Failure impact assessment of a mine site flood levee in Australia
-
Published:2006
Rachel Pether, 2006. "Failure impact assessment of a mine site flood levee in Australia", Improvements in reservoir construction, operation and maintenance: Proceedings of the 14th Conference of the British Dam Society at the University of Durham from 6 to 9 September 2006, Henry Hewlett
Download citation file:
Synopsis
Coal production from the 200 million tonne Curragh North coal resource in Central Queensland commenced in late 2005. The mine is located on the eastern floodplain of the Mackenzie River, and requires a 22 km long flood levee before operations can proceed. The earthfill embankment will generally be 1 m to 5 m in height; however, in eight locations the height will be between 11 m and 15 m. Although the levee's primary function is to protect the mine from flooding it will also form part of the site water management plan, retaining run-off across the 31 km2 site.
Under the Queensland Water Act 2000, a dam is referable and requires licensing if there is a population at risk (PAR) below the dam. Five potentially affected low-lying homesteads were identified over a 50 km downstream reach of the flood plain. An assessment of maximum breach characteristics was made using the mine layout and the State of Queensland Department of Natural Resources and Mines (DNRM) Guidelines. The unsteady hydraulic modelling program HEC RAS was used to model the breach impact at the homestead locations for both sunny-day and flood events. The assessment concluded that the levee is non-referable and a costly dam safety management program is therefore not required.
The Curragh North Open-Cut Coal Mine Project
The Flood Levee
Water management Philosophy
The Need for a Dam Failure Impact Assessment of the Curragh North Flood Levee
Analyses of Flood Inundation
Dambreak Estimates
Conclusions