E.M. Wright, R.F. Mathews, MA(Cantab), MICE, 1991. "25. Preliminary work for stage 2 decommissioning of B16 pile chimney", Civil engineering in the nuclear industry: Proceedings of the conference organized by the Institution of Civil Engineers and held in Windermere on 20–22 March 1991, R Dexter-Smith
Download citation file:
Planning of the second stage of decommissioning of the two pile chimneys at Sellafield started vfriile work was underway on the first stage, which involved removal of the sections above the filters. The second stage requires the removal of all radio-active parts and the dismantling of the filter and diffuser sections, and has to be completed by 1997, The planning involved studying the many possible options and their effects on both radiological and industrial safety.
SYNOPSIS
INTRODUCTION
PLANNING AND STUDIES
CONCLUSIONS