The Fourier transformation of the k3-weighted EXAFS oscillations from k-space to r-space was performed over a range of 2.8–11.5 Å−1. The value of amplitude reduction factor S02 was fixed at 0.9. Other structural parameters, such as coordination numbers (N), bond distance (R), Debye–Waller factor (σ2) and inner potential shift (ΔE0), were obtained from the fitting.

Infrared (IR): The IR spectra of samples were measured by the Fourier Transform Infrared Spectroscopy (Perkin Elmer spectrometer). Each sample and KBr were thoroughly ground and pressed into a plate of 13 mm diameter. The plate then placed into a slide holder under argon atmosphere. IR spectra were recorded in the transmission mode with a 2 cm−1 resolution between 4000 and 1000 cm−1. Each spectrum was averaged by 32 scans.

As shown in Figure 1, we synthesized liquid LiCl-KCl eutectic salt. The colorless and transparent LiCl-KCl was cooled to obtain a solid sample. Powder XRD profile of the solid LiCl-KCl sample is shown in Figure 2(a). All diffraction peaks of the LiCl-KCl can be assigned to the signals of LiCl and KCl. No other components were detected in the XRD pattern, which is consistent with the fact that Li+and K+ ions do not tend to form complexes. The experimental results indicate that we have successfully prepared high-purity LiCl-KCl molten salt.

As shown in Figure 1, the solid LiCl-KCl-Li samples were obtained by removing undissolved Li metal particles from the cooled mixture As shown in Figure 2(a), the XRD patterns of solid LiCl-KCl-Li_500 and LiCl-KCl-Li_600 have no signals of metal Li and lithium compounds, except for diffraction peaks similar to the LiCl-KCl. Similar to molten LiCl-KCl salt, liquid LiCl-KCl-Li_500 and LiCl-KCl-Li_600 are both transparent. Their UV-vis spectra have no absorption in the range of 300 nm to 850 nm (Fig. S2, Supplementary Information). These results indicate that metal Li has dissolved in molten LiCl-KCl salt to form a LiCl-KCl-Li solution. We used a GC to detect the gas components generated by the reaction between solid LiCl-KCl-Li and deionized water. The gas chromatography data of LiCl-KCl-Li_500 and LiCl-KCl-Li_600 are shown in Figure 2(b). Compared with LiCl-KCl, both LiCl-KCl-Li_500 and LiCl-KCl-Li_600 exhibit a strong peak around 1.25 min corresponding to the position of H2 gas. These results suggest that a portion of Li metal can dissolve into LiCl-KCl molten salt as a metallic Li component to form a LiCl-KCl-Li solution.

As it is well-known, simply heating not only makes it difficult to completely remove moisture from chloride salts, but also causes hydrolysis of chloride salts containing moisture at high temperatures. For LiCl-KCl containing moisture impurities, hydrolysis of LiCl produces Li2O and HCl (Gao et al., 2025; Wang et al., 2025). HCl has strong corrosiveness to metals at high temperatures, and can dissolve metal Ni and its surface oxide NiO to form NiCl2 (Horvath and Simpson, 2018). Therefore, metal Ni can be used as a metal model for evaluating the corrosiveness of molten salts, and the corrosiveness can be reflected by detecting the Ni content of the reacted molten salts.

The obtained LiCl-KCl-Li samples in this article, including LiCl-KCl-Li_500 and LiCl-KCl-Li_600, have dissolved metallic Li components which may exist in the form of Lin clusters (Fan et al., 2013). The occurrence of metallic Li component reveals that impurities such as H2O and HCl in LiCl-KCl molten salt have completely reacted with Li. Therefore, liquid LiCl-KCl-Li can be regarded as a deeply purified molten LiCl-KCl salt solution, and is expected to have low corrosiveness. Moreover, the dissolved metallic Li in LiCl-KCl-Li does not react with nickel ions or metal Ni, so it does not interfere with the content of Ni element in the molten salt. Therefore, the Ni content of the molten salt after reacting with metallic nickel can be used to evaluate the corrosiveness of the molten salt.

We chose the static corrosion test of nickel in LiCl-KCl-Li samples as the molten-salt evaluation model, and measured the Ni content in the samples after the reaction to evaluate their corrosiveness. A nickel metal sheet polished with sandpaper was added to a BN crucible containing about 20 g of LiCl-KCl-Li_600. After heating the crucible to 600°C and holding it for 1 day and 7 days, we collected corresponding quenched salt samples using BN threaded tubes and named both samples LiCl-KCl-Li-Ni_600. Similarly, we also collected the quenched salt samples for Ni reacting with LiCl-KCl-Li_500 at 500°C and named both samples LiCl-KCl-Li-Ni_500. As a comparison, the corresponding quenched salts for Ni and LiCl-KCl after reaction at 500°C and 600°C were also collected and named LiCl-KCl-Ni_500 and LiCl-KCl-Ni_600, respectively.

The LiCl-KCl-Li-Ni_500 and LiCl-KCl-Li-Ni_600 samples are white, and the representative LiCl-KCl-Li-Ni_600 sample collected on the seventh day is shown in Figure 3(a). The LiCl-KCl-Ni_500 and LiCl-KCl-Ni_600 samples appears light blue, and the sample LiCl-KCl-Ni_600 collected on the seventh day, as a representative, is shown in Figure 3(b). The high temperature UV-vis spectrum of the LiCl-KCl-Ni_600 collected on the seventh day is shown in Figure 4. The liquid LiCl-KCl-Ni_600 is a blue purple solution and exhibits absorption in both visible and near ultraviolet regions. There is a strong absorption band centered at 270 nm in the ultraviolet region. In the visible light region, the LiCl-KCl-Ni_600 displays a weak broad absorption with three distinguishable bands centered at 510 nm, 600 nm and 710 nm. These absorption bands are typical characteristics of Ni2+ in molten LiCI-KCI eutectic salt and are in good agreement with other literature report (Harrington and Sundheim, 2006). These findings suggest that the nickel sheet have undergone dissolution corrosion in LiCl-KCl molten salt. In contrast, LiCl-KCl-Li-Ni_600, similar to LiCl-KCl-Li_600, is transparent and does not exhibit absorption in both visible and near ultraviolet regions. The phenomenon indicates that the LiCl-KCl-Li samples have low corrosiveness and the nickel sheet did not undergo visible dissolution corrosion.

To further evaluate the difference in corrosiveness between LiCl-KCl-Li and LiCl-KCl, we detected the Ni content of the corresponding representative samples by using ICP-OES. The Ni content in LiCl-KCl-Ni_600 and LiCl-KCl-Li-Ni_600 samples are shown in Table S1 (Supplementary Information). The Ni content in the LiCl-KCl-Ni_600 samples collected on the first and seventh day was determined to be approximately1 ppm and approximately 151 ppm, respectively. In contrast, no Ni content above the ICP-OES detection limit was detected in the LiCl-KCl-Li-Ni_600 samples (Table S1) collected on the first and seventh day. These results reveal that the LiCl-KCl has obvious corrosiveness toward Ni, while the LiCl-KCl-Li shows ultra-low corrosiveness to Ni.

