Fourth international conference on Current and future trunds in Bridge design, construction and maintenance: Proceedings of the 4th international Conference organised on behalf of the Structural and Buildings Board of the Institution of civil Engineers, and held in kuala Lumpur, Malaysia, 10–11 October 2005
Edited by
Emerald Publishing Limited
ISBN print:
978-0-7277-3742-7
Publication date:
2006
Book Chapter
Channel Tunnel Rail Link – Contract 342 Installation of Bridge 3590
By
Rce Huggard
Rce Huggard
FaberMaunsell Ltd London UK
Search for other works by this author on:
Rce Huggard
FaberMaunsell Ltd London UK
-
Published:2006
Citation
Rce Huggard, 2006. "Channel Tunnel Rail Link – Contract 342 Installation of Bridge 3590", Fourth international conference on Current and future trunds in Bridge design, construction and maintenance: Proceedings of the 4th international Conference organised on behalf of the Structural and Buildings Board of the Institution of civil Engineers, and held in kuala Lumpur, Malaysia, 10–11 October 2005, Ben Barr
Download citation file:
Open figure viewer
Introduction
Overall Programme
Site Constraints
Form Of The Bridge
How To Move The bridge
How To Lift The Bridge
Tolerances To Be Achieved
Control Measures To Achieve Tolerances
Foundations
The Weekend
The Achievement
Acknowledgements
This content is only available via PDF.
You do not currently have access to this chapter.
Email alerts
Related Book Content
Related Articles
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
