In UK patent 2259679 Short Brothers plc describe an aircraft structural component such as an engine nacelle nose cowl. It comprises a forward compartment formed by a forward bulkhead and a skin structure which has an outer surface to be protected from accumulation of ice. A rear compartment is formed between the forward bulkhead and a rear bulkhead. A supply duct extends through the rear compartment and into the forward compartment for the delivery of pressurized hot gases to the inner surface of the skin structure. A protective shroud duct surrounds the supply duct between rear bulkhead and forward bulkhead and forms an annular space around the supply duct. The annular space is closed at the rear bulkhead and throughout its length within the rear compartment by a shroud duct and is open at its forward end into the forward compartment. Leakage of hot gases from the supply duct on rupture are therefore prevented by the shroud duct from entering into the rear compartment. A duct is provided for discharging spent gases from the forward compartment to the atmosphere.
Article navigation
Review Article|
January 01 1994
Patent abstracts Available to Purchase
Publisher: Emerald Publishing
Online ISSN: 2059-9366
Print ISSN: 0002-2667
© MCB UP Limited
1994
Aircraft Engineering (1994) 66 (1): 29.
Citation
(1994), "Patent abstracts". Aircraft Engineering, Vol. 66 No. 1 pp. 29, doi: https://doi.org/10.1108/eb037468
Download citation file:
96
Views
Suggested Reading
Month in the Patent Office
Aircraft Engineering (August,1953)
Crew Compartment and Aircraft Systems
Aircraft Engineering (August,1965)
VAK 191B construction
Aircraft Engineering (July,1973)
Month in the Patent Office
Aircraft Engineering (February,1953)
Design and topological optimization of rear pressure bulkhead for a typical aircraft
Aircraft Engineering and Aerospace Technology: An International Journal (August,2021)
Related Chapters
Offshore construction of bulkhead waste facilities by H-joint steel pipe sheet piles
BGA International Conference on Foundations: Innovations, observations, design and practice: Proceedings of the international conference organised by British Geotechnical Association and held in Dundee, Scotland on 2 – 5th September 2003
Improving the emergency drawdown reliability at Llyn Brenig reservoir
Smart Dams and Reservoirs: Proceedings of the 20th Biennial Conference of the British Dam Society held at Swansea University from 13th–15th September 2018
Sluiceway isolation for gate replacement at Kotri Barrage in Pakistan
Reservoirs in a Changing World: Proceedings of the 12th conference of the BDS held at TRINITY COLLEGE, DUBLIN 4 – 8 September 2002
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