To explore the reason for the ultra-low corrosiveness of LiCl-KCl-Li, we studied the corrosion mechanism of Ni in LiCl-KCl molten salt. To better understand the corrosion mechanism of nickel in LiCl-KCl, we investigated the chemical form of Ni in LiCl-KCl-Ni_600. XRD data of the LiCl-KCl-Li-Ni_600 and LiCl-KCl-Ni_600 samples collected on the seventh day is shown in Figure 5(a). Similar to LiCl-KCl, no other components were observed in their patterns except for the signals of LiCl and KCl. To explore the local structure of Ni in solid LiCl-KCl-Ni_600, we implemented XAFS measurements for the LiCl-KCl-Ni_600 sample collected on the seventh day. The Ni K-edge XANES data for Ni foil, NiCl2, NiO and LiCl-KCl-Ni_600 are displayed in Figure 5(b). Ni foil has absorption edge at approximately 8332 eV and exhibits distinct absorption peaks at approximately 8334 eV, approximately 8348 eV and approximately 8357 eV, respectively. These features are attributed to the electric dipole 1 s→4p transitions (Nakai et al., 2001). The absorption edge positions of both NiO and NiCl2 shift to high energy direction compared with Ni foil. There is a strong main edge crest corresponding to 1 s→4p absorption in the XANES spectra of both NiCl2 and NiO. In addition, they show a weak pre-edge peak at approximately 8332 eV, which is due to the electric quadrupole 1 s→3d transition (Yamamoto, 2008). The LiCl-KCl-Ni_600 also has a pre-edge peak at approximately 8332 eV and has the same absorption edge position located at about 8340 eV as NiCl2. The finding reveals that the oxidation state of Ni in LiCl-KCl-Ni_600 is 2+, which is consistent with the above UV-vis result.

The coordination structure of Ni2+ in LiCl-KCl-Ni-600 was further determined by analyzing the Ni K-edge EXAFS data. The k3-weighted Ni K-edge EXAFS oscillation for NiCl2, NiO and LiCl-KCl-Ni_600 are shown in Figure 5(c). The LiCl-KCl-Ni_600 displays a different EXAFS spectrum compared to NiCl2 and NiO. Fourier transform (FT) of the EXAFS spectra without phase shift correction are shown in Figure 5(d). The NiO displays two symmetrical main peaks below 3 Å. The first peak at approximately 1.6 Å arises from Ni-O coordination and the second peak at approximately 2.5 Å results from Ni-Ni scattering contribution. The NiCl2 has two main peaks. The strong peak at approximately 2.0 Å is ascribed to Ni-Cl coordination and the weak peak at approximately 3.1 Å is attributed to Ni-Ni contribution. Significantly, by comparing with NiO and NiCl2, it can be distinguished that LiCl-KCl-Ni_600 has only overlapping Ni-O and Ni-Cl peaks. The LiCl-KCl-Ni_600 can be well fitted by using both Ni-O and Ni-Cl shells. (Figure S3, Supplementary Information) The structural parameters derived from the EXAFS fitting are compiled in Table 1. The average coordination numbers of Ni-O and Ni-Cl in LiCl-KCl-Ni_600 were determined to be 2.5 ± 0.4 and 5.0 ± 0.5, respectively. The average bond lengths of Ni-O and Ni-Cl in LiCl-KCl-Ni_600 were determined to be approximately 2.04 Å and approximately 2.35 Å, respectively. The results indicate that Ni2+ in LiCl-KCl-Ni-600 mainly exists in the form of KNiCl3 complex with a small amount of dissolved NiO.

The SEM image of the nickel sheet after reacting with LiCl-KCl at 600°C for 7 days is shown in Figure 6(a). The Ni sheet surface displays uneven fish scale-like corrosion pits, which further confirms that nickel metal undergoes obvious dissolution corrosion in LiCl-KCl. EDS elemental mappings of the Ni sheet are shown in Figure 6(b). There are some obvious Ni depletion zones in the Ni element distribution map. The distribution of O element [Figure 6(c)] is more uneven and the distribution area is noticeable smaller than that of Ni. In addition, the EDS analysis (Figure S4a, Supplementary Information) shows that the content of Ni and O elements is 99.2 Wt% and 0.5 Wt%, respectively. In contrast, as shown in Figure 6(b), the surface of the Ni sheet after reacting with LiCl-KCl-Li has no obvious pitting and is flatter. This phenomenon further confirms the ultra-low corrosiveness of LiCl-KCl-Li. The surface of the Ni sheet exhibits a more uniform distribution of Ni and O elements [Figure 6(e) and (f), ] with higher oxygen content (Figure S4b Supplementary Information). These findings reveal obvious dissolution of surface NiO and Ni on the Ni sheet in LiCl-KCl. Cross-sectional SEM images of the post-corroded Ni sheets in LiCl-KCl and LiCl-KCl-Li at 600°C for 7 days are shown in Figure S5 (Supplementary Information). The Ni sheet after reacting with LiCl-KCl exhibits some irregular corrosion pits with a maximum depth of approximately 3 µm (Figure S5a). No corrosion pits were observed in the Ni sheet after reacting with LiCl-KCl-Li (Figure S5b).

IR spectra of the LiCl-KCl-Ni_600 and LiCl-KCl-Li-Ni_600 samples collected on the seventh day are shown in Figure 7. LiCl-KCl exhibits strong characteristic absorption peaks of H2O at approximately 3410 cm−1 and approximately 1645 cm−1. The broad peak centered at approximately 3410 cm−1 is referred as the O-H stretching mode and the intense peak at approximately 1645 cm−1 is assigned to the bending vibration of O-H (Sun et al., 2020; Yu et al., 2020). This result further confirms that the synthesized LiCl-KCl contains a certain degree of moisture, indicating that it is difficult to completely remove moisture from LiCl-KCl solely through heating. It should be noted that the area of the H2O absorption peaks of LiCl-KCl-Ni_600 is significantly smaller than that of LiCl-KCl_600. This phenomenon implies that impurity moisture in LiCl-KCl is involved in the dissolution corrosion of metal Ni. Due to the moisture absorption during the testing process, the LiCl-KCl-Li_600 and LiCl-KCl-Li-Ni_600 samples also exhibited characteristic H2O peaks whose intensities are obvious lower than those of LiCl-KCl-Ni_600.

Based on the above analysis, it can be concluded that the impurity moisture in LiCl-KCl plays a key role in the dissolution corrosion of Ni. The highly corrosive HCl generated by the hydrolysis of chloride salts at high temperatures will undergo redox reaction with Ni atoms on the surface of nickel sheet. The Ni2+ ions generated by the reaction dissolve into LiCl-KCl and mainly exist in the form of KNiCl3 complex. In addition, the highly corrosive HCl will also dissolve the unavoidable oxidation component NiO on the surface of nickel sheet into LiCl-KCl molten salt. When metallic lithium dissolves into LiCl-KCl to form a LiCl-KCl-Li solution, the impurity moisture of LiCl-KCl will react with Li and be completely consumed. Therefore, LiCl-KCl-Li samples with dissolved metallic Li component neither exist nor produce highly corrosive HCl at high temperatures, ultimately exhibiting ultra-low corrosiveness to metal nickel.

The LiCl-KCl-Li samples with dissolved metallic Li component were synthesized by heating a mixture of LiCl-KCl eutectic salt and metal lithium. The static corrosion test of nickel in molten LiCl-KCl-Li and LiCl-KCl was applied to evaluate their corrosiveness. It is proved that the Ni sheet in LiCl-KCl undergoes obvious dissolution corrosion, and the generated Ni2+ ions mainly exist in the form of KNiCl3 complex with a small amount of dissolved NiO. In contrast, the molten LiCl-KCl-Li salt solution shows ultra-low corrosiveness toward metal Ni. No Ni content above the ICP-OES detection limit was detected in the LiCl-KCl-Li sample that reacted with a Ni sheet at 600°C for 7 days. It was demonstrated that the impurity moisture in LiCl-KCl plays a key role in the dissolution corrosion of Ni and is difficult to be completely removed by heating. Fortunately, the dissolved metallic Li in LiCl-KCl-Li ensures the complete removal of impurity moisture, thereby cutting off the pathway for Ni to react with highly corrosive HCl. This work provides a scientific basis for inhibiting metal corrosion in chloride salts from the perspective of molten-salt regulation.

All data included in this research are available upon request by contact with the corresponding author.

