Clunie Dam Anchoring Works
-
Published:2008
A W Gregory, A E Henderson, K C Henderson, P Nowak, 2008. "Clunie Dam Anchoring Works", Ensuring reservoir safety into the future: Proceedings of the 15th Conference of the British Dam Society at the University of Warwick from 10–13 September 2008, Henry Hewlett
Download citation file:
Following the statutory inspection of the Loch Tummel reservoir “matters in the interest of safety” were raised requiring a stability analysis be carried out to check the behaviour of the dam under load from a Probable Maximum Flood (PMF) event and also from a seismic event.
The paper describes the analysis; site investigation; subsequent design; and on-site construction works to implement a dam anchoring scheme which meets the requirements of the Qualified Civil Engineer.
SYNOPSIS
INTRODUCTION
GENERAL DESCRIPTION OF DAM
SECTION 10 INSPECTION REQUIREMENTS
INVESTIGATION PHASE
ANCHOR DESIGN
IMPLEMENTATION
CONCLUSION