Choi
,
W.
,
Cho
,
S.
and
Lee
,
J.
(
2024
), “
Feasibility of clearance level electrolytic decontamination of simulated radioactive ni-based alloy
”,
Electrochimica Acta
, Vol.
494
, p.
144473
, doi: .
Cisneros
,
T.
,
Wargon
,
M.
,
Harper
,
B.
,
Hanselman
,
K.
,
Kawano
,
T.
,
Kuvin
,
S.A.
and
Lee
,
H.Y.
(
2024
), “
Reactivity impact of updated 35Cl nuclear data on the molten chloride reactor experiment
”,
Nuclear Science and Engineering
, Vol.
200
No.
sup1
, pp.
1
-
11
, doi: .
Cui
,
K.
,
Zhao
,
W.
,
Li
,
S.
,
Zhou
,
D.
,
Liu
,
C.
,
Qu
,
X.
and
Li
,
P.
(
2022
), “
Low-temperature and high-energy-density Li-based liquid metal batteries based on LiCl-KCl molten salt electrolyte
”,
ACS Sustainable Chemistry & Engineering
, Vol.
10
No.
5
, pp.
1871
-
1879
, doi: .
Ding
,
W.
,
Gomez-Vidal
,
J.
,
Bonk
,
A.
and
Bauer
,
T.
(
2019a
), “
Molten chloride salts for next generation CSP plants: electrolytical salt purification for reducing corrosive impurity level
”,
Solar Energy Materials and Solar Cells
, Vol.
199
, pp.
8
-
15
, doi: .
Ding
,
W.
,
Shi
,
H.
,
Jianu
,
A.
,
Xiu
,
Y.
,
Bonk
,
A.
,
Weisenburger
,
A.
and
Bauer
,
T.
(
2019b
), “
Molten chloride salts for next generation concentrated solar power plants: mitigation strategies against corrosion of structural materials
”,
Solar Energy Materials and Solar Cells
, Vol.
193
, pp.
298
-
313
, doi: .
Ding
,
W.
and
Bauer
,
T.
(
2021
), “
Progress in research and development of molten chloride salt technology for next generation concentrated solar power plants
”,
Engineering
, Vol.
7
No.
3
, pp.
334
-
347
, doi: .
Ding
,
W.
,
Bonk
,
A.
and
Bauer
,
T.
(
2018
), “
Corrosion behavior of metallic alloys in molten chloride salts for thermal energy storage in concentrated solar power plants: a review
”,
Frontiers of Chemical Science and Engineering
, Vol.
12
No.
3
, pp.
564
-
576
, doi: .
Fan
,
X.
,
Zheng
,
W.T.
,
Kuo
,
J.L.
and
Singh
,
D.J.
(
2013
), “
Adsorption of single Li and the formation of small Li clusters on graphene for the anode of lithium-ion batteries
”,
ACS Applied Materials & Interfaces
, Vol.
5
No.
16
, pp.
7793
-
7797
, doi: .
Gao
,
B.
,
Yu
,
R.
,
Chen
,
S.
,
Hu
,
H.
,
Wu
,
K.
and
Zhang
,
X.
(
2025
), “
Corrosion behavior of surface-modified Ni-based alloys in molten NaCl-KCl for thermal energy storage
”,
Materials Chemistry and Physics
, Vol.
332
, p.
130288
, doi: .
Guo
,
J.
,
Merwin
,
A.
,
Benmore
,
C.J.
,
Mei
,
Z.G.
,
Hoyt
,
N.C.
and
Williamson
,
M.A.
(
2019
), “
Fluid structure of molten LiCl-Li solutions
”,
The Journal of Physical Chemistry B
, Vol.
123
No.
47
, pp.
10036
-
10043
, doi: .
Guo
,
S.
,
Zhang
,
J.
,
Wu
,
W.
and
Zhou
,
W.
(
2018
), “
Corrosion in the molten fluoride and chloride salts and materials development for nuclear applications
”,
Progress in Materials Science
, Vol.
97
, pp.
448
-
487
, doi: .
Han
,
W.
,
Wang
,
W.
,
Zhang
,
Y.
,
Wang
,
Y.
,
Li
,
M.
and
Sun
,
Y.
(
2021
), “
Electrode reaction of Pr on Sn electrode and its electrochemical recovery from LiCl‐KCl molten salt
”,
International Journal of Energy Research
, Vol.
45
No.
6
, pp.
8577
-
8592
, doi: .
Harrington
,
G.
and
Sundheim
,
B.R.
(
2006
), “
Absorption spectra in molten salts
”,
Annals of the New York Academy of Sciences
, Vol.
79
No.
11
, pp.
950
-
970
, doi: .
Horvath
,
D.
and
Simpson
,
M.F.
(
2018
), “
Electrochemical monitoring of Ni corrosion induced by water in eutectic LiCl-KCl
”,
Journal of The Electrochemical Society
, Vol.
165
No.
5
, pp.
C226
-
C233
, doi: .
Huang
,
Q.
,
Lu
,
G.
,
Wang
,
J.
and
Yu
,
J.
(
2011
), “
Thermal decomposition mechanisms of MgCl2·6H2O and MgCl2·H2O
”,
Journal of Analytical and Applied Pyrolysis
, Vol.
91
No.
1
, pp.
159
-
164
, doi: .
Jiang
,
D.
,
Zhang
,
D.
,
Li
,
X.
,
Wang
,
S.
,
Wang
,
C.
,
Qin
,
H.
,
Guo
,
Y.
,
Tian
,
W.
,
Su
,
G.H.
and
Qiu
,
S.
(
2022
), “
Fluoride-salt-cooled high-temperature reactors: review of historical milestones, research status, challenges, and outlook
”,
Renewable and Sustainable Energy Reviews
, Vol.
161
, p.
112345
, doi: .
Li
,
S.
,
Che
,
Y.
,
Li
,
C.
,
Shu
,
Y.
,
He
,
J.
,
Yang
,
B.
and
Song
,
J.
(
2022
), “
Study on the electrochemical behavior of Mg and Al ions in LiCl-KCl melt and preparation of Mg-Al alloy
”,
Journal of Magnesium and Alloys
, Vol.
10
No.
3
, pp.
721
-
729
, doi: .
Liu
,
Q.
,
Chen
,
Y.
,
Dong
,
Z.
,
Yu
,
F.
,
Quan
,
M.
,
Liu
,
Y.
,
Ren
,
P.
,
Zhang
,
Z.
,
Wang
,
Y.
and
Liu
,
Y.
(
2023a
), “
Electrochemical separation of fission element neodymium using plumbum electrode from molten LiCl-KCl based on spent fuel reprocessing
”,
Progress in Nuclear Energy
, Vol.
163
, p.
104819
, doi: .
Liu
,
Y.
,
Bao
,
H.
,
Yang
,
J.
,
Fu
,
X.B.
,
Han
,
L.
,
Yang
,
J.
,
Ge
,
M.
,
Jiang
,
Z.
,
Huang
,
Y.Y.
,
Qian
,
Y.
,
Wang
,
J.Q.
,
Gao
,
Y.
and
Liu
,
H.T.
(
2023b
), “
Macroscopic synthesis of ligand-free subnanometer metal clusters via molten salt
”,
Chemistry of Materials
, Vol.
35
No.
15
, pp.
5832
-
5837
, doi: .
Liu
,
Y.
,
Song
,
Y.
,
Ai
,
H.
,
Shen
,
M.
,
Liu
,
H.
,
Zhao
,
S.
,
Liu
,
Y.
,
Fei
,
Z.
,
Fu
,
X.
and
Cheng
,
J.
(
2020
), “
Corrosion of Cr in molten salts with different fluoroacidity in the presence of CrF3
”,
Corrosion Science
, Vol.
169
, p.
108636
, doi: .
Merwin
,
A.
,
Phillips
,
W.C.
,
Williamson
,
M.A.
,
Willit
,
J.L.
,
Motsegood
,
P.N.
and
Chidambaram
,
D.
(
2016
), “
Presence of Li clusters in molten LiCl-Li
”,
Scientific Reports
, Vol.
6
No.
1
, p.
25435
, doi: .
Mullabaev
,
A.
,
Tkacheva
,
O.
,
Shishkin
,
V.
,
Kovrov
,
V.
,
Zaikov
,
Y.
,
Sukhanov
,
L.
and
Mochalov
,
Y.
(
2018
), “
Properties of the LiCl-KCl-Li2O system as operating medium for pyro-chemical reprocessing of spent nuclear fuel
”,
Journal of Nuclear Materials
, Vol.
500
, pp.
235
-
241
, doi: .
Nakai
,
I.
,
Shibai
,
Y.
and
Murakami
,
Y.
(
2001
), “
XANES study in the solid state reaction of Zr-Ni system
”,
Journal of Synchrotron Radiation
, Vol.
8
No.
2
, pp.
815
-
817
, doi: .
Ong
,
T.-C.
,
Sarvghad
,
M.
,
Lippiatt
,
K.
,
Griggs
,
L.
,
Ryan
,
H.
,
Will
,
G.
and
Steinberg
,
T.A.
(
2020
), “
Review of the solubility, monitoring, and purification of impurities in molten salts for energy storage in concentrated solar power plants
”,
Renewable and Sustainable Energy Reviews
, Vol.
131
, p.
110006
, doi: .
Ravel
,
B.
and
Newville
,
M.
(
2005
), “
ATHENA, ARTEMIS, HEPHAESTUS: data analysis for X-ray absorption spectroscopy using IFEFFIT
”,
Journal of Synchrotron Radiation
, Vol.
12
No.
4
, pp.
537
-
541
, doi: .
Ravi Shankar
,
A.
and
Kamachi Mudali
,
U.
(
2017
), “
Corrosion of nickel alloys in molten LiCl-KCl medium under Cl2 bubbling
”,
Corrosion
, Vol.
74
No.
2
, pp.
249
-
259
, doi: .
Rehr
,
J.J.
,
Kas
,
J.J.
,
Vila
,
F.D.
,
Prange
,
M.P.
and
Jorissen
,
K.
(
2010
), “
Parameter-free calculations of X-ray spectra with FEFF9
”,
Physical Chemistry Chemical Physics
, Vol.
12
No
21
, pp.
5503
-
5513
, doi: .
Rong
,
Z.
,
Ye
,
Y.
,
Ding
,
J.
and
Qiao
,
F.
(
2024
), “
Thermal stability mechanism and operating temperature limit of molten chloride salts for thermal energy storage and concentrated solar power applications
”,
Renewable Energy
, Vol.
231
, p.
121037
, doi: .
Salyulev
,
A.
,
Potapov
,
A.
,
Khokhlov
,
V.
and
Shishkin
,
V.
(
2017
), “
The electrical conductivity of model melts based on LiCl-KCl, used for the processing of spent nuclear fuel
”,
Electrochimica Acta
, Vol.
257
, pp.
510
-
515
, doi: .
Sankar
,
K.M.
and
Singh
,
P.M.
(
2021
), “
Effect of Li metal addition on corrosion control of hastelloy N and stainless steel 316H in molten LiF-NaF-KF
”,
Journal of Nuclear Materials
, Vol.
555
, p.
153098
, doi: .
Shankar
,
A.R.
,
Kanagasundar
,
A.
and
Mudali
,
U.K.
(
2013
), “
Corrosion of nickel-containing alloys in molten LiCl-KCl medium
”,
Corrosion
, Vol.
69
No.
1
, pp.
48
-
57
, doi: .
Shen
,
M.
,
Jiang
,
W.
,
Liang
,
K.
,
Zhao
,
S.
,
Tang
,
R.
,
Zhang
,
L.
and
Wang
,
J.Q.
(
2021
), “
One-pot green process to synthesize MXene with controllable surface terminations using molten salts
”,
Angewandte Chemie International Edition
, Vol.
60
No.
52
, pp.
27013
-
27018
, doi: .
Sun
,
H.
,
Wang
,
J.Q.
,
Tang
,
Z.
,
Liu
,
Y.
and
Wang
,
C.
(
2020
), “
Assessment of effects of Mg treatment on corrosivity of molten NaCl-KCl-MgCl2 salt with raman and infrared spectra
”,
Corrosion Science
, Vol.
164
, p.
108350
, doi: .
Sun
,
H.
,
Zhang
,
P.
and
Wang
,
J.
(
2018a
), “
Effects of alloying elements on the corrosion behavior of Ni-based alloys in molten NaCl-KCl-MgCl2 salt at different temperatures
”,
Corrosion Science
, Vol.
143
, pp.
187
-
199
, doi: .
Sun
,
H.
,
Wang
,
J.
,
Li
,
Z.
,
Zhang
,
P.
and
Su
,
X.
(
2018b
), “
Corrosion behavior of 316SS and Ni-based alloys in a ternary NaCl-KCl-MgCl2 molten salt
”,
Solar Energy
, Vol.
171
, pp.
320
-
329
, doi: .
Wang
,
C.
,
Xu
,
X.
,
Tong
,
Y.
,
Zhou
,
W.
and
Wang
,
Y.
(
2025
), “
O2- affected corrosion of nickel-based alloy in LiCl-KCl molten salt for pyroprocessing of spent nuclear fuel
”,
Journal of Nuclear Materials
, Vol.
610
, p.
155773
, doi: .
Wang
,
Y.
,
Goh
,
B.
,
Nelaturu
,
P.
,
Duong
,
T.
,
Hassan
,
N.
,
David
,
R.
,
Moorehead
,
M.
,
Chaudhuri
,
S.
,
Creuziger
,
A.
,
Hattrick-Simpers
,
J.
,
Thoma
,
D.J.
,
Sridharan
,
K.
and
Couet
,
A.
(
2022
), “
Integrated high-throughput and machine learning methods to accelerate discovery of molten salt corrosion-resistant alloys
”,
Advanced Science
, Vol.
9
No.
20
, p.
2200370
, doi: .
Xi
,
X.
,
Wang
,
J.
,
Zhang
,
J.
,
Li
,
W.
,
Ning
,
S.
,
Jiang
,
T.
,
Wei
,
Y.
and
Han
,
W.
(
2024
), “
Electrochemical behavior and separation of Ce(III) in LiCl-KCl molten salt
”,
Separation and Purification Technology
, Vol.
334
, p.
125931
, doi: .
Yamamoto
,
T.
(
2008
), “
Assignment of pre‐edge peaks in K‐edge X‐ray absorption spectra of 3d transition metal compounds: electric dipole or quadrupole?
”,
X-Ray Spectrometry
, Vol.
37
No.
6
, pp.
572
-
584
, doi: .
Yang
,
M.C.
,
Zhong
,
Y.K.
,
Wang
,
D.D.
,
Wang
,
L.
,
Jiang
,
S.L.
,
Zhang
,
T.
,
Yan
,
Y.D.
,
Liu
,
Y.L.
and
Shi
,
W.Q.
(
2024
), “
Rapid and efficient extraction of cerium by forming Al-Ce alloys in LiCl-KCl molten salts
”,
Separation and Purification Technology
, Vol.
341
, p.
126868
, doi: .
Yu
,
C.C.
,
Chiang
,
K.Y.
,
Okuno
,
M.
,
Seki
,
T.
,
Ohto
,
T.
,
Yu
,
X.
,
Korepanov
,
V.
,
Hamaguchi
,
H.O.
,
Bonn
,
M.
,
Hunger
,
J.
and
Nagata
,
Y.
(
2020
), “
Vibrational couplings and energy transfer pathways of water’s bending mode
”,
Nature Communications
, Vol.
11
No.
1
, p.
5977
, doi: .
Zhang
,
J.
,
Forsberg
,
C.W.
,
Simpson
,
M.F.
,
Guo
,
S.
,
Lam
,
S.T.
,
Scarlat
,
R.O.
,
Carotti
,
F.
,
Chan
,
K.J.
,
Singh
,
P.M.
,
Doniger
,
W.
,
Sridharan
,
K.
and
Keiser
,
J.R.
(
2018
), “
Redox potential control in molten salt systems for corrosion mitigation
”,
Corrosion Science
, Vol.
144
, pp.
44
-
53
, doi: .
Zhou
,
X.
,
Yan
,
S.
,
He
,
X.
,
Zhou
,
H.
,
Ning
,
J.
,
Li
,
H.
,
Wang
,
K.
and
Jiang
,
K.
(
2023
), “
Low-temperature, high cycling stability, and high coulombic efficiency liquid metal batteries enabled by lithium halide-potassium halide molten salt electrolytes
”,
Energy Storage Materials
, Vol.
61
, p.
102889
, doi: .

The supplementary material for this article can be found online.

Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at Link to the terms of the CC BY 4.0 licenceLink to the terms of the CC BY 4.0 licence.

Supplementary data

Data & Figures

Graphical abstract
A schematic showing reactions in L i C l K C l and L i C l K C l L i systems, where H 2 O forms H plus and H 2, and N i 2 plus interacts with O 2 minus near a surface.The schematic shows two sections labelled L i C l K C l and L i C l K C l L i. H 2 O is shown at the top with an arrow pointing downward. In the L i C l K C l section, N i 2 plus interacts with O 2 minus near a surface layer. Arrows indicate movement between species. H plus is shown moving toward the surface. In the L i C l K C l L i section, metallic L i is shown as clusters. Arrows indicate formation of H 2 from H 2 O near the surface. The surface is represented by a structured layer with embedded particles.
Graphical abstract
A schematic showing reactions in L i C l K C l and L i C l K C l L i systems, where H 2 O forms H plus and H 2, and N i 2 plus interacts with O 2 minus near a surface.The schematic shows two sections labelled L i C l K C l and L i C l K C l L i. H 2 O is shown at the top with an arrow pointing downward. In the L i C l K C l section, N i 2 plus interacts with O 2 minus near a surface layer. Arrows indicate movement between species. H plus is shown moving toward the surface. In the L i C l K C l L i section, metallic L i is shown as clusters. Arrows indicate formation of H 2 from H 2 O near the surface. The surface is represented by a structured layer with embedded particles.
Close Graphical abstract
Figure 1
A flow diagram of L i C l and K C l processing with L I shows heating and cooling steps forming liquid and solid mixtures, and undissolved Li separation.The diagram presents a sequence of laboratory steps involving Li C l and K C l with L i. The top row shows L i C l plus K C l in a container, followed by heating to form liquid L i C l K C l, then cooling to obtain solid L i C l K C l, alongside a separate Li sheet. The lower row shows L i C l K C l plus L i heated to form a liquid mixture in a vessel. A step labelled undissolved Li appears with arrows indicating separation. Cooling then produces a solid mixture labelled L i C l K C l L i.

Preparation flow chart for LiCl-KCl and LiCl-KCl-Li samples

Figure 1
A flow diagram of L i C l and K C l processing with L I shows heating and cooling steps forming liquid and solid mixtures, and undissolved Li separation.The diagram presents a sequence of laboratory steps involving Li C l and K C l with L i. The top row shows L i C l plus K C l in a container, followed by heating to form liquid L i C l K C l, then cooling to obtain solid L i C l K C l, alongside a separate Li sheet. The lower row shows L i C l K C l plus L i heated to form a liquid mixture in a vessel. A step labelled undissolved Li appears with arrows indicating separation. Cooling then produces a solid mixture labelled L i C l K C l L i.

Preparation flow chart for LiCl-KCl and LiCl-KCl-Li samples

Close Figure 1
Figure 2
Two plots show diffraction patterns and hydrogen peak, comparing L i C l K C l and L i added samples, with similar peak positions and increased hydrogen signal intensity.The two panels are labelled a and b. Panel a presents intensity versus 2 theta from 20 to 90 degrees for three samples labelled L i C l K C l, L i C l K C l L i 500, and L i C l K C l L i 600. Multiple sharp peaks appear across the range, with similar peak positions among all samples and reference markers for K C l P D F 75 minus 0296 and L i C l P D F 04 minus 0664 displayed below. Panel b shows intensity versus time in minutes from 0.5 to 2.0 with a labelled H 2 peak near 1.2 minutes. Two curves for L i C l K C l L i 500 and L i C l K C l L i 600 rise to a single peak and return to baseline, with the peak for L i C l K C l L i 600 higher than that for L i C l K C l L i 500, while L i C l K C l remains near baseline.

(a) XRD patterns of solid LiCl-KCl, LiCl-KCl-Li_500 and LiCl-KCl-Li_600 samples; (b) GC data for the gas from the reaction between solid LiCl-KCl, LiCl-KCl-Li_500 and LiCl-KCl-Li_600 with deionized water, respectively

Figure 2
Two plots show diffraction patterns and hydrogen peak, comparing L i C l K C l and L i added samples, with similar peak positions and increased hydrogen signal intensity.The two panels are labelled a and b. Panel a presents intensity versus 2 theta from 20 to 90 degrees for three samples labelled L i C l K C l, L i C l K C l L i 500, and L i C l K C l L i 600. Multiple sharp peaks appear across the range, with similar peak positions among all samples and reference markers for K C l P D F 75 minus 0296 and L i C l P D F 04 minus 0664 displayed below. Panel b shows intensity versus time in minutes from 0.5 to 2.0 with a labelled H 2 peak near 1.2 minutes. Two curves for L i C l K C l L i 500 and L i C l K C l L i 600 rise to a single peak and return to baseline, with the peak for L i C l K C l L i 600 higher than that for L i C l K C l L i 500, while L i C l K C l remains near baseline.

(a) XRD patterns of solid LiCl-KCl, LiCl-KCl-Li_500 and LiCl-KCl-Li_600 samples; (b) GC data for the gas from the reaction between solid LiCl-KCl, LiCl-KCl-Li_500 and LiCl-KCl-Li_600 with deionized water, respectively

Close Figure 2
Figure 3
Two panels of flake-like material labelled a and b, each with an inset sample piece, show irregular layered fragments with similar shapes.The flake-like material is spread on a surface. The flakes are thin and irregular with layered fragments. Panel a shows loosely dispersed flakes, while panel b shows more clustered flakes. Each panel includes a right-side inset of a rectangular sample piece with a rough surface texture.

(a) Physical photo of the LiCl-KCl-Li-Ni_600 sample collected on the seventh day; (b) Physical photo of the LiCl-KCl-Ni_600 sample collected on the seventh day; Inset is the corresponding nickel metal sheet that has been cleaned after the reaction

Figure 3
Two panels of flake-like material labelled a and b, each with an inset sample piece, show irregular layered fragments with similar shapes.The flake-like material is spread on a surface. The flakes are thin and irregular with layered fragments. Panel a shows loosely dispersed flakes, while panel b shows more clustered flakes. Each panel includes a right-side inset of a rectangular sample piece with a rough surface texture.

(a) Physical photo of the LiCl-KCl-Li-Ni_600 sample collected on the seventh day; (b) Physical photo of the LiCl-KCl-Ni_600 sample collected on the seventh day; Inset is the corresponding nickel metal sheet that has been cleaned after the reaction

Close Figure 3
Figure 4
A spectral plot of intensity versus wavelength for three samples shows decreasing trends, with one sample having higher intensity and visible variation across the range.The plot of intensity versus wavelength from 250 to 850 nanometres for three samples is labelled L i C l K C l L i 600, L i C l K C l N i 600, and L i C l K C l L i N i 600. One curve starts at high intensity near 250 nanometres, drops sharply by around 350 nanometres, then shows a broad variation before gradually decreasing toward 850 nanometres. The other two curves start at lower intensity and decrease smoothly across the wavelength range. Three inset images above the plot show containers holding each sample.

UV-vis spectra of liquid LiCl-KCl-Li_600 (black), LiCl-KCl-Li-Ni_600 (red) and LiCl-KCl-Ni_600 (blue) at 600°C with corresponding physical photos

Figure 4
A spectral plot of intensity versus wavelength for three samples shows decreasing trends, with one sample having higher intensity and visible variation across the range.The plot of intensity versus wavelength from 250 to 850 nanometres for three samples is labelled L i C l K C l L i 600, L i C l K C l N i 600, and L i C l K C l L i N i 600. One curve starts at high intensity near 250 nanometres, drops sharply by around 350 nanometres, then shows a broad variation before gradually decreasing toward 850 nanometres. The other two curves start at lower intensity and decrease smoothly across the wavelength range. Three inset images above the plot show containers holding each sample.

UV-vis spectra of liquid LiCl-KCl-Li_600 (black), LiCl-KCl-Li-Ni_600 (red) and LiCl-KCl-Ni_600 (blue) at 600°C with corresponding physical photos

Close Figure 4
Figure 5
Four plots show diffraction, absorption, and spectral analyses for L i C l K C l N i samples and references, indicating similar peak patterns with variation across measurements.The four panels are labelled a, b, c, and d. Panel a shows intensity versus 2 theta from 20 to 90 degrees for L i C l K C l N i 600 and L i C l K C l L i N i 600, with multiple sharp peaks and reference markers for K C l P D F 75 minus 0296 and L i C l P D F 04 minus 0664. Panel b shows absorption coefficient versus photon energy from 8330 to 8390 electron volt for N i foil, N i C l 2, N i O, and L i C l K C l N i 600, with curves rising to peaks near mid-range and then decreasing. Panel c shows k cubed chi of k versus k from 0 to 12 per angstrom cubed for N i O, L i C l K C l N i 600, and N i C l 2, with oscillatory patterns of varying amplitude. Panel d shows F T magnitude versus R from 0 to 6 angstrom for the same three samples, with peaks at different positions and heights.

(a) XRD patterns of LiCl-KCl-Li-Ni_600 and LiCl-KCl-Ni_600; (b) The Ni K-edge XANES spectra of Ni foil, NiCl2, NiO and LiCl-KCl-Ni_600; (c) The Ni K-edge k3-weighted EXAFS oscillations for NiCl2, NiO and LiCl-KCl-Ni_600; (d) Fourier transform of k3-weighted EXAFS data for NiCl2, NiO and LiCl-KCl-Ni_600

Figure 5
Four plots show diffraction, absorption, and spectral analyses for L i C l K C l N i samples and references, indicating similar peak patterns with variation across measurements.The four panels are labelled a, b, c, and d. Panel a shows intensity versus 2 theta from 20 to 90 degrees for L i C l K C l N i 600 and L i C l K C l L i N i 600, with multiple sharp peaks and reference markers for K C l P D F 75 minus 0296 and L i C l P D F 04 minus 0664. Panel b shows absorption coefficient versus photon energy from 8330 to 8390 electron volt for N i foil, N i C l 2, N i O, and L i C l K C l N i 600, with curves rising to peaks near mid-range and then decreasing. Panel c shows k cubed chi of k versus k from 0 to 12 per angstrom cubed for N i O, L i C l K C l N i 600, and N i C l 2, with oscillatory patterns of varying amplitude. Panel d shows F T magnitude versus R from 0 to 6 angstrom for the same three samples, with peaks at different positions and heights.

(a) XRD patterns of LiCl-KCl-Li-Ni_600 and LiCl-KCl-Ni_600; (b) The Ni K-edge XANES spectra of Ni foil, NiCl2, NiO and LiCl-KCl-Ni_600; (c) The Ni K-edge k3-weighted EXAFS oscillations for NiCl2, NiO and LiCl-KCl-Ni_600; (d) Fourier transform of k3-weighted EXAFS data for NiCl2, NiO and LiCl-KCl-Ni_600

Close Figure 5
Figure 6
Six microscopy images show surface morphology and elemental maps for N i and O, comparing two samples with different texture patterns and distribution density.The six panels are labelled a to f, each with a scale bar of 25 micrometres. Panels a and d show surface morphology images with irregular, layered textures and rough features. Panels b and e show N i elemental maps with dense and continuous distributions across the surfaces. Panels c and f show O elemental maps with scattered and clustered distributions, with panel f appearing more densely populated than panel c.

Surface morphologies and EDS elemental mappings of the Ni sheet after reacting with LiCl-KCl (a,b,c) and LiCl-KCl-Li (d,e,f) at 600°C for 7 days

Figure 6
Six microscopy images show surface morphology and elemental maps for N i and O, comparing two samples with different texture patterns and distribution density.The six panels are labelled a to f, each with a scale bar of 25 micrometres. Panels a and d show surface morphology images with irregular, layered textures and rough features. Panels b and e show N i elemental maps with dense and continuous distributions across the surfaces. Panels c and f show O elemental maps with scattered and clustered distributions, with panel f appearing more densely populated than panel c.

Surface morphologies and EDS elemental mappings of the Ni sheet after reacting with LiCl-KCl (a,b,c) and LiCl-KCl-Li (d,e,f) at 600°C for 7 days

Close Figure 6
Figure 7
Infrared spectra of four samples plotted as intensity versus wavenumber show similar absorption features with varying depth across the range from 4000 to 1000 per centimetre.The plot shows intensity versus wavenumber from 4000 to 1000 per centimetre for four samples labelled L i C l K C l 600, L i C l K C l L i 600, L i C l K C l N i 600, and L i C l K C l L i N i 600. All curves display broad decreases in intensity near higher wavenumber regions around 3500, followed by recovery toward mid-range. A sharp decrease appears near 1600, after which intensity rises again toward lower wavenumbers. The depth of these features varies among the four samples while maintaining similar positions.

IR spectra of LiCl-KCl, LiCl-KCl-Li_600, LiCl-KCl-Ni_600 and LiCl-KCl-Li-Ni_600

Figure 7
Infrared spectra of four samples plotted as intensity versus wavenumber show similar absorption features with varying depth across the range from 4000 to 1000 per centimetre.The plot shows intensity versus wavenumber from 4000 to 1000 per centimetre for four samples labelled L i C l K C l 600, L i C l K C l L i 600, L i C l K C l N i 600, and L i C l K C l L i N i 600. All curves display broad decreases in intensity near higher wavenumber regions around 3500, followed by recovery toward mid-range. A sharp decrease appears near 1600, after which intensity rises again toward lower wavenumbers. The depth of these features varies among the four samples while maintaining similar positions.

IR spectra of LiCl-KCl, LiCl-KCl-Li_600, LiCl-KCl-Ni_600 and LiCl-KCl-Li-Ni_600

Close Figure 7
Table 1

Structural parameters derived from the EXAFS curve-fitting for NiCl2, NiO and LiCl-KCl-Ni_600

SamplePathNRσ2 (10–3 Å2)ΔE0 (eV)
NiONi-O6.02.09 ± 0.017.5 ± 0.9−4.0
Ni-Ni12.02.95 ± 0.026.9 ± 0.3−7.0
NiCl2Ni-Cl6.0 ± 0.52.39 ± 0.0110.0 ± 0.71.5
Ni-Ni5.7 ± 1.03.45 ± 0.0214.5 ± 1.0−1.0
LiCl-KCl-Ni_600Ni-O2.5 ± 0.42.04 ± 0.015.1 ± 1.66.0
Ni-Cl5.0 ± 0.52.35 ± 0.029.4 ± 1.0−8.5

Supplements

Supplementary data

References

Choi
,
W.
,
Cho
,
S.
and
Lee
,
J.
(
2024
), “
Feasibility of clearance level electrolytic decontamination of simulated radioactive ni-based alloy
”,
Electrochimica Acta
, Vol.
494
, p.
144473
, doi: .
Cisneros
,
T.
,
Wargon
,
M.
,
Harper
,
B.
,
Hanselman
,
K.
,
Kawano
,
T.
,
Kuvin
,
S.A.
and
Lee
,
H.Y.
(
2024
), “
Reactivity impact of updated 35Cl nuclear data on the molten chloride reactor experiment
”,
Nuclear Science and Engineering
, Vol.
200
No.
sup1
, pp.
1
-
11
, doi: .
Cui
,
K.
,
Zhao
,
W.
,
Li
,
S.
,
Zhou
,
D.
,
Liu
,
C.
,
Qu
,
X.
and
Li
,
P.
(
2022
), “
Low-temperature and high-energy-density Li-based liquid metal batteries based on LiCl-KCl molten salt electrolyte
”,
ACS Sustainable Chemistry & Engineering
, Vol.
10
No.
5
, pp.
1871
-
1879
, doi: .
Ding
,
W.
,
Gomez-Vidal
,
J.
,
Bonk
,
A.
and
Bauer
,
T.
(
2019a
), “
Molten chloride salts for next generation CSP plants: electrolytical salt purification for reducing corrosive impurity level
”,
Solar Energy Materials and Solar Cells
, Vol.
199
, pp.
8
-
15
, doi: .
Ding
,
W.
,
Shi
,
H.
,
Jianu
,
A.
,
Xiu
,
Y.
,
Bonk
,
A.
,
Weisenburger
,
A.
and
Bauer
,
T.
(
2019b
), “
Molten chloride salts for next generation concentrated solar power plants: mitigation strategies against corrosion of structural materials
”,
Solar Energy Materials and Solar Cells
, Vol.
193
, pp.
298
-
313
, doi: .
Ding
,
W.
and
Bauer
,
T.
(
2021
), “
Progress in research and development of molten chloride salt technology for next generation concentrated solar power plants
”,
Engineering
, Vol.
7
No.
3
, pp.
334
-
347
, doi: .
Ding
,
W.
,
Bonk
,
A.
and
Bauer
,
T.
(
2018
), “
Corrosion behavior of metallic alloys in molten chloride salts for thermal energy storage in concentrated solar power plants: a review
”,
Frontiers of Chemical Science and Engineering
, Vol.
12
No.
3
, pp.
564
-
576
, doi: .
Fan
,
X.
,
Zheng
,
W.T.
,
Kuo
,
J.L.
and
Singh
,
D.J.
(
2013
), “
Adsorption of single Li and the formation of small Li clusters on graphene for the anode of lithium-ion batteries
”,
ACS Applied Materials & Interfaces
, Vol.
5
No.
16
, pp.
7793
-
7797
, doi: .
Gao
,
B.
,
Yu
,
R.
,
Chen
,
S.
,
Hu
,
H.
,
Wu
,
K.
and
Zhang
,
X.
(
2025
), “
Corrosion behavior of surface-modified Ni-based alloys in molten NaCl-KCl for thermal energy storage
”,
Materials Chemistry and Physics
, Vol.
332
, p.
130288
, doi: .
Guo
,
J.
,
Merwin
,
A.
,
Benmore
,
C.J.
,
Mei
,
Z.G.
,
Hoyt
,
N.C.
and
Williamson
,
M.A.
(
2019
), “
Fluid structure of molten LiCl-Li solutions
”,
The Journal of Physical Chemistry B
, Vol.
123
No.
47
, pp.
10036
-
10043
, doi: .
Guo
,
S.
,
Zhang
,
J.
,
Wu
,
W.
and
Zhou
,
W.
(
2018
), “
Corrosion in the molten fluoride and chloride salts and materials development for nuclear applications
”,
Progress in Materials Science
, Vol.
97
, pp.
448
-
487
, doi: .
Han
,
W.
,
Wang
,
W.
,
Zhang
,
Y.
,
Wang
,
Y.
,
Li
,
M.
and
Sun
,
Y.
(
2021
), “
Electrode reaction of Pr on Sn electrode and its electrochemical recovery from LiCl‐KCl molten salt
”,
International Journal of Energy Research
, Vol.
45
No.
6
, pp.
8577
-
8592
, doi: .
Harrington
,
G.
and
Sundheim
,
B.R.
(
2006
), “
Absorption spectra in molten salts
”,
Annals of the New York Academy of Sciences
, Vol.
79
No.
11
, pp.
950
-
970
, doi: .
Horvath
,
D.
and
Simpson
,
M.F.
(
2018
), “
Electrochemical monitoring of Ni corrosion induced by water in eutectic LiCl-KCl
”,
Journal of The Electrochemical Society
, Vol.
165
No.
5
, pp.
C226
-
C233
, doi: .
Huang
,
Q.
,
Lu
,
G.
,
Wang
,
J.
and
Yu
,
J.
(
2011
), “
Thermal decomposition mechanisms of MgCl2·6H2O and MgCl2·H2O
”,
Journal of Analytical and Applied Pyrolysis
, Vol.
91
No.
1
, pp.
159
-
164
, doi: .
Jiang
,
D.
,
Zhang
,
D.
,
Li
,
X.
,
Wang
,
S.
,
Wang
,
C.
,
Qin
,
H.
,
Guo
,
Y.
,
Tian
,
W.
,
Su
,
G.H.
and
Qiu
,
S.
(
2022
), “
Fluoride-salt-cooled high-temperature reactors: review of historical milestones, research status, challenges, and outlook
”,
Renewable and Sustainable Energy Reviews
, Vol.
161
, p.
112345
, doi: .
Li
,
S.
,
Che
,
Y.
,
Li
,
C.
,
Shu
,
Y.
,
He
,
J.
,
Yang
,
B.
and
Song
,
J.
(
2022
), “
Study on the electrochemical behavior of Mg and Al ions in LiCl-KCl melt and preparation of Mg-Al alloy
”,
Journal of Magnesium and Alloys
, Vol.
10
No.
3
, pp.
721
-
729
, doi: .
Liu
,
Q.
,
Chen
,
Y.
,
Dong
,
Z.
,
Yu
,
F.
,
Quan
,
M.
,
Liu
,
Y.
,
Ren
,
P.
,
Zhang
,
Z.
,
Wang
,
Y.
and
Liu
,
Y.
(
2023a
), “
Electrochemical separation of fission element neodymium using plumbum electrode from molten LiCl-KCl based on spent fuel reprocessing
”,
Progress in Nuclear Energy
, Vol.
163
, p.
104819
, doi: .
Liu
,
Y.
,
Bao
,
H.
,
Yang
,
J.
,
Fu
,
X.B.
,
Han
,
L.
,
Yang
,
J.
,
Ge
,
M.
,
Jiang
,
Z.
,
Huang
,
Y.Y.
,
Qian
,
Y.
,
Wang
,
J.Q.
,
Gao
,
Y.
and
Liu
,
H.T.
(
2023b
), “
Macroscopic synthesis of ligand-free subnanometer metal clusters via molten salt
”,
Chemistry of Materials
, Vol.
35
No.
15
, pp.
5832
-
5837
, doi: .
Liu
,
Y.
,
Song
,
Y.
,
Ai
,
H.
,
Shen
,
M.
,
Liu
,
H.
,
Zhao
,
S.
,
Liu
,
Y.
,
Fei
,
Z.
,
Fu
,
X.
and
Cheng
,
J.
(
2020
), “
Corrosion of Cr in molten salts with different fluoroacidity in the presence of CrF3
”,
Corrosion Science
, Vol.
169
, p.
108636
, doi: .
Merwin
,
A.
,
Phillips
,
W.C.
,
Williamson
,
M.A.
,
Willit
,
J.L.
,
Motsegood
,
P.N.
and
Chidambaram
,
D.
(
2016
), “
Presence of Li clusters in molten LiCl-Li
”,
Scientific Reports
, Vol.
6
No.
1
, p.
25435
, doi: .
Mullabaev
,
A.
,
Tkacheva
,
O.
,
Shishkin
,
V.
,
Kovrov
,
V.
,
Zaikov
,
Y.
,
Sukhanov
,
L.
and
Mochalov
,
Y.
(
2018
), “
Properties of the LiCl-KCl-Li2O system as operating medium for pyro-chemical reprocessing of spent nuclear fuel
”,
Journal of Nuclear Materials
, Vol.
500
, pp.
235
-
241
, doi: .
Nakai
,
I.
,
Shibai
,
Y.
and
Murakami
,
Y.
(
2001
), “
XANES study in the solid state reaction of Zr-Ni system
”,
Journal of Synchrotron Radiation
, Vol.
8
No.
2
, pp.
815
-
817
, doi: .
Ong
,
T.-C.
,
Sarvghad
,
M.
,
Lippiatt
,
K.
,
Griggs
,
L.
,
Ryan
,
H.
,
Will
,
G.
and
Steinberg
,
T.A.
(
2020
), “
Review of the solubility, monitoring, and purification of impurities in molten salts for energy storage in concentrated solar power plants
”,
Renewable and Sustainable Energy Reviews
, Vol.
131
, p.
110006
, doi: .
Ravel
,
B.
and
Newville
,
M.
(
2005
), “
ATHENA, ARTEMIS, HEPHAESTUS: data analysis for X-ray absorption spectroscopy using IFEFFIT
”,
Journal of Synchrotron Radiation
, Vol.
12
No.
4
, pp.
537
-
541
, doi: .
Ravi Shankar
,
A.
and
Kamachi Mudali
,
U.
(
2017
), “
Corrosion of nickel alloys in molten LiCl-KCl medium under Cl2 bubbling
”,
Corrosion
, Vol.
74
No.
2
, pp.
249
-
259
, doi: .
Rehr
,
J.J.
,
Kas
,
J.J.
,
Vila
,
F.D.
,
Prange
,
M.P.
and
Jorissen
,
K.
(
2010
), “
Parameter-free calculations of X-ray spectra with FEFF9
”,
Physical Chemistry Chemical Physics
, Vol.
12
No
21
, pp.
5503
-
5513
, doi: .
Rong
,
Z.
,
Ye
,
Y.
,
Ding
,
J.
and
Qiao
,
F.
(
2024
), “
Thermal stability mechanism and operating temperature limit of molten chloride salts for thermal energy storage and concentrated solar power applications
”,
Renewable Energy
, Vol.
231
, p.
121037
, doi: .
Salyulev
,
A.
,
Potapov
,
A.
,
Khokhlov
,
V.
and
Shishkin
,
V.
(
2017
), “
The electrical conductivity of model melts based on LiCl-KCl, used for the processing of spent nuclear fuel
”,
Electrochimica Acta
, Vol.
257
, pp.
510
-
515
, doi: .
Sankar
,
K.M.
and
Singh
,
P.M.
(
2021
), “
Effect of Li metal addition on corrosion control of hastelloy N and stainless steel 316H in molten LiF-NaF-KF
”,
Journal of Nuclear Materials
, Vol.
555
, p.
153098
, doi: .
Shankar
,
A.R.
,
Kanagasundar
,
A.
and
Mudali
,
U.K.
(
2013
), “
Corrosion of nickel-containing alloys in molten LiCl-KCl medium
”,
Corrosion
, Vol.
69
No.
1
, pp.
48
-
57
, doi: .
Shen
,
M.
,
Jiang
,
W.
,
Liang
,
K.
,
Zhao
,
S.
,
Tang
,
R.
,
Zhang
,
L.
and
Wang
,
J.Q.
(
2021
), “
One-pot green process to synthesize MXene with controllable surface terminations using molten salts
”,
Angewandte Chemie International Edition
, Vol.
60
No.
52
, pp.
27013
-
27018
, doi: .
Sun
,
H.
,
Wang
,
J.Q.
,
Tang
,
Z.
,
Liu
,
Y.
and
Wang
,
C.
(
2020
), “
Assessment of effects of Mg treatment on corrosivity of molten NaCl-KCl-MgCl2 salt with raman and infrared spectra
”,
Corrosion Science
, Vol.
164
, p.
108350
, doi: .
Sun
,
H.
,
Zhang
,
P.
and
Wang
,
J.
(
2018a
), “
Effects of alloying elements on the corrosion behavior of Ni-based alloys in molten NaCl-KCl-MgCl2 salt at different temperatures
”,
Corrosion Science
, Vol.
143
, pp.
187
-
199
, doi: .
Sun
,
H.
,
Wang
,
J.
,
Li
,
Z.
,
Zhang
,
P.
and
Su
,
X.
(
2018b
), “
Corrosion behavior of 316SS and Ni-based alloys in a ternary NaCl-KCl-MgCl2 molten salt
”,
Solar Energy
, Vol.
171
, pp.
320
-
329
, doi: .
Wang
,
C.
,
Xu
,
X.
,
Tong
,
Y.
,
Zhou
,
W.
and
Wang
,
Y.
(
2025
), “
O2- affected corrosion of nickel-based alloy in LiCl-KCl molten salt for pyroprocessing of spent nuclear fuel
”,
Journal of Nuclear Materials
, Vol.
610
, p.
155773
, doi: .
Wang
,
Y.
,
Goh
,
B.
,
Nelaturu
,
P.
,
Duong
,
T.
,
Hassan
,
N.
,
David
,
R.
,
Moorehead
,
M.
,
Chaudhuri
,
S.
,
Creuziger
,
A.
,
Hattrick-Simpers
,
J.
,
Thoma
,
D.J.
,
Sridharan
,
K.
and
Couet
,
A.
(
2022
), “
Integrated high-throughput and machine learning methods to accelerate discovery of molten salt corrosion-resistant alloys
”,
Advanced Science
, Vol.
9
No.
20
, p.
2200370
, doi: .
Xi
,
X.
,
Wang
,
J.
,
Zhang
,
J.
,
Li
,
W.
,
Ning
,
S.
,
Jiang
,
T.
,
Wei
,
Y.
and
Han
,
W.
(
2024
), “
Electrochemical behavior and separation of Ce(III) in LiCl-KCl molten salt
”,
Separation and Purification Technology
, Vol.
334
, p.
125931
, doi: .
Yamamoto
,
T.
(
2008
), “
Assignment of pre‐edge peaks in K‐edge X‐ray absorption spectra of 3d transition metal compounds: electric dipole or quadrupole?
”,
X-Ray Spectrometry
, Vol.
37
No.
6
, pp.
572
-
584
, doi: .
Yang
,
M.C.
,
Zhong
,
Y.K.
,
Wang
,
D.D.
,
Wang
,
L.
,
Jiang
,
S.L.
,
Zhang
,
T.
,
Yan
,
Y.D.
,
Liu
,
Y.L.
and
Shi
,
W.Q.
(
2024
), “
Rapid and efficient extraction of cerium by forming Al-Ce alloys in LiCl-KCl molten salts
”,
Separation and Purification Technology
, Vol.
341
, p.
126868
, doi: .
Yu
,
C.C.
,
Chiang
,
K.Y.
,
Okuno
,
M.
,
Seki
,
T.
,
Ohto
,
T.
,
Yu
,
X.
,
Korepanov
,
V.
,
Hamaguchi
,
H.O.
,
Bonn
,
M.
,
Hunger
,
J.
and
Nagata
,
Y.
(
2020
), “
Vibrational couplings and energy transfer pathways of water’s bending mode
”,
Nature Communications
, Vol.
11
No.
1
, p.
5977
, doi: .
Zhang
,
J.
,
Forsberg
,
C.W.
,
Simpson
,
M.F.
,
Guo
,
S.
,
Lam
,
S.T.
,
Scarlat
,
R.O.
,
Carotti
,
F.
,
Chan
,
K.J.
,
Singh
,
P.M.
,
Doniger
,
W.
,
Sridharan
,
K.
and
Keiser
,
J.R.
(
2018
), “
Redox potential control in molten salt systems for corrosion mitigation
”,
Corrosion Science
, Vol.
144
, pp.
44
-
53
, doi: .
Zhou
,
X.
,
Yan
,
S.
,
He
,
X.
,
Zhou
,
H.
,
Ning
,
J.
,
Li
,
H.
,
Wang
,
K.
and
Jiang
,
K.
(
2023
), “
Low-temperature, high cycling stability, and high coulombic efficiency liquid metal batteries enabled by lithium halide-potassium halide molten salt electrolytes
”,
Energy Storage Materials
, Vol.
61
, p.
102889
, doi: .

Languages

or Create an Account

Close subscription notice
Close access